    1 Introduction

    On 1 July 2012, the standard ISO/IEC 17024:2012 Conformity assessment  – General requirements for

    bodies operating certification of persons has been published. According to the decisions of the

    International Accreditat ion Forum (IAF), ISO/IEC 17024: 2012 replaces the standard ISO/IEC 17024:

    2003 "Conformity assessment – General requirements for bodies operating certification of persons" for

    accreditation of certification of persons.

    The publication of this international standard includes several changes from the ISO/IEC 17024: 2003.

    The changes are both new texts that add new requirements, changes of existing texts of ISO/IEC

    17204: 2003 into other requirements, and reformulation of requirements, as well as deleting

    requirements from ISO/IEC 17024: 2003 in the newly published standard.

    This explanatory note describes the policy and method of the RvA for the implementation of ISO/IEC17024:2012. With this document RvA implements the policy of IAF. IAF will publish an "Information

    Document for the Transition or ISO/IEC 17024".

    This explanatory document is applicable for all bodies, which are until now accredited or accepted

    under ISO/IEC 17024:2003, as well as bodies who have requested or going to request accreditation

    regarding ISO/IEC 17024, and scheme owners who requested or going to request acceptance

    regarding ISO/IEC 17024.

    Bodies which certify persons under accreditation must comply with the requirements of the new

    standard before the expiration of the transition period in order to maintain their accreditation.

    Scheme owners which have accepted schemes for certification of persons must comply with the

    requirements of the new standard before the expiration of the transition period in order to maintain

    their acceptation.

  • 8/21/2019 T036 UK V2 Copia Copia

    2/19

     

    Dutch Accreditation Council page 3 of 14T036-UK, version 2  version:25-2-2014

    Contents

    1  Introduction__________________________________________________ 4 

    Transition to ISO/IEC 17024:2012 ________________________________ 5 

    2.1  General _____________________________________________________ 5 

    2.2  RvA assessment of the transition to ISO/IEC 17024:2012_____________ 5 

    2.2.1 Time lim its an d data con cernin g the transit ion to ISO /IEC 17024:2012  ___ 5 

    2.2.2 A ccreditat ion asses sments  ______________________________________ 6 

    2.3  Nonconformities against the new requirements ____________________ 6 

    2.4  Valid guidance documents and explanatory documents _____________ 6 

    2.5  Accreditation statement ________________________________________ 7 

    2.6 

    Information __________________________________________________ 7 

    3  Changes compared to the previous version _______________________ 7 

    Annex A: Summary of changes _______________________________________ 8 

  • 8/21/2019 T036 UK V2 Copia Copia

    3/19

     

    Raad voor Accreditatie(Dutch Accreditation CouncilRvA) 

    Implementation of

    ISO/IEC 17024:2012

    Document code: RvA-T036-UK

    Version 2, 25 februari 2014

  • 8/21/2019 T036 UK V2 Copia Copia

    4/19

     

    Dutch Accreditation Council page 6 of 14T036-UK, version 2  version:25-2-2014

    based on ISO/IEC 17024:2012. 

    2.2.2 Accreditation assessments

    The accredited certification bodies are expected to perform an analysis regarding the differences

    between the ISO/IEC 17024:2003 and ISO/IEC 17024:2012 (a gap analysis) to determine to what

    extent they comply with the requirements of the new standard ISO/IEC 17024:2012 (including the use

    of internal auditing) and where necessary, to draw up and implement an action plan so they will

    comply with the ISO/IEC 17024:2012, taking into account 2.2.1 and 2.3 of this explanatory note.

    The accreditation assessment to assess the implementation of the new standard will be carried out

    during regular accreditation assessment, and will consist of:

      document reviews of the management system documentation of the body;

      review of documents of the certification scheme(s) (Note: where a scheme of an accepted schemaowner is used, the certification scheme will not be assessed at each individual certification body.);

      assessment at the office of the certification body;

      possibly a witness of an exam.

