PROJ BENCHMARK MAG NAIL #5 BROADWAY Site... · 6" CMP CULVERT INV. = 156.19 EXISTING 6" CMP CULVERT...
Transcript of PROJ BENCHMARK MAG NAIL #5 BROADWAY Site... · 6" CMP CULVERT INV. = 156.19 EXISTING 6" CMP CULVERT...
U.P.?
J/16 not found
BENCHMARK TOP OF LEANING I. ROD (SOLID)
ELEV = 151.37'
PROJ BENCHMARK MAG NAIL #5
ELEV = 165.24'
5
0
'
50'
50'
5
0
'
5
0
'
5
0
'
50'
5
0
'
2
5
'
25'
25'
2
5
'
2
5
'
B 2
B 3
B 4
B 5
B 6
B 7
B 8
B 9
B 10
B 11
B 12
B 13
B 14
A 2
A 3
A 4
A 5
A 6
A 7
A 1
C 2
C 3
C 4
C 5
C 6
C 7
C 8C 9
D 2
D 3
D 13
J 3
J 4
J 5
J 6
J 9
J 10
J 11
J 12
J 13
J 14
J 15
G 1
G 2
G 3
G 4
G 5
G 6
G 7
G 8G 9
G 10
G 11
H 4
H 3
1
0
0
'
1
0
0
'
1
0
0
'
2
5
'
25'
25'
2
5
'
2
5
'
100'
1
0
0
'
1
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
5
0
'
5
0
'
5
0
'
2
5
'
2
5
'
2
5
'
25'
100'
50'
50'
50'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
50'
25'
25'
25'
25'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
25'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
200'
F 2
F 1
E 2
2
5
'
2
5
'
5
0
'
5
0
'
F 3
J 17
E 1A
2
5
'
2
5
'
5
0
'
5
0
'
5
0
'
5
0
'
1
0
0
'
1
0
0
'
H 4A
1
5
8
1
5
2
1
5
0
1
5
0
1
6
2
1
6
6
BR
OA
DW
AY
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-0+
09.1
6
1
+
0
0
2
+
0
0
3
+
0
0
4
+
0
0
5
+
0
0
6
+
0
0
7
+
0
0
8+00
158
1
6
0
1
6
2
1
6
6
1
6
4
1
5
8
1
6
0
152
154
1
5
8
1
5
6
IT1
IT2
LOCUS MAP
NOT TO SCALE
LOCUS
N/F
ASSESSORS REFERENCE
NOW OR FORMERLY OF
WETLAND LINE
MAP 467 BLOCK 185 PARCEL 20
LEGEND
25' NO DISTURB BUFFER ZONE
25' 25' 25' 25' 25'
50' NO BUILD BUFFER ZONE
50' 50' 50' 50' 50'
100' BUFFER ZONE
100' 100' 100' 100' 100'
STONE WALL
A14
WETLAND FLAG
SCALE: 1" = 40'
0 FT
SITE PLAN
ASSESSOR'S REFERENCE
MAP 539, BLOCK 439, LOT 10C
MAP 539, BLOCK 439, LOT 9A
404080
CB 1
W/ CONTECH UNIT
RIM = 162.98
12" INV. OUT = 159.75
CB 2
RIM = 157.08
12" INV. OUT = 154.35
DMH 1
W/ CONTECH UNIT
RIM = 157.25
12" INV. IN = 154.25
12" INV. OUT = 154.25
PROPOSED
INFILTRATION BASIN 2
(SEE DETAIL)
PROPOSED
INFILTRATION BASIN 1
(SEE DETAIL)
PROPOSED
RETAINING WALL
(SEE DETAIL)
EXISTING
6" CMP CULVERT
INV. = 156.19
EXISTING
6" CMP CULVERT
INV. = 155.23
PROPOSED
8" HDPE CULVERT
INV. = 155.61
PROPOSED
8" HDPE CULVERT
INV. = 156.19
PROPOSED
RETAINING WALL
(SEE DETAIL)
N/F
DOUGLAS DAWKINS
N/F
JUDITH CHUPASKO
N/F
JR BUILDERS
EDGE OF BORDERING
VEGETATED WETLAND
AS DELINEATED BY
HUGHES ENVIRONMENTAL
EXISTING
DWELLING
TO BE REMOVED
EXISTING SHED
TO BE REMOVED
EXISTING
DIRT PATH TO BE
RE-VEGETATED
PROPOSED
WETLAND
REPLICATION AREA
(SEE DETAIL)
© 2019 CHRISTIANSEN & SERGI
SHEET 1 OF 6
DATE: JANUARY 9, 2019
CHRISTIANSEN & SERGI
PROFESSIONAL ENGINEERS & LAND SURVEYORS
A DIVISION OF THE MORIN-CAMERON GROUP, INC.
