    PP+G.1 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    STUDIOARCHITECTUREAN ALTERNATIVE SCHOOL OF ARCHITECTURE

    COMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVEEVALUATION COURSE

    PROFESSIONAL PRACTICE + GOVERNANCEFULL NAME SCHOOL

    INSTRUCTION:

    This examination will test your comprehension onArchitectural Professional Practice. Write your answers in the spaceprovided for the Identification and Explanation types, and shade the letter of your answer in the answer sheet for theMultiple Choice type.

    PART 1 PROFESSIONAL REGULATORY LAWS SCORE

    PART 2 ARCHITECTURAL SERVICES

    PART 1: PROFESSIONAL REGULATORY LAWS

    1. Statutory Laws are:a. Canon Laws b. Civil laws c. Common Laws d. Legislative Laws

    2. Non-statutory Laws are:a. Canon Laws b. Civil laws c. Common Lawsd. Legislative Laws

    3. The common law giving the state an absolute right to acquire private properties for government development projects.a. Administrative Code b. Law on Absolute Acquisitionc. Law on Eminent Domain d. Law on Variance

    4. An administrative exception to land use regulations in order to compensate for a deficiency in a real property.a. Administrative Code b. Law on Absolute Acquisition

    c. Law on Eminent Domain d. Law on Variance

    5. The Philippine Environmental Code.a. PD 442b. PD 1152 c. RA 6639 d. RA 10000

    6. The Condominium Law of 1966.a. BP 220 b. PD 957 c. RA 386 d. RA 4726

    7. The Philippine Arbitration Law.a. EO 546 b. PD 1067 c. RA 876 d. RA 7160

    8. Intellectual Property Code of the Philippinesa. RA 3019 b. RA 7160 c. RA 8293 d. RA 8974

    9. Law on Acquisition of Right-of-Way, Site or Location for National Government Infrastructure Project.a. RA 3019 b. RA 8293 c. RA 8797 d. RA 8974

    10. Civil liability of the architect for the structures he or she designs, under article 1723 of the Civil Code of the Philippines.a. 10 years b. 15 years c. 20 years d. 25 years

    the brown bauhaus

  • 7/28/2019 Prof Prac Cec

    2/12

    PP+G.2 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    PD 1096: NATIONAL BUILDING CODE OF THE PHILIPPINES

    11. How many years of diversified and professional experience in building design and construction is the qualificationrequirement for a Building Official?a. 3 years b. 5 years c. 7 years d. 10 years

    12. What is the minimum least dimension for kitchen?a. 1.20 m b. 1.40 m c. 1.50 m d. 1.80 m

    13. What is the minimum floor-ceiling height of a habitable room, in a 1-strorey building, provided with artificial ventilation?a. 2.10 m b. 2.40 m c. 2.70 m d. 2.90 m

    14. What is the minimum floor-ceiling height of the 1st floor of a building more than 1 floor of a building, provided withartificial ventilation?

    a. 2.10 mb. 2.40 m c. 2.70 m d. 2.90 m

    15. What is the minimum floor-ceiling height of the 2nd floor of a building more than 1 floor, provided with artificialventilation?a. 2.10 m b. 2.40 m c. 2.70 m d. 2.90 m

    16. What is the minimum floor-ceiling height of the floors after the 2nd in a building more than 2 floors, provided with artificialventilation?a. 2.10 m b. 2.40 m c. 2.70 m d. 2.90 m

    17. What is the minimum floor-ceiling height of the habitable rooms in a building utilizing natural ventilation?a. 2.10 m b. 2.40 m c. 2.70 m d. 2.90 m

    18. What us the minimum headroom clearance for a mezzanine?a. 1.60 m b. 1.70 m c. 1.80 m d. 1.90 m

    19. What is the minimum allowed projection of footing beyond the property line along a public highway?a. 300 mm b. 400 mm c. 500 mm d. 600 mm

    20. What is the required minimum depth of the footing in the above item in order for projection beyond the property line isallowed?a. 1,500 mm b. 2,000 mm c. 2,400 mm d. 2,800 mm

    21. What is the minimum horizontal clear distance between the curb and the outermost edge of a marquee?a. 150 mm b. 200 mm c. 250 mm d. 300 mm

    22. What is the height required for railings for temporary walkways to give protection to pedestrian during construction?a. 800 mm b. 1,000 mm c. 1,200 mm d. 1,400 mm