    2.3 Nonconformities against the new requirements

     All nonconformities against requirements of the ISO/IEC 17024:2012 that would not have been

    nonconformities from requirements of ISO/IEC 17024:2003 will be categorizes as "(B)". This concerns

    the requirements indicated as “new” in annex A of this explanation.  The certification body has the

    opportunity to take corrective actions until January 1, 2015 and submit a report on these to the RvA

    (see RvA-BR004). The RvA shall assess these corrective actions before 1 April 2015, and take

    accreditation decisions before 1 July 2015.

    If the RvA is not able to take a posit ive decision before 1 July 2015 concerning the granting of

    accreditation for ISO/IEC 17024:2012, due to the inability to close off the nonconformities, the

    accreditation will be suspended for a maximum of three months, The accreditation shall be withdrawn

    after this period of suspension if the nonconformities have not been resolved.

    2.4 Valid guidance documents and explanatory documents

    During the transitional period the IAF GD24: 2009 remains the guidance for ISO/IEC 17024:2003 as

    long as the accreditation is granted for ISO/IEC 17024:2003.

    In due time the RvA will adapt the current documents that apply to accreditation of certification of

    persons, such as the Specific Accreditation Protocol (SAP C014) Accreditation of certification of

    persons (general). Until then the present documents will be valid.

  • 8/21/2019 T036 UK V2 Copia Copia

    5/19

     

     An Rv A explanatory note describes the Rv A policy and/or procedure relating to a spec if ic f ield of

    accreditation. If the policy and/or procedure f or a specif ic f ield of acc reditation, as described in an Rv A

    explanatory note, is recorded in an EA, ILAC or IAF document, the Rv A shall amend its policy and procedureto align with this EA, ILAC or IAF document.

     A current v ersion of the explanatory note can be found on the Rv A website (www.rva.nl).

    http://www.rva.nl/http://www.rva.nl/http://www.rva.nl/http://www.rva.nl/

  • 8/21/2019 T036 UK V2 Copia Copia

    6/19

     

    Dutch Accreditation Council page 5 of 14T036-UK, version 2  version:25-2-2014

    2 Transition to ISO/IEC 17024:2012

    2.1 General

    IAF has decided that the transitional period for the transition of accreditation of certification of personsfrom ISO/IEC 17024:2003 to accreditat ion according to ISO/IEC 17024:2012 is three years after

    publication of the new standard. The new standard ISO/IEC 17024:2012 has been published on 1 July

    2012. This means that starting from 1 July 2015 no accreditations against the withdrawn standard

    ISO/IEC 17024:2003 may be valid any more.

    The Chairman of ISO/CASCO WG 30, the Working Group that has prepared the text of the new

    standard, has made public a presentation in which the amendments of the requirements in the new

    standard with respect to the requirements mentioned in the previous standard are expressed. This

    publication shows that the standard ISO/IEC 17024:2012 has been revised enormously. There arefundamental changes as well as many reformulations and additional requirements in the new

    standard. (see http://www.iso.org/iso/iso_17024_2012_powerpoint.ppt ). 

    The RvA has, in line with IAF policy, decided that assessments regarding the transition to the new

    standard will be carried out as much as possible with regular accreditation assessments. RvA has

    defined the transitional provisions for the implementation of the ISO/IEC 17024:2012 as follows.

    2.2 RvA assessment of the transition to ISO/IEC 17024:2012

    2.2.1 Time limits and data concerning the transition to ISO/IEC 17024:2012

    Regarding accredited certification bodies: 

    From 1 April 2013 onwards accreditation assessments at the accredited certification bodies will be

    carried out against ISO/IEC 17024:2012, with the focus on the requirements which are – according to

    the ISO publication referred to above  – new requirements with respect to the requirements of the

    withdrawn standard.

    Nonconformities raised will be subject to the provisions for corrective actions, as described in section

    2.3 of this document.

    Regarding certification bodies that have applied for accreditation or that are going to apply:

    From 1 July 2013 all applicat ions have to be made for ISO/IEC 17024:2012.

    Regarding scheme owners: 

    Scheme owners with accepted schemes for certification of persons have to adjust their accepted

    schemes in accordance with the requirements of ISO/IEC 17024:2012 (see RvA-T33). Scheme

    owners have the obligation to take into account the procedure for acceptance of schemes and the

    transitional period for accredited certification bodies.

