EXAMPLEPROJECTS
-
8/21/2019 Design 2 Proj
2/13
104 • GOOD INDUSTRY PRACTICES
CONQUAS SCORE: 95.6AVERAGE QUALITY MARK SCORE: 91.7
6 Blocks of 28/ 30-Storey Condominium (Total 910 Units)
a. CITY SQUARE RESIDENCES
-
8/21/2019 Design 2 Proj
3/13
105105
DESIGN AND MATERIALS FOR QUALITY
Modular system RC wall
Capping for M&E pipe prot rusion
PPR (Poly Propylene Randomcopolymer) Pipes
Drywall par t it ions Rebate door with pre-installed architrave
Rectif ied homogeneous tiles
» Less joints & better flat surfaces.
» Hide untidy joints.
» Ease of installation.
» No corrosion.
» Eliminate wet trades.
» Tidy process.
» Good alignment between door frame & leaf.
» No nail-hole patch up.
» Better dimensional and tonal consistency.
-
8/21/2019 Design 2 Proj
4/13
106 • GOOD INDUSTRY PRACTICES
CONQUAS SCORE: 94.8AVERAGE QUALITY MARK SCORE: 87.4
2 Towers of 70 / 63-Storey Condominium (Total 111 1 Units)
b. THE SAIL @ MARINA BAY
-
8/21/2019 Design 2 Proj
5/13
107107
DESIGN AND MATERIALS FOR QUALITY
Curtain wall facade
Drywall partitions
Rectif ied ceramic t iles
Screed-less flooring
Prefabricated Bathroom
Polymer modified adhesive
» Dry and faster installation.
» Better control on alignment and evenness.
» Consistent joint width.
» No wet works.
» Better productivity.
» Speedy construction & consistency in workmanship.
» Better compatibility to tiles.
-
8/21/2019 Design 2 Proj
6/13
108 • GOOD INDUSTRY PRACTICES
CONQUAS SCORE: 94.1AVERAGE QUALITY MARK SCORE: 91.4
5 Blocks of 8-Storey Condomini um (Total 295 Unit s)
C. PARC EMILY
-
8/21/2019 Design 2 Proj
7/13
109109
DESIGN AND MATERIALS FOR QUALITY
Precast components
Honey comb door with lift-off hinges
Screed-less flooring
Prefabricated bathrooms
Epoxy point ing for marble floor
Inner beading betweenceiling and w all
» Quality surface finish and buildabilty.
» Faster installation and better alignment.
» More productive.
» Minimize de-bonding issues.
» Less workmanship issues and off site production.
» Smooth joints and better aesthetics.
» Improves alignment and joints.
-
8/21/2019 Design 2 Proj
8/13
110 • GOOD INDUSTRY PRACTICES
CONQUAS SCORE: 89.4AVERAGE QUALITY MARK SCORE: 88.9
A Mixed Development of 2 01 Resident ial and 13 Commercial Unit s
d. ST REGIS RESIDENCES
-
8/21/2019 Design 2 Proj
9/13
111111
DESIGN AND MATERIALS FOR QUALITY
Prefabricated bathrooms
Drywall partitions
Rectified tiles
Click-fit sockets
Modular system cabinets
» Faster and dry construction.
» Ease of installation and consistent finish.
» Stable dimension.
» Installed after final painting.
» Factory assembled and good dimensional accuracy.
Curtain wall facade
» No scaffolding.
» No wet works.
-
8/21/2019 Design 2 Proj
10/13
112 • GOOD INDUSTRY PRACTICES
CONQUAS SCORE: 91.6AVERAGE QUALITY MARK SCORE: 84.5
2 Blocks of 33 -Storey Condomini um Housing Development
(Total 208 Units)
e. INFINIUM @ EVELYN
-
8/21/2019 Design 2 Proj
11/13
113113
DESIGN AND MATERIALS FOR QUALITY
Precast components
Drywall partitions
» Better quality surface finish.
» Faster construction.
» No wet work.
» Consistent finish.
Modular system cabinets
Internal spray paint ing
Epoxy grouted marble f loorRebate door w ith lift off hinges
» Less manual work and faster installation.
» Consistent finish.
» Smooth and consistent finish after polishing.» Better alignment between frame and panel.
-
8/21/2019 Design 2 Proj
12/13
114 • GOOD INDUSTRY PRACTICES
CONQUAS SCORE: 93.6AVERAGE QUALITY MARK SCORE: 87.42
Total numb er of un it s – 116
f. THE AZURE
-
8/21/2019 Design 2 Proj
13/13
115115
DESIGN AND MATERIALS FOR QUALITY
Modular system components 2-component adhesive for marble f loor
Rectif ied ceramic t iles
Epoxy joints for marble floor
Timber strip wit h plywood base
Honey comb veneer door
» Factory assembled minimize workmanship issues. » Compatible to soft stones.
» Joint consistency.
» Durable joints and easy maintenance.
» Better levelness and invisible nailing.
» Light weight and warp resistant.