160 SUMMER STREET, HAVERHILL, MASSACHUSETTS 01830
WWW.CSI-ENGR.COM TEL. 978-373-0310 FAX. 978-372-3960
OWNER / APPLICANT:
BRADFORD CHRISTIAN ACADEMY
97 OXFORD AVENUE
HAVERHILL, MA 01835
SITE ACCESS PLAN
FOR
1104 BROADWAY
IN
HAVERHILL, MA
GRADING
AND
DRAINAGE
PLAN
PROFESSIONAL
ENGINEER
DWG. NO. 3788012
PROPOSED
8" WATER SERVICE
REVISED: JANUARY 25, 2019
J/16 not found
BENCHMARK TOP OF LEANING I. ROD (SOLID)
ELEV = 151.37'
C 2
C 3
C 4
C 5
C 6
C 7
C 8C 9
D 1
D 2
D 3
D 4
D 5
D 6
D 7
D 8
D 9
D 10
D 11
D 12
D 13
D 14
D 15
D 16
J 1
J 2
J 3
J 4
J 5
J 6
J 7
J 8
J 9
J 10
J 11
J 12
J 13
J 14
J 15
H 4
H 3
100'
1
0
0
'
1
0
0
'
5
0
'
5
0
'
5
0
'
2
5
'
2
5
'
2
5
'
25'
J 17
J 18
J 19
J 20
J 21
J 22
J 23
J 24
J 25
J 27
J 28
J 29
J 30
J 31
J 32
J 33
J 34
J 35
J 36
J 37
J 38
J 39
J 40
J 41
J 42
J 43
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
200'
2
0
0
'
200'
200'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
200'
200'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
200'
200'
L 4
L 3
L 2
L 1
K 1
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
100'
1
0
0
'
1
0
0
'
100'
10
0'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
100'
100'
1
0
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
50'
50'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
50'
50'
50'
5
0
'
5
0
'
50
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
50'
5
0
'
5
0
'
50'
50'
50'
5
0
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
25'
25'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
25'
25'
25'
2
5
'
25'
25
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
2
5
'
25'
25'
25'
2
5
'
J 33A
D 15A
H 4A
1
7
0
1
8
8
176
1
5
0
1
6
0
1
7
8
1
7
6
1
7
0
1
6
0
1
5
0
142
1
5
0
1
5
0
1
5
8
138
1
6
0
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
8+00
9+00
1
0
+
0
0
1
1
+
0
0
1
6
0
1
6
2
1
6
4
1
6
6
152
154
IT3
154
1
5
6
SCALE: 1" = 40'
0 FT
SITE PLAN
404080
PROPOSED
20' WIDE
ACCESS DRIVE
PROPOSED
TREELINE
24" RCP CULVERT
INV. = 148.56
24" RCP CULVERT
INV. = 148.73
LIMIT OF 100'
BUFFER ZONE
(TYPICAL)
LIMIT OF 25'
NO DISTURB ZONE
(TYPICAL)
LIMIT OF 50'
NO BUILD ZONE
(TYPICAL)
MEAN ANNUAL HIGH
WATER LINE AS DELINEATED
BY HUGHES ENVIRONMENTAL
LIMIT OF 200'
RIVERFRONT AREA
(TYPICAL)
PROPOSED
8' W X 6' D
BOX CULVERT
(SEE DETAIL)
PROPOSED
RETAINING WALL
(SEE DETAIL)
EXISTING
DIRT PATH TO BE
RE-VEGETATED
N/F
JUDITH CHUPASKO
© 2019 CHRISTIANSEN & SERGI
SHEET 2 OF 6
DATE: JANUARY 9, 2019
CHRISTIANSEN & SERGI
PROFESSIONAL ENGINEERS & LAND SURVEYORS
A DIVISION OF THE MORIN-CAMERON GROUP, INC.
160 SUMMER STREET, HAVERHILL, MASSACHUSETTS 01830
WWW.CSI-ENGR.COM TEL. 978-373-0310 FAX. 978-372-3960
OWNER / APPLICANT:
BRADFORD CHRISTIAN ACADEMY
97 OXFORD AVENUE
HAVERHILL, MA 01835
SITE ACCESS PLAN
FOR
1104 BROADWAY
IN
HAVERHILL, MA
GRADING
AND
DRAINAGE
PLAN
PROFESSIONAL
ENGINEER
PROPOSED
8" WATER SERVICE
EXTENT OF
RESTORED BANK
(SEE DETAIL)
EXTENT OF
RESTORED BANK
(SEE DETAIL)
DWG. NO. 3788012
REVISED: JANUARY 25, 2019
PROPOSED
INFILTRATION BASIN 3
(SEE DETAIL)
PROPOSED
CURB OPENING WITH
PAVED APRON
PROPOSED
OVERFLOW
(SEE DETAIL)
U.P.?