    From 1 July 2013 all applications for the assessment of new or revised schemes will be processed

    http://www.iso.org/iso/iso_17024_2012_powerpoint.ppthttp://www.iso.org/iso/iso_17024_2012_powerpoint.ppthttp://www.iso.org/iso/iso_17024_2012_powerpoint.ppt

  • 8/21/2019 T036 UK V2 Copia Copia

    7/19

     

    Dutch Accreditation Council page 9 of 14T036-UK, version 2  version:25-2-2014

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    3.22 surveillance New

    4 Generalrequirements

    Newsection

    4.1 Legal matters 4.2.1d Changed

    4.2 Responsibilitydecision 4.2.1b Reworded

    4.3 Management

    impartiality

    New

    section

    Impartiality may be achieved trough the

    use of an Impartiality Committee orthrough other methods.Impartiality and objectivity are the

    cornerstones for certification ofpersons. If the process for verifying thecompetence of persons is not impartial

    and objective then there is no value tothe certification of persons.ISO/IEC PAS 17001 on impartiality is

    included in clause 4.3.

    4.3.1 4.2.2 Changed4.3.2 4.2.1a New ‘To be’ is replaced by ‘to act’ regarding

    management of impartiality

    4.3.3 4.1.1 New Related to management of impartiality

    4.3.4 4.3.5 Same Only a part of 4.3.5 is mentioned in4.3.4

    4.3.5 New

    4.3.6 New

    4.3.7 New

    4.3.8 New Requirement concerns “certification

    activities” instead of “certification body” 

    4.4 Finance adliability

    4.2.4a Reworded

    5 Structuralrequirements

    Samesection

    5.1 Management 4.2 Organization Changed

    section

    5.1.1 4.2.1 Changed Requirement concerns “certificationactivities” instead of “certification body” 

    5.1.2 4.2.1c Changed Additional parties to be identified added

    5.1.2a New

    5.1.2b 4.2.1c4 Same

    5.1.2c 4.2.1c5 Same

    5.1.2d New

    5.1.2e New

    5.1.2f 4.2.1c1 Same5.1.2g 4.2.1c3 Reworded

    5.1.2h New

    5.2 Structure Newsection

    New section with more informationabout the structure of the certification

    body in relation to training.Training is a threat to impartiality(5.2.3). Therefore the certification body

    of persons must demonstrate theindependence of the certificationactivities from training activities to

    ensure the confidentiality, informationsecurity and impartiality of the

    certification activities are notcompromised (5.2.3b).

  • 8/21/2019 T036 UK V2 Copia Copia

    8/19

     

    Dutch Accreditation Council page 7 of 14T036-UK, version 2  version:25-2-2014

    2.5 Accreditation statement

    The declaration of accreditation (including the scope appendix) shall be amended to show the

    accreditation against ISO/IEC 17024:2012, after an assessment against the new standard has been

    completed successfully, and a decision on the granting, continuation, or renewal of accreditation has

    been taken. For existing accreditations the registration number shall remain the same.

    The date of the accreditation statement shall be the date of the decision on accreditation against the

    new standard. The date of the first accreditation for the previously issued accreditation for certification

    of persons (against ISO/IEC 17024 2003 or EN 45013) shall also be stated on the new accreditation

    statements. The expiry date for the new accreditation shall be transferred from the existing

    accreditation.

    2.6 Information

    For questions about the new standard ISO/IEC 17024:2012, please contact Mr . Paul Schröeder

    ([email protected]). 

    For questions about the transit ional provisions please contact Mrs. Maureen van den Wijngaart

    ([email protected]). 

    3 Changes compared to the previous version

    None, this is the first version of this document in English.

    mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]

  • 8/21/2019 T036 UK V2 Copia Copia

    9/19

     

    Dutch Accreditation Council page 8 of 14T036-UK, version 2  version:25-2-2014

    Annex A: Summary of changes

     Amendments of the requirements of ISO/IEC 17024:2012 compared to ISO/IEC 17024:2003:

      the standard ISO/IEC 17024:2003 has been revised drastically . The ISO/IEC 17024:2012 has a

    different format, many new and some reworded requirements; 

      a limited number of requirements is not or not substantively changed from the version of ISO/IEC17024:2003.

