    104 • GOOD INDUSTRY PRACTICES

    CONQUAS SCORE: 95.6AVERAGE QUALITY MARK SCORE: 91.7

      6 Blocks of 28/ 30-Storey Condominium (Total 910 Units) 

    a. CITY SQUARE RESIDENCES

  • 8/21/2019 Design 2 Proj

    3/13

    105105

    DESIGN AND MATERIALS FOR QUALITY

    Modular system RC wall

    Capping for M&E pipe prot rusion

    PPR (Poly Propylene Randomcopolymer) Pipes

    Drywall par t it ions Rebate door with pre-installed architrave

    Rectif ied homogeneous tiles

    » Less joints & better flat surfaces.

    » Hide untidy joints.

    » Ease of installation.

    » No corrosion.

    » Eliminate wet trades.

    » Tidy process.

    » Good alignment between door frame & leaf.

    » No nail-hole patch up.

    » Better dimensional and tonal consistency.

  • 8/21/2019 Design 2 Proj

    4/13

    106 • GOOD INDUSTRY PRACTICES

    CONQUAS SCORE: 94.8AVERAGE QUALITY MARK SCORE: 87.4

    2 Towers of 70 / 63-Storey Condominium (Total 111 1 Units) 

    b. THE SAIL @ MARINA BAY

  • 8/21/2019 Design 2 Proj

    5/13

    107107

    DESIGN AND MATERIALS FOR QUALITY

    Curtain wall facade

    Drywall partitions

    Rectif ied ceramic t iles

    Screed-less flooring

    Prefabricated Bathroom

    Polymer modified adhesive

    » Dry and faster installation.

    » Better control on alignment and evenness.

    » Consistent joint width.

    » No wet works.

    » Better productivity.

    » Speedy construction & consistency in workmanship.

    » Better compatibility to tiles.

  • 8/21/2019 Design 2 Proj

    6/13

    108 • GOOD INDUSTRY PRACTICES

    CONQUAS SCORE: 94.1AVERAGE QUALITY MARK SCORE: 91.4

    5 Blocks of 8-Storey Condomini um (Total 295 Unit s) 

    C. PARC EMILY

  • 8/21/2019 Design 2 Proj

    7/13

    109109

    DESIGN AND MATERIALS FOR QUALITY

    Precast components

    Honey comb door with lift-off hinges

    Screed-less flooring

    Prefabricated bathrooms

    Epoxy point ing for marble floor

    Inner beading betweenceiling and w all

    » Quality surface finish and buildabilty.

    » Faster installation and better alignment.

    » More productive.

    » Minimize de-bonding issues.

    » Less workmanship issues and off site production.

    » Smooth joints and better aesthetics.

    » Improves alignment and joints.

  • 8/21/2019 Design 2 Proj

    8/13

    110 • GOOD INDUSTRY PRACTICES

    CONQUAS SCORE: 89.4AVERAGE QUALITY MARK SCORE: 88.9

    A Mixed Development of 2 01 Resident ial and 13 Commercial Unit s 

    d. ST REGIS RESIDENCES

  • 8/21/2019 Design 2 Proj

    9/13

    111111

    DESIGN AND MATERIALS FOR QUALITY

    Prefabricated bathrooms

    Drywall partitions

    Rectified tiles

    Click-fit sockets

    Modular system cabinets

    » Faster and dry construction.

    » Ease of installation and consistent finish.

    » Stable dimension.

    » Installed after final painting.

    » Factory assembled and good dimensional accuracy.

    Curtain wall facade

    » No scaffolding.

    » No wet works.

  • 8/21/2019 Design 2 Proj

    10/13

    112 • GOOD INDUSTRY PRACTICES

    CONQUAS SCORE: 91.6AVERAGE QUALITY MARK SCORE: 84.5

    2 Blocks of 33 -Storey Condomini um Housing Development

    (Total 208 Units) 

    e. INFINIUM @ EVELYN

  • 8/21/2019 Design 2 Proj

    11/13

    113113

    DESIGN AND MATERIALS FOR QUALITY

    Precast components

    Drywall partitions

    » Better quality surface finish.

    » Faster construction.

    » No wet work.

    » Consistent finish.

    Modular system cabinets

    Internal spray paint ing

    Epoxy grouted marble f loorRebate door w ith lift off hinges

    » Less manual work and faster installation.

    » Consistent finish.

    » Smooth and consistent finish after polishing.» Better alignment between frame and panel.

  • 8/21/2019 Design 2 Proj

    12/13

    114 • GOOD INDUSTRY PRACTICES

    CONQUAS SCORE: 93.6AVERAGE QUALITY MARK SCORE: 87.42

    Total numb er of un it s – 116 

    f. THE AZURE

  • 8/21/2019 Design 2 Proj

    13/13

    115115

    DESIGN AND MATERIALS FOR QUALITY

    Modular system components 2-component adhesive for marble f loor

    Rectif ied ceramic t iles

    Epoxy joints for marble floor

    Timber strip wit h plywood base

    Honey comb veneer door

    » Factory assembled minimize workmanship issues. » Compatible to soft stones.

    » Joint consistency.

    » Durable joints and easy maintenance.

    » Better levelness and invisible nailing.

    » Light weight and warp resistant.