J/16 not found
BENCHMARK TOP OF LEANING I. ROD (SOLID)
ELEV = 151.37'
PROJ BENCHMARK MAG NAIL #5
ELEV = 165.24'
5
0
'
50'
50'
5
0
'
5
0
'
5
0
'
50'
5
0
'
2
5
'
25'
25'
2
5
'
2
5
'
B 2
B 3
B 4
B 5
B 6
B 7
B 8
B 9
B 10
B 11
B 12
B 13
B 14
A 2
A 3
A 4
A 5
A 6
A 7
A 1
C 2
C 3
C 4
C 5
C 6
C 7
C 8C 9
D 2
D 3
J 3
J 4
J 5
J 6
J 9
J 10
J 11
J 12
J 13
J 14
J 15
G 1
G 2
G 3
G 4
G 5
G 6
G 7
G 8G 9
G 10
G 11
H 4
H 3
1
0
0
'
1
0
0
'
1
0
0
'
2
5
'
25'
25'
2
5
'
2
5
'
100'
1
0
0
'
1
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
5
0
'
5
0
'
5
0
'
2
5
'
2
5
'
2
5
'
25'
100'
50'
50'
50'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
50'
25'
25'
25'
25'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
25'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
200'
F 2
F 1
E 2
2
5
'
2
5
'
5
0
'
5
0
'
F 3
J 17
E 1A
2
5
'
2
5
'
5
0
'
5
0
'
5
0
'
5
0
'
1
0
0
'
1
0
0
'
H 4A
1
5
8
1
5
2
1
5
0
1
5
0
1
6
2
1
6
6
BR
OA
DW
AY
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-0+
09.1
6
1
+
0
0
2
+
0
0
3
+
0
0
4
+
0
0
5
+
0
0
6
+
0
0
7
+
0
0
8+00
158
1
6
0
1
6
2
1
6
6
1
6
4
1
5
8
1
6
0
152
154
1
5
8
1
5
6
IT1
IT2
SCALE: 1" = 40'
0 FT
SITE PLAN
404080
N/F
DOUGLAS DAWKINS
N/F
JUDITH CHUPASKO
N/F
JR BUILDERS
© 2019 CHRISTIANSEN & SERGI
SHEET 3 OF 6
DATE: JANUARY 9, 2019
CHRISTIANSEN & SERGI
PROFESSIONAL ENGINEERS & LAND SURVEYORS
A DIVISION OF THE MORIN-CAMERON GROUP, INC.
160 SUMMER STREET, HAVERHILL, MASSACHUSETTS 01830
WWW.CSI-ENGR.COM TEL. 978-373-0310 FAX. 978-372-3960
OWNER / APPLICANT:
BRADFORD CHRISTIAN ACADEMY
97 OXFORD AVENUE
HAVERHILL, MA 01835
SITE ACCESS PLAN
FOR
1104 BROADWAY
IN
HAVERHILL, MA
EROSION
AND
SEDIMENTATION
CONTROL
PLAN
PROFESSIONAL
ENGINEER
PROPOSED
SEDIMENTATION
CONTROL BARRIER
(SEE DETAIL)
CHECK DAM
(TYP.)
CATCH BASIN
INLET PROTECTION (TYP.)
(SEE DETAIL)
CRUSHED STONE
CONSTRUCTION ENTRANCE
(SEE DETAIL)
Erosion and Sedimentation Control Plan
The Erosion and Sedimentation Control Plan (ESCP) provides the developer and the
contractor with erosion prevention information and Best Management Practices (BMP's) to be
used during project construction to prevent the generation of erosion products and their
transport to environmentally sensitive areas. Environmentally sensitive areas include all
designated resource areas downstream of the Site, and those areas of the Site that do no need
to be altered for development purposes.
The most important BMP is maintaining a rapid construction process, resulting in prompt
stabilization of surfaces, thereby reducing erosion potential. Given the primacy of rapid
construction, the ESCP has been designed to allow construction progress with essentially no
hindrance by the erosion control methods prescribed. THE ESCP has also been designed with
sufficient flexibility to allow the contractor to modify the suggested methods as required to suit
seasonal, atmospheric, and site specific physical constraints. Another important BMP is the
prevention of concentrated water flow. Sheet flow does not have the erosive potential of a
concentrated rivulet. The ESCP recommends construction methods that allow localized erosion
control and a system of construction which inhibits the development of shallow concentrated
flow. These BMP's should be maintained through the construction process.