    The schematic overview of the comparison of ISO/IEC 17024:2012 with ISO/IEC 17024:2003 is alsobased on the comment of the Chairman of ISO/CASCO WG 30 on the new standard.

    Explanation status:

      Same means: identical text

      Reworded   means: in other words but equivalent requirements

      Changed   means: other words; other requirements

      New  means: new words and new requirements

      New section means: in the new standard several sections have been reformatted: some textshave been are put together in other or new sections.

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    Title Title Same

    Introduction Introduction Same  Added: explanation of the terms “shall”,“should”, “may” and “can” 

    1 Scope 1 Scope Same Note added

    2 Normativereferences

    2 Normativereferences

    Changed

    3 Terms and

    definitions

    3 Terms and

    definitions

    Same

    section

    3.1 certification

    process

    3.3 certification

    process

    Reworded

    3.2 certificationscheme

    3.4 certificationscheme

    Changed

    3.3 certification

    requirements

    New

    3.4 scheme owner New

    3.5 certificate New

    3.6 competence 3.6 competence Changed

    3.7 qualification 3.11 qualification Reworded

    3.8 assessment 3.8 evaluation New The term ”evaluation” has beenreplaced by the term “assessment” withabout the same content

    3.9 examinat ion 3.9 examination Changed Added: reference to a certification

    scheme

    3.10 examiner 3.10 examiner Changed Added: reference to professional judgment

    3.11 invigilator New

    3.12 personnel New

    3.13 applicant New

    3.14 candidate 3.2 candidate Reworded

    3.15 impartiality New

    3.16 fairness New From IAF GD24

    3.17 validity New From IAF GD24

    3.18 reliability New From IAF GD24

    3.19 appeal 3.1 appeal Same

    3.20 complaint 3.7 complaint Reworded3.21 interested party New

  • 8/21/2019 T036 UK V2 Copia Copia

    10/19

     

    Dutch Accreditation Council page 12 of 14T036-UK, version 2  version:25-2-2014

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    threats associated with their certificationprograms.

    7.4.1 New

    7.4.2 New

    7.4.2a New7.4.2b New

    7.4.2c New

    7.4.2d New

    7.4.3a New

    7.4.3b New

    7.4.3c New

    7.4.3d New

    7.4.3e New

    7.4.3f New

    8 Certificationschemes

    4.3 Newsection

    More detailed description of certificationschemes. Now recognizing an external

    scheme owner. Provides clauses

    detailing the requirements for thecontents of a scheme (8.2), detailed

    clauses for certification requirementsthat must be in a scheme (8.3), anddetailed requirements for the

    development and review of thecertification scheme (8.4). Therequirement for a Job Task Analysis is

    now included in the standard (8.4).Surveillance is now “if applicable” asbased on the scheme. Requires that the

    scheme be reviewed and validated onan ongoing, systematic basis.

    Development of the scheme was citedas one of the problematic areas. Thenew standard provides additionalinformation to clarify scheme

    requirements.

    8.1 New

    8.2a New

    8.2b New

    8.2c New

    8.2d New

    8.2e New

    8.2f New

    8.3a New8.3b New

    8.3c New

    8.3d New

    8.3e New

    8.4a New

    8.4b [4.2.3] New Is considered to be a new requirement.

    8.4c New

    8.4d New

    8.4e New

    8.5 New

    8.6 New

    9 Certification

    process

    6 Certification

    process

    Changed

    section

    More detail provided for the certification

    process requirements, including theapplication process (9.1), assessment

  • 8/21/2019 T036 UK V2 Copia Copia

    11/19

     

    Dutch Accreditation Council page 11 of 14T036-UK, version 2  version:25-2-2014

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    6.3.2c 4.5.2c Changed

    6.3.2d New

    6.3.2e 4.5.2c Changed

    6.4 Other resources New

    7 Records andinformation Changedsection  A certification body for persons mustcarefully balance information thatshould be available to the public with

    and without request, and information tatmust be kept confidential.