    23. What us the required width of a temporary walkway for pedestrian during construction?a. 800 mm b. 1,000 mm c. 1,200 mm d. 1,400 mm

    24. What is the minimum possible number of entrance/exit door for any building?a. 1 b. 2 c. 3 d. 4

    25. How many exits are required for an enclosed stand with occupant load more than 1000?a. 2 b. 3 c. 4 d. 5

    26. What is the minimum least dimension for toilets?a. 700mm b. 800 mm c. 900 mm d. 1000 mm

    27. What is the minimum floor-ceiling height of a habitable room, in a 1-storey building, without artificial ventilation?a. 2.10 m b. 2.40 m c. 2.70 m d. 2.90 m

  • 7/28/2019 Prof Prac Cec

    3/12

    PP+G.3 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    28.Abutments shall be allowed on only one (1) side for any R-2 lot type/location.a. True b. FalseNO FIREWALLS/ABUTMENTS ON THE FORNT AND REAR

    29. How much open space is required of a corner-through lot for a proposed restaurant?a. 5% b. 10% c. 15% d. 20%APPLICABLE FOR ALL OCCUPANCIES

    30. How much open space is required of an end lot for a proposed museum building?a. 20-50% b. 30-50% c. 40-50% d. 50-60%FOR A, B, C, D, E-2, H ( INSTITUTIONAL) OCCUPANCY

    31. What is the minimum ceiling height of habitable rooms of the second storey of a building?a. 2.10 m b. 2.40 m c. 2.70 m d. 2.90 mSECTION 805

    32. What is the least dimension of the minimum size of kitchens?a. 1.00 m b. 1.20 m c. 1.50 m d. 1.70 mMINIMUM AREA : 3 SQM

    33. What is the least dimension of the minimum size of toilet and bath?a. 700 mm b. 800 mm c. 900mm d. 1000 mmMINIMMUM AREA : 1.20 SQM

    34. What is the least dimension of the minimum size of room for human habitations?a. 2.00 m b. 2.50 m c. 3.00 m d. 3.50 mMINIMUM AREA : 6 SQM

    35. Window openings must serve as emergency egress in cases of extreme emergencies. What is the minimum width of theclear opening of such windows?a. 760 mm b. 820 mm c. 870 mm d. 900 mmHEIGHT : 1 M

    36. What is the minimum width of easement for it to be allowed with a driveway/carriageway?a. 6.00 m b. 7.00 m c. 8.00 m d. 9.00m

    37. What is the required minimum width of easement at urban areas per side of waterway?a. 2.00 m b. 3.00 m c. 4.00 m d. 5.00 m

    38. What is the required minimum width of easement at agricultural areas per side of waterway?a. 20.00 m b. 30.00 m c. 40.00 m d. 50.00 mFOREST AREAS : 40 M

    39. What is the minimum width of roadway/carriageway of multiple dwelling units of up to six (6) units?a. 3.00 m b. 3.50 m c. 4.00 m d. 4.50 m

    40. What is the minimum width of sidewalk on each side of multiple dwelling units of up to six (6) units?a. 500 mm b. 600 mm c. 750 mm d. 800 mm

    41. What is the minimum total width of Road Right-of-Way of multiple dwelling units of more than 35 units?a. 7.80 m b. 8.70 m c. 9.60 m d. 10.00 mROADWAY: 6.70 M SW: 1.00 M

    42.A minimum total width of Road Right-of-Way of 7.00 m is required for how many units of multiple dwelling units?a. 7-15 units b. 16-25 units c. 26-35 units d. 31-40 unis

    43. What is the minimum width of access road for turn coats and cul-de-sacs?a. 3.00 m b. 4.00 m c. 5.00 m d. 6.00 m

    44. What is the Range of Required Sidewalk and Planting Strip Widths (total of both sides of RROW) for a RROW 30.00 m andabove?

    a. From 1/4 up to 1/3 of RROW width b. From 1/6 up to 1/4 of RROW widthc. From 1/6 up to 1/3 of RROW width d. From 1/8 up to RROW width

    45. What is the total minimum planting strip width (within and per sides of RROW) for a 25.00-29.00-meter wide RROW?a. 400 mm b. 500 mm c. 600 mm d. 700 mm