RESPONSIBILITY OF THE CONTRACTOR
The contractor shall be solely responsible for erosion and sedimentation control at the Site.
The contractor shall utilize a system of operations and all necessary erosion and sedimentation
control measures, even if not specified herein or elsewhere, to minimize erosion damage at the
Site. The BMP's presented in the ESCP should be used as a guide for erosion and
sedimentation control and are not intended to be considered specifications for construction.
BMP's FOR CONSTRUCTION
Clearing:
- Vehicles used the wood clearing process shall remain within the approved limits of work.
- Wheel ruts shall be filled in and graded to prevent concentration of storm water runoff.
- Vehicle tracks leading downhill shall be blocked during periods of intense precipitation
by hay bales, dikes, or silt fences which shall be installed to entrap the sediment.
- Consideration shall be given to chipping of brush and branches that generate wood chip
mulch for the use in stabilization of disturbed surfaces.
- No spoil (e.g., tree stumps) shall be disposed of by burying.
Grubbing, Stripping and Grading:
- Erosion Controls devised shall be in place as shown on the design plans before grading
commences.
- A Crushed Stone Construction Entrance shall be installed as soon as the start of
construction. The stabilized construction entrance will be inspected daily for sediment
tracked on the road, for clean gravel, and to make sure that the all traffic uses the
stabilized entrance when leaving the site.
- As much topsoil as possible shall be stockpiled for on-site use.
- Stripping shall be done in a manner which will not concentrate runoff. If precipitation is
expected, earthen berms shall be constructed around the area being stripped, with a silt
fence or hay bale dikes located in an arc at the low point of the berm.
- If intense precipitation is anticipated, hay bales, dikes and/or silt fences shall be used as
required to prevent erosion and sediment transport. The materials required shall be
stored on site al all times.
- If water is required for soil compaction, it shall be added in a uniform manner that does
not allow excess water to flow off the area being compacted.
- Dust should be held at a minimum by sprinkling exposed soil with at appropriate amount
of water.
Maintenance of Disturbed Surfaces
- Runoff shall be diverted from disturbed side slopes in both cut and fill.
- Mulching may be used for temporary stabilization.
- Hay bale dikes or silt fences shall be set where required to trap sediment and shall be
maintained on a continual basis throughout the construction process.
Loaming and Seeding
- Loaming and seeding of slopes shall be an ongoing construction process and is not
limited to any one phase of construction.
- Loam shall not be placed unless it is to be seeded directly thereafter.
- All disturbed areas shall have a minimum of 4" of loam placed before being seeded and
mulched.
- Consideration should be given to hay-mulching, especially on slopes in excess of 3 to 1.
- Loamed and seeded slopes shall be protected from washout by mulching or other
acceptable slope protection until vegetation begins to grow.
- All exposed areas shall be stabilized within 30 days of being excavated even if further
work is anticipated for that particular area.
Storm Water Collection System Installation
- Staked hay bales shall be installed around each catch basin upon installation and shall
remain in place until the binder pavement is installed. After binder pavement, Siltsacks
shall be installed in each catch basin and shall be maintained until all upgradient
contributing areas are stabilized.
- Check dams (crushed stone, staked hay bales, or staked silt socks) shall be installed
along the roadway gutter. The check dams shall be maintained until upgradient
contributing areas are stabilized.
Stabilization of Surfaces
- Stabilization of surfaces shall be an ongoing process.
- Stabilization of surfaces included the placement of pavement, rip rap, bark mulch and
the establishment of vegetated surfaces.
- Upon the completion of construction, all surfaces shall be stabilized even though it is
apparent that the future construction efforts will cause their disturbance. In no case left
open greater than 30 days.
- Vegetated cover shall be established during the proper growing season and should be
enhanced by soil adjustment for proper pH, nutrients and moisture content.
- Surfaces that are disturbed by erosion processes, vandalism or by construction shall be
stabilized as soon as possible, in no case greater than 30 days.
- Hay-mulching of grass surfaces is recommended, especially if seeding of the surfaces
is required outside the normal growing season.
- Erosion control blankets are recommended for steep slopes (greater than 3:1).
NOTES:
1. THE TEMPORARY EARTH STOCKPILE LOCATIONS SHOWN ARE INTENDED TO BE
REPRESENTATIVE OF AVAILABLE AREAS WHERE STOCKPILES MAY BE LOCATED.