    7.1 Records persons Samesection

     Applicant, candidate and certifiedpersons records section describes what

    persons records must be stored.

    7.1.1 4.6.1 Same

    7.1.2 4.6.2 Same

    7.1.3 4.7 New

    7.2 Publicinformation

    Newsection

    Public information section describesinformation that must be available both

    with request and without request.ISO/IEC PAS 17004 on disclosure ofinformation included in clause 7.2.

    7.2.1 New

    7.2.2 New

    7.2.3 New

    7.2.4 New

    7.3 Confidentiality Newsection

    Confidentiality section provides clausesrelating to confidential data including

    candidate data and examination data.ISO/IEC PAS 17002 on confidentialityincluded in clause 7.3.

    7.3.1 New

    7.3.2 [4.7] New Is considered to be a new requirement.7.3.3 [4.7] New Is considered to be a new requirement.

    7.3.4 [4.7] New Is considered to be a new requirement.

    7.3.5 [4.7] New Is considered to be a new requirement.

    7.4 Security New

    section

    Includes clauses pertaining to the

    security of confidential candidate data(personal information, etc.), andclauses pertaining to the security of

    examination data (test questions,answers, exam papers, etc.).Requires the certification body to

    develop security policies and

    procedures that includes considerationof the location of the materials

    (transport, storage, exam centers,destruction, digital etc.), the nature ofthe materials (electronic, paper, test

    equipment, etc.), and the steps in thelife cycle of examinations (development,administration, results reporting, etc.).

    The release of some confidentialinformation (such as examinationinformation) could result in the

    invalidation of the entire certificationprogram. It is important that all

    confidential and secure information iskept confidential. Many certificationbodies are unaware of the security

  • 8/21/2019 T036 UK V2 Copia Copia

    12/19

     

    Dutch Accreditation Council page 10 of 14T036-UK, version 2  version:25-2-2014

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    5.2.1 4.3.5 Same Only a part of 4.3.5 is mentioned in5.2.1

    5.2.2 New

    5.2.3 New

    5.2.3a New5.2.3b [4.2.5] New Is considered to be a new requirement

    5.2.3c New

    5.2.3d New

    5.2.3e New A trainer may not serve as an examinerof a specific candidate they have

    trained for a period of 2 years (5.3.2e)unless the certification body candemonstrate how it does not

    compromise impartiality.

    6 Resourcerequirements

    Changedsection

    Note that Personnel definition (3.12)includes individuals internal or externalwho carry out activities for the

    certification body.The competence of personnel isimportant to ensure that certification

    activities are carried out correctly andimpartially.

    6.1 Generalrequirements

    5.1 General Changedsection

    Clauses pertaining to competence,training and signing of conflict of

    interest and confidentiality agreementsadded.

    6.1.1 New

    6.1.2 [4.2.7] New Is considered to be a new requirement.

    6.1.3 5.1.1 Changed

    6.1.4 5.1.3 Reworded

    6.1.5 5.1.4 Reworded6.1.6 New

    6.1.7 5.1.2 Reworded

    6.1.8 New

    6.2 Personnel Newsection

    6.2.1 General 5.2.1 New Is considered to be a new requirement.

    6.2.2 Examiners Same

    section

    Clauses pertaining to competence,

    impartiality, and declaration of conflictof interest added.

    6.2.2.1 5.2.1 Same

    6.2.2.1a 5.2.1 Reworded

    6.2.2.1b 5.2.1 Reworded6.2.2.1c 5.2.1 Same

    6.2.2.1d 5.2.1 Changed

    6.2.2.1e 5.2.1 Reworded

    6.2.2.2 New

    6.2.2.3 5.2.2 Same

    6.2.3 Otherpersonnel

    Newsection

     Added requirements for invigilators andexamination administrators.

    6.2.3.1 New

    6.2.3.2 New

    6.3 Outsourcing Changed

    section

    Includes contracted and subcontracted

    services.