  • 7/28/2019 Prof Prac Cec

    4/12

    PP+G.4 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    46. What is the total minimum planting strip width (within and per sides of RROW) for a 10.00-19.00-meter wide RROW?a.400 mm b. 500 mm c. 600 mm d. 700 mm

    47.A planting strip is optional for a RROW with a width below:a. 6.00 m b. 7.00 m c. 8.00 m d.10.00 m

    48. What is the minimum clear distance of the central light well and ventilation shaft for basements?a. 2.00 m b. 2.50 m c. 3.00 m d. 3.50 m

    49. What is the minimum clear distance of the secondary/support angular light well and ventilation shaft for basements?a. 1.20 m b. 1.50 m c. 1.80 m d. 2.00 m

    50. What is the required angle of the angular shaft for basements?a. 40 b. 50 c. 60 d. 70%

    51. What is the allowed maximum encroachment of foundations into sidewalk areas?a. 300 mm b. 400 mm c. 500 mm d. 600 mmTHE FOUNDATION IS NOT LESS THAN 600 MM BELOW THE ESTABLISHED GRADE

    52. What is the maximum total projection of balconies and appendages to a 4.50 m street?a. 500 mm b. 600 mm c. 700 mm d. 900 mm

    53. What is the maximum total projection of balconies and appendages to a 12.00 m street?a. 1,000 mm b. 1,100 mm c. 1,200 mm d. 1,300TABLE X.1

    54. What is the minimum clear height of arcaded pedestrian walkways?a. 3.00 m b. 4.00 m c. 5.00 m d. 6.00 m

    55. What is the minimum length of a chaflan of a building?a. 3.00 m b. 4.00 m c. 5.00 m d. 6.00 m

    56.A 20-seater beer garden pub isrequired to have how many exit(s)?a. 1 b. 2 c. 3 d. 4

    57. Which of the following statements is not among the six (6) Grave Violations stipulated in the law?a. Change in the existing use or occupancy without Certificate of Change of Occupancy/Use/Occupation.b. Excavations left open without any work being done in the site for more than one hundred (120) days.c. Non-compliance with order to abate or demolish.

    d. Non-compliance with work stoppage order for construction/demolition without permit.

    58. What is the minimum height requirement of pedestrian railings during construction or demolition in the site?a. 700 mm b. 800 mm c. 900 mm d. 1000 mm

    59. What are the three (3) Light Violations stipulated in the law?

    60. What are the two (2) Less Grave Violations stipulated in the law?

    61. What are the required minimum setbacks for commercial, industrial, institutional and recreational buildings with RoadRight-of-Way (RROW) width of 25-29 meters?6 : 3 : 3

    62. What are the required minimum setbacks for commercial, industrial, institutional and recreational buildings with RoadRight-of-Way (RROW) width of 10-19 meters?5 : 2 : 2

    63. Can a footing located at least 2.40 m below grade along national roads be allowed to project beyond the property line?State two (2) conditions.IT MAY PROJECT BUT NOT MORE THAN 300 MM AND IT WILL NOT OBSTRUCT ANY EXISTINGUTILITIES/SERVICES

    64. What types of structures are exempted from payment of building permit fees? PUBLIC BUILDINGS & INDIGENOUSFAMILY DWELLINGS & INDIGENOUS FAMILY DWELLINGS (THE TOTAL COST SHOULD NOT EXCEED Php 15,000.00)

  • 7/28/2019 Prof Prac Cec

    5/12

    PP+G.5 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    65. What is the requirement for signs written in any foreign language? SHALL HAVE A CORRESPONDING TRANSLATION INENGLISH OR IN THE LOCAL DIALECT

    Choose A if allowed and B if not allowed the Lot Location/Type of each Building Use/Occupancy.

    66. Interior lot for R-1 A 67. End lot for R-2 (medium density housing, BHL of 10m) A

    68. Interior lot for Maximum R-2 (BHL of 15 m) B 69. End lot for Maximum R-3 (high density housing, BHLof 36 m) A

    70. Interior lot for R-4 (individual townhouse) B 71. Interior lot for C-1 B

    72. Corner-Through lot for C-1 A 73. Interior lot for C-2 B

    74. End lot for C-2 B 75. Corner-Through lot for C-3 A

    BP 344: LAW TO ENHANCE MOBILITY OF DISABLED PERSONS

    76. Ramps must have a slope of not a greater than:