STOCKPILES ARE TO BE LOCATED IN AREAS OF RELATIVELY FLAT SLOPES OUTSIDE OF
IMMEDIATE WORK AREAS AND AT A MINIMUM OF 100' FROM ALL JURISDICTIONAL WETLAND
RESOURCE AREAS.
2. DEWATERING AREAS, IF REQUIRED, ARE TO BE LOCATED IN AREAS OF RELATIVELY FLAT
SLOPES OUTSIDE OF IMMEDIATE WORK AREAS AND AT A MINIMUM OF 100' FROM ALL
JURISDICTIONAL WETLAND RESOURCE AREAS.
3. NO MACHINERY WILL BE STORED WITHIN 100' OF ANY RESOURCE AREA, AND ALL MACHINERY
WILL BE INSPECTED DAILY FOR LEAKING FLUIDS. CHEMICALS, FERTILIZERS, PESTICIDES,
HERBICIDES, ETC. SHALL NOT BE USED OR STORED WITHIN 100' OF A JURISDICTIONAL
RESOURCE AREA.
4. THE CHECK DAMS IN THE UPGRADIENT SWALES SHALL BE THE PRIMARY SEDIMENT TRAPS
DURING CONSTRUCTION.
5. THIS PROJECT IS SUBJECT TO THE REQUIREMENTS OF THE CONSTRUCTION GENERAL
PERMIT UNDER THE EPA'S N.P.D.E.S. PROGRAM AND MUST BE IMPLEMENTED IN
ACCORDANCE WITH THE S.W.P.P.P. PREPARED FOR THE PROJECT.
DWG. NO. 3788012
REVISED: JANUARY 25, 2019
J/16 not found
BENCHMARK TOP OF LEANING I. ROD (SOLID)
ELEV = 151.37'
C 2
C 3
C 4
C 5
C 6
C 7
C 8C 9
D 1
D 2
D 3
D 4
D 5
D 6
D 7
D 8
D 9
D 10
D 11
D 12
D 13
D 14
D 15
D 16
J 1
J 2
J 3
J 4
J 5
J 6
J 7
J 8
J 9
J 10
J 11
J 12
J 13
J 14
J 15
H 4
H 3
100'
1
0
0
'
1
0
0
'
5
0
'
5
0
'
5
0
'
2
5
'
2
5
'
2
5
'
25'
J 17
J 18
J 19
J 20
J 21
J 22
J 23
J 24
J 25
J 27
J 28
J 29
J 30
J 31
J 32
J 33
J 34
J 35
J 36
J 37
J 38
J 39
J 40
J 41
J 42
J 43
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
200'
2
0
0
'
200'
200'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
200'
200'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
2
0
0
'
200'
200'
L 4
L 3
L 2
L 1
K 1
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
100'
1
0
0
'
1
0
0
'
100'
10
0'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
1
0
0
'
100'
1
0
0
'
1
0
0
'
1
0
0
'
100'
100'
1
0
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
50'
50'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
50'
50'
50'
5
0
'
5
0
'
50
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
5
0
'
50'
5
0
'
5
0
'
50'
50'
50'
5
0
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
25'
25'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
25'
25'
25'
2
5
'
25'
25
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
2
5
'
25'
2
5
'
2
5
'
25'
25'
25'
2
5
'
J 33A
D 15A
H 4A
1
7
0
1
8
8
176
1
5
0
1
6
0
1
7
8
1
7
6
1
7
0
1
6
0
1
5
0
142
1
5
0
1
5
0
1
5
8
138
1
6
0
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
-
W
-
8+00
9+00
1
0
+
0
0
1
1
+
0
0
1
6
0
1
6
2
1
6
4
1
6
6
152
154
IT3
154
1
5
6
2
5
'
2
5
'
25'
2
5
'
-W
-
-W
-
-W
-
9+00
SCALE: 1" = 40'
0 FT
SITE PLAN
404080
N/F
JUDITH CHUPASKO
© 2019 CHRISTIANSEN & SERGI
SHEET 4 OF 6
DATE: JANUARY 9, 2019
CHRISTIANSEN & SERGI
PROFESSIONAL ENGINEERS & LAND SURVEYORS
A DIVISION OF THE MORIN-CAMERON GROUP, INC.
160 SUMMER STREET, HAVERHILL, MASSACHUSETTS 01830
WWW.CSI-ENGR.COM TEL. 978-373-0310 FAX. 978-372-3960
OWNER / APPLICANT:
BRADFORD CHRISTIAN ACADEMY
97 OXFORD AVENUE
HAVERHILL, MA 01835
SITE ACCESS PLAN
FOR
1104 BROADWAY
IN
HAVERHILL, MA
PROFESSIONAL
ENGINEER
PROPOSED
SEDIMENTATION
CONTROL BARRIER
(SEE DETAIL)
INLET PROTECTION (TYP.)