    6.3.1 4.5.1 Changed

    6.3.2a 4.5.2a Changed6.3.2b 4.5.2b Changed

  • 8/21/2019 T036 UK V2 Copia Copia

    13/19

     

    Dutch Accreditation Council page 13 of 14T036-UK, version 2  version:25-2-2014

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    process (9.2), examination process(9.3), decision on certification (9.4),suspending, withdrawing or reducing

    the scope of certification (9.5),recertification process (9.6) and the useof certificates, logos and marks (9.7).

     Additional detail was required to makethe clauses and requirements clear.

    9.1 Applicationprocess

    6.1 Application Samesection

    9.1.1 6.1.1 Changed

    9.1.2 6.1.2 Changed

    9.1.2a 6.1.2 Changed

    9.1.2b 6.1.2 Same

    9.1.2c 6.1.2 Same

    9.1.2d 6.1.2 Changed

    9.1.2e New

    9.1.3 [6.2.1] New Is considered to be a new requirement.9.2 Assessment

    process

    Changed

    section

    9.2.1 New

    9.2.2 4.3.3 Changed

    9.2.3 6.2.3 Reworded

    9.2.4 New

    9.2.5 6.2.1 New

    9.2.6 New

    9.3 Examinationprocess

    Newsection

    9.3.1 6.2.2 Changed Added text to address equating of examforms and comparability of the pass/fail

    decision

    9.3.2 New To address exam administrationstandardization

    9.3.3 New To address exam administrationstandardization

    9.3.4 New

    9.3.5 4.3.6 Changed

    9.4 Decision on

    certification

    6.3 Decision on

    certification

    Same

    section

    9.4.1 New

    9.4.1a New

    9.4.1b New

    9.4.2 4.5.1 Changed9.4.3 4.1.3 Reworded

    9.4.4 6.3.1 Same

    9.4.5 New

    9.4.6 New

    9.4.7 6.3.2 Same

    9.4.8a 6.3.3 Same

    9.4.8b 6.3.3 Same

    9.4.8c 6.3.3 Same

    9.4.8d 6.3.3 Changed

    9.4.8e 6.3.3 Same

    9.4.8f 6.3.3 Same

    9.4.9 New

    9.5 Suspension,withdrawing

    Newsection

  • 8/21/2019 T036 UK V2 Copia Copia

    14/19

     

    Dutch Accreditation Council page 14 of 14T036-UK, version 2  version:25-2-2014

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    9.5.1 New

    9.5.2 New

    9.5.3 New

    9.5.4 New

    9.6 Recertificationprocess 6.5 Recertificat ion Changedsection

    9.6.1 6.5.2 Changed

    9.6.2 6.5.1 & 6.5.2 Changed

    9.6.3 New

    9.6.3a New

    9.6.3b New

    9.6.3c New

    9.6.3d New

    9.6.3e New

    9.6.3f New

    9.6.3g New

    9.6.3h New

    9.6.4 6.5.2 Reworded9.6.5a New

    9.6.5b New

    9.6.5c New

    9.6.5d New

    9.6.5e New

    9.6.5f New

    9.7 Use ofcertificates, marks

    Use of certificates,marks

    Samesection

    9.7.1 6.6.1 Same

    9.7.2 6.6.2 Same

    9.7.2a 6.6.3 Same

    9.7.2b 6.6.2 Same9.7.2c 6.6.2 Same

    9.7.2d 6.6.2 Same

    9.7.2e 6.6.2 Same

    9.7.3 6.6.3 Changed

    9.8 Appeals [4.2.6] New

    section

    New appeals section.

    ISO/IEC PAS 17003 on appealsincluded in clause 9.8.

    9.8.1 [4.2.6]] New Is considered to be a new requirement.

    9.8.1a New

    9.8.1b New

    9.8.1c New

    9.8.2 [4.2.6] New Is considered to be a new requirement.

    9.8.3 New

    9.8.4 [4.2.6] New Is considered to be a new requirement.

    9.8.5 New

    9.8.6 New

    9.8.7 New

    9.9 Complaints [4.2.6] Newsection

    New complaints section.ISO/IEC PAS 17003 on complaints

    included in clause 9.9.

    9.9.1 [4.2.6] New Is considered to be a new requirement.

    9.9.2 New

    9.9.3 [4.2.6] New Is considered to be a new requirement.

    9.9.3a New

    9.9.3b New9.9.3c New

  • 8/21/2019 T036 UK V2 Copia Copia

    15/19

     

    Dutch Accreditation Council page 15 of 14T036-UK, version 2  version:25-2-2014

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    9.9.4 New

    9.9.5 New

    9.9.6 New

    9.9.7 New

    9.9.8 New9.9.9 New

    9.9.10 New

    10 Managementsystem

    Newsection

    New management system requirementssection.ISO/IEC PAS 17005 on use of

    management systems included inclause 10.

    10.1 General [4.4.1] New Is considered to be a new requirement.

    10.2 Generalrequirements

    Newsection

    10.2.1 General [4.4.2] New Is considered to be a new requirement.

    10.2.2

    Documentation

    New

    10.2.3 Control ofdocuments

    [4.4.3] New Is considered to be a new requirement.

    10.2.3a New

    10.2.3b New

    10.2.3b New

    10.2.3c New

    10.2.3d New

    10.2.3e New

    10.2.3f New

    10.2.3g New

    10.2.4 Control ofrecords

    New

    10.2.5 Management

    review

    New

    10.2.5.1 General [4.4.3] New Is considered to be a new requirement.

    10.2.5.2 Reviewinput

    New

    10.2.5.2a New

    10.2.5.2b New

    10.2.5.2c New

    10.2.5.2d New

    10.2.5.2e New

    10.2.5.2f New

    10.2.5.2g New

    10.2.5.2h New10.2.5.3 Reviewoutput

    New

    10.2.5.3a New

    10.2.5.3b New

    10.2.5.3c New

    10.2.6 Internal audits New

    section

    10.2.6.1 [4.4.3] New Is considered to be a new requirement.

    10.2.6.2 New

    10.2.6.3 New

    10.2.6.4a New

    10.2.6.4b New10.2.6.4c New

    10.2.6.4d New

  • 8/21/2019 T036 UK V2 Copia Copia

    16/19

     

    Dutch Accreditation Council page 16 of 14T036-UK, version 2  version:25-2-2014

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    10.2.6.4e New

    10.2.7 Correctiveactions

    [4.4.3] New Is considered to be a new requirement.

    10.2.7a New

    10.2.7b New10.2.7c New

    10.2.7d New

    10.2.7e New

    10.2.7f New

    10.2.7g New

    10.2.8 Preventiveactions

    [4.4.3] New Is considered to be a new requirement.

    10.2.8a New

    10.2.8b New

    10.2.8c New

    10.2.8d New

    10.2.8e New

     Annex A(informative)

    New Principles section added in Annex A.Includes principles associated withimpartiality, competence, confidentialityand openness, responsiveness to

    complaints and appeals, andresponsibility.The revised standard cannot give

    specific requirements for all situationsthat can occur. The principles aredesigned to be able as guidance for

    unanticipated situations. The principlesserve as the framework for the entirestandard.

    Bibliography Changed

  • 8/21/2019 T036 UK V2 Copia Copia

    17/19

     

    Dutch Accreditation Council page 17 of 14T036-UK, version 2  version:25-2-2014

    The following sect ions from ISO/IEC 17024:2003 are not inherited in ISO/IEC 17024:2012:

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status Comment

    4.1.1 - Deleted

    4.1.2 - Deleted

    4.2.1a - Deleted

    4.2.3 - Deleted

    4.3.1 - Deleted

    4.3.4 - Deleted

    6.2.1 - Deleted

    6.2.4 - Deleted

    6.4.1 - Deleted

    6.4.2 - Deleted

    6.5.1 - Deleted

  • 8/21/2019 T036 UK V2 Copia Copia

    18/19

     

    Dutch Accreditation Council page 18 of 14T036-UK, version 2  version:25-2-2014

    Of the mandatory requirements (the 'shall' requirements) in IAF GD24:2009 some are included inISO/IEC 17024:2012. The overview is as follows:

    IAF GD24:2009 ISO/IEC 17024:2003 Status Comment

    G.4.2.1 - Not included in ISO/IEC 17024:2012.