(SEE DETAIL)
CHECK DAM
(TYP.)
EROSION
AND
SEDIMENTATION
CONTROL
PLAN
PROPOSED
SAND BAGS
PUMP STREAM
AROUND CULVERT
DURING INSTALLATION
STREAM DEWATERING DETAIL
SCALE: 1" = 10'
DWG. NO. 3788012
REVISED: JANUARY 25, 2019
EDGE OF BORDERING
VEGETATED WETLAND
AS DELINEATED BY
HUGHES ENVIRONMENTAL
NOT TO SCALE
1-0" MIN.
NOT TO SCALE
6" MIN.
D
AT TOP OF PIPE
D + 2'-0" MAX.
SUBDIVISION STREET
EX
IS
TIN
G R
OA
D
PLAN VIEW
INFRARED JOINT
1' MINIMUM OR AS
NEEDED IN FIELD
2" BINDER COURSE
(NOT TO SCALE)
15" GRAVEL BASE
1-1/2" TOP COURSE
EX
IST
ING
RO
AD
WA
Y B
AS
E
EX
IST
ING
BIN
DE
R A
ND
TO
P C
OU
RS
E
1' MIN. OR AS NEEDED IN FIELD
SECTION VIEW
10'
10'
25 MIN.
10'
MIN.
50' MIN.
EXISTING
GROUND
1" TO 2" CRUSHED
STONE, TO A MINIMUM
DEPTH OF 6"
EXISTING
PAVEMENT
NOT TO SCALE
THE CRUSHED STONE ENTRANCE SHALL BE MAINTAINED IN A
CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF
SEDIMENT ONTO THE ADJACENT ROADWAY.
CRUSHED STONE CONSTRUCTION ENTRANCE
PLAN
SECTION
CATCH BASIN INLET PROTECTION DETAIL 1
NOT TO SCALE
1. SILTSACK OR EQUIVALENT PRODUCT TO BE USED.
NOT TO SCALE
CATCH BASIN INLET PROTECTION DETAIL 2
PUMP
FLOW IN
DISCHARGE
FILTERED WATER
DISCHARGE
AGGREGATE UNDERLAYMENT
DEWATERING BAG
12"-18"
12"-24" DIA.
PERFORATED
HDPE PIPE
12" MIN.
1-1/2" CRUSHED
STONE
HOSE TO
PUMP
TOP VIEW
SIDE VIEW
DEWATERING BAG DETAIL
NOT TO SCALE
TIE-DOWN
STRAP
SEWN IN
SPOUT
DEWATERING BAG
DEWATERING SUMP DETAIL
NOT TO SCALE
Filtrexx®SiltSoxx™
Plan View
Work Area Filtrexx® CompostSiltSoxx™
RunoffArea to be Protected
Notes:1. All material to meet Filtrexx®specifications.2. SiltSoxx™ compost/soil/rock/seed fill to meet application requirements.3. SiltSoxx™ depicted is for minimum slopes. Greater slopes may require larger socks per the Engineer.4. Compost material to be dispersed on site, as determined by the Environmental Monitor.
Filtrexx® SiltSoxx™ Section
Work AreaArea to be Protected
Filtrexx®SiltSoxx™(12" +/- Dia.)
SEDIMENTATION CONTROL DETAIL 2
2
:
1
M
A
X
.
2
:
1
M
A
X
.
GRASS STRIP
1'
2" BINDER COURSE
(NOT TO SCALE)
8" C.L.D.I. WATER MAIN
2%
1-1/2" TOP COURSE
20'-0" WIDTH OF PAVEMENT
L
C
5' MIN.
3'
2
:
1
M
A
X
.
2%
SLO
PE
2
:
1
M
A
X
.
& SEED
4" LOAM
GRASS STRIP
3'
9" BANK RUN GRAVEL
6" PROCESSED GRAVEL
PERCENT PASSING
95-100
0-25
0-5
SIZE OF STONE
8 IN.
4 IN.
2-1/2
MODIFIED ROCKFILL SHALL CONSIST OF HARD, DURABLE ANGULAR SHAPED STONES
WHICH ARE THE PRIMARY PRODUCT OF A STONE CRUSHER. ROUNDED STONE,
BOULDERS, SANDSTONE & SIMILAR SOFT STONE OR RELATIVELY THIN SLABS ARE NOT
ACCEPTABLE. THE STONE SHALL BE FREE FROM OVERBURDEN, SPOIL, SHALE, &
ORGANIC MATTER & SHALL MEET THE FOLLOWING GRADATION REQUIREMENTS:
DETAIL ~ STONE FOR PIPE ENDS
NOT TO SCALE
7
5
°
2" BINDER COURSE
1-1/2" TOP COURSE
TYPE "A" BERM
3"
1'-0"
VA
RIE
S
LEVEL S
L
O
P
E
V
A
R
IE
S
COMPACTED SUBGRADE
8" CRUSHED STONE BASE
1'-8"
*
*THIS DIMENSION VARIES WITH THE THICKNESS OF THE TOP COURSE
AND SLOPE OF SHOULDER
4"
HOT MIX ASPHALT BERM TYPE "A" (MODIFIED)
NOTES:
3NOT TO SCALE
© 2019 CHRISTIANSEN & SERGI
SHEET 5 OF 6
DATE: JANUARY 9, 2019
CHRISTIANSEN & SERGI
PROFESSIONAL ENGINEERS & LAND SURVEYORS
A DIVISION OF THE MORIN-CAMERON GROUP, INC.
160 SUMMER STREET, HAVERHILL, MASSACHUSETTS 01830
WWW.CSI-ENGR.COM TEL. 978-373-0310 FAX. 978-372-3960
OWNER / APPLICANT:
BRADFORD CHRISTIAN ACADEMY
97 OXFORD AVENUE
HAVERHILL, MA 01835
SITE ACCESS PLAN
FOR
1104 BROADWAY
IN
HAVERHILL, MA
CONSTRUCTION
DETAILS
PROFESSIONAL
ENGINEER
DWG. NO. 3788012
REVISED: JANUARY 25, 2019
NOT TO SCALE
NOT TO SCALE
BRICK
CONSTRUCTED OF RED
INVERTS ARE TO BE
48''
24'' I.D.
8" 8"
2"
4'-0" DIA.
WATER LEVEL
6" MIN.
4'-0"
3'-0"
6"
"SNOUT" (OR
APPROVED EQUAL)
OIL/DEBRIS HOOD
100-YEAR PEAK
STORAGE ELEV.
EXCAVATE AND REMOVE TOPSOIL AND SUBSOIL
WHERE FILL IS REQUIRED. FILL IS TO CONSIST
OF COMPACTED ON-SITE BORROW PLACED IN
12" MAX. LIFTS. THE FILL IS TO BE APPROVED BY
THE PROJECT ENGINEER PRIOR TO PLACEMENT.
(D)
10'
INFILTRATION / DETENTION BASIN ELEVATIONS
TYPICAL INFILTRATION/ DETENTION BASIN DETAIL
NOT TO SCALE
4" LOAM AND SEED (OR SOD) TO BE
PLACED OVER ALL DISTURBED AREAS
4' MIN.
LEVEL
SECTION
BERM
ELEV. (B) = 100 YEAR PEAK
STORAGE ELEVATION + 12" MIN.
3 MIN.
1
3 (TYP.)
1
OR
IGIN
AL G
RO
UN
D
BOTTOM ELEV. (A)
EMERGENCY
SPILLWAY
ELEV. (C)
3
1
3
1
INFILTRATION
BASIN
1
BOTTOM OF BASIN
ELEV. (A)
TOP OF BERM
ELEV. (B)
EMERGENCY
SPILLWAY ELEV. (C)
EMERGENCY SPILLWAY
OVERFLOW WIDTH (D)
159.00 161.00162.00 160.71
INFILTRATION BASIN EXCAVATION & FILL:
ALL TOPSOIL, SUBSOIL, AND OTHER UNSUITABLE MATERIALS
ARE TO BE REMOVED FROM THE LOCATION OF THE
PROPOSED INFILTRATION SYSTEMS. SAND FILL MEETING THE
REQUIREMENTS OF MASS. TITLE 5 SEPTIC SAND IS TO BE
USED AS NECESSARY TO ACHIEVE SUBGRADE ELEVATION.
1
3 (TYP.)
RIP-RAP TO CONSIST OF MODIFIED ROCKFILL
(M2.02.4) TO A MIN. DEPTH OF 12"
4' MIN.
LEVEL
SECTION
1
3 (MIN.)
TYPICAL C/L PROFILE OF EMERGENCY SPILLWAY
NOT TO SCALE
10'
2 154.00 155.50156.00 155.88
3
4
-1
1
2
"
CRUSHED STONE
* 4" LOAM AND SEED
SHALL BE PROVIDED FOR
DETENTION BASIN 2 IN
LIEU OF CRUSHED
STONE.
PROPOSED
4" UNDERDRAIN
WITH VALVE
4'
2'
12" OF
CRUSHED
STONE
2' OF SOIL TO BE
PLACED ALONG
BOTTOM OF
CULVERT
8' W X 6' D
CONCRETE BOX
CULVERT
8'
EXISTING GRADE
12" DIA. STAKED
COIR FIBER LOG
COMPACTED SIDE SLOPES
SHALL BE TREATED WITH
JUTE NETTING, 4" LOAM AND
HYDRO SEEDED WITH
CONSERVATION MIX
INSTALL WILLOW BEHIND
COIR FIBER LOGS
2" - 4" COBBLE BASE
BLEND BASE TO MEET
CHANNEL ELEVATION AND
WIDTH UP AND DOWN
STREAM
26 TUBELINGS 3' O.C.*
12 TUBELINGS 3' O.C.*
*NATIVE TUBELING SPECIES
TO BE SELECTED BY
WETLAND SCIENTIST BASED
ON FIELD CONDITIONS
EXISTING STREAM
BOTTOM
DRIVEWAY
SURFACE
BLOCK RETAINING WALL
10'
3 158.00 159.50160.00 159.60
CONTECH VORTSENTRY HS WATER QUALITY
UNIT DETAIL ( CB 1, CB 2, DMH 1)
NOT TO SCALE
© 2019 CHRISTIANSEN & SERGI
SHEET 6 OF 6
DATE: JANUARY 9, 2019
CHRISTIANSEN & SERGI
PROFESSIONAL ENGINEERS & LAND SURVEYORS
A DIVISION OF THE MORIN-CAMERON GROUP, INC.
160 SUMMER STREET, HAVERHILL, MASSACHUSETTS 01830
WWW.CSI-ENGR.COM TEL. 978-373-0310 FAX. 978-372-3960
OWNER / APPLICANT:
BRADFORD CHRISTIAN ACADEMY
97 OXFORD AVENUE
HAVERHILL, MA 01835
SITE ACCESS PLAN
FOR
1104 BROADWAY
IN
HAVERHILL, MA
CONSTRUCTION
DETAILS
PROFESSIONAL
ENGINEER
EXIST WETLAND
WE
TL
AN
D B
OU
ND
AR
Y
(V
EG
E. &
S
OIL
S)
MATCH
ELEVATION
EROSION CONTROL
SILT SOCK (TYP)
ADJUST FINISHED GRADE TO
MIMIC EXISTING WETLAND
TOPOGRAPHY (PIT & MOUNDING, ETC.
- DO NOT COMPACT SOILS WITHIN
REPLICATION AREAS).
SLO
PE
< 3
%
UPLAND
WETLAND REPLICATION
HYDRIC SOILS
UNDISTURBED GROUND
Common Name Latin Name Comments Quantity Plant Size Wetland Status
Steeplebush Spiraea tomentosa 4 to 6 feet on center, small shrub - plant in clusters along edge and do not surround with larger shrubs 24 2-3' FACW
Winterberry Holly Ilex verticillata Group in 6 or more, 5 to 7 feet on center 18 3-4' FACW+
Silky Dogwood Cornus amomum Plant 8 to 10 feet on center with tubelings planted 3 feet on center to fill in area around and between plants 18 3-4' FACW
Red-osier Dogwood Cornus sericea Plant 8 to 10 feet on center with tubelings planted 3 feet on center to fill in area around and between plants 24 3-4' FACW+
Silky Dogwood Cornus amomum Plant 3 feet on center around larger of same species to create dense clusters 110* tubelings FACW
Red-osier Dogwood Cornus sericea Plant 3 feet on center around larger of same species to create dense clusters 144* tubelings FACW+
Pussy Willow Salix discolor Plant in groups of 6 or more, 4 to 6 feet on center 30* Tubelings FACW
plant size based on availability - sizes based on New England Wetland Plants - typical.
NOTES:
Excavate to match surrounding BVW elevation. If original wetlandsoil is not encountered, overexcavate 12 inches and use richorganic soil or soil/weed free compost mix to bring area to grade. Grades to be adjusted and plants located under the supervision ofwetland scientist.
Mulch area after planting with leaf litter or leafy compost. Scatterwoody debris amongst plants as directed by wetland scientist.
*Actual quantities to plant and purchase are higher, - available in trays of 38, round up for ordering purposes
BVW restoration area**
**Species and sizes may be adjusted based on plant availability
BOX CULVERT DETAIL
NOT TO SCALE
WETLAND REPLICATION DETAIL
NOT TO SCALE
BANK AND STREAM RESTORATION DETAIL
NOT TO SCALE
DWG. NO. 3788012
REVISED: JANUARY 25, 2019