    G.4.2.3 - Not included explicitly in ISO/IEC17024:2012. However, see ISO/IEC17024:2012, section 4.1 (status) and

    section 5.1 (structure).

    G.4.2.8 4.3.7 Changed See ISO/IEC 17024:2012, section 4.3.7;see also 4.3.6.

    G.4.2.9 - Not included in ISO/IEC 17024:2012.

    G.4.2.11 - Not included in ISO/IEC 17024:2012.

    G.4.2.13 9.8.4 Changed

    G.4.2.17 - Not included in ISO/IEC 17024:2012.

    G.4.2.20 6.2.1 Reworded

    G.4.2.22 6.1.16.4

    RewordedReworded

    G.4.2.26 5.2.2 RewordedG.4.2.28 - Not included in ISO/IEC 17024:2012.

    G.4.2.30 9.9.3c Changed

    G.4.3.2 8.4e Reworded

    G.4.7.1 - Not included explicitly in ISO/IEC

    17024:2012. Hoewever, see: ISO/IEC17024:2012, sections 6.3.2.b and 6.1.7

    G.4.7.2 - Not included in ISO/IEC 17024:2012.

    G.5.1.1 - Not included in ISO/IEC 17024:2012.

    G.5.1.2 - Not included in ISO/IEC 17024:2012. G.5.2.3 - Not included in ISO/IEC 17024:2012. G.6.2.1 - Not included explicitly in ISO/IEC

    17024:2012. However, see: ISO/IEC

    17024:2012, section 9.2.5.

    G.6.3.3 9.4.5 Changed

    G.6.3.4 9.4.6 Reworded

    G.6.3.5 - Not included in ISO/IEC 17024:2012.

    G.6.3.6 - Not included in ISO/IEC 17024:2012. G.6.3.7 - Not included in ISO/IEC 17024:2012. G.6.5.3 - Not included in ISO/IEC 17024:2012.

    G.6.6.3 - Not included in ISO/IEC 17024:2012.

    G.6.6.5 - Not included in ISO/IEC 17024:2012.

  • 8/21/2019 T036 UK V2 Copia Copia

    19/19

     

    Dutch Accreditation Council page 19 of 14

     A brief overview of the requirements, which are not substantively changed, is :

    ISO/IEC 17024:2012 ISO/IEC 17024:2003 Status

    4.2 4.2.1b Reworded

    4.3.4 4.3.5 Same4.4 4.2.4a Reworded

    5.1.1 4.2.1 Reworded

    5.1.2b 4.2.1c4 Same

    5.1.2c 4.2.1c5 Same

    5.1.2f 4.2.1c1 Same

    5.1.2g 4.2.1c3 Reworded

    5.2.1 4.3.5 Same

    6.1.4 5.1.3 Reworded

    6.1.5 5.1.4 Reworded6.1.7 5.1.2 Reworded

    6.2.2.1 5.2.1 Same

    6.2.2.1a 5.2.1 Reworded

    6.2.2.1b 5.2.1 Reworded

    6.2.2.1c 5.2.1 Same

    6.2.2.1e 5.2.1 Reworded

    6.2.2.3 5.2.2 Same

    7.1.1 4.6.1 Same

    7.1.2 4.6.2 Same9.1.2b 6.1.2 Same

    9.1.2c 6.1.2 Same

    9.2.3 6.2.3 Reworded

    9.4.3 4.1.3 Reworded

    9.4.4 6.3.1 Same

    9.4.7 6.3.2 Same

    9.4.8a 6.3.3 Same

    9.4.8b 6.3.3 Same

    9.4.8c 6.3.3 Same9.4.8e 6.3.3 Same

    9.4.8f 6.3.3 Same

    9.7.1 6.6.1 Same

    9.7.2 6.6.2 Same

    9.7.2a 6.6.3 Same

    9.7.2b 6.6.2 Same

    9.7.2c 6.6.2 Same

    9.7.2d 6.6.2 Same

    9.7.2e 6.6.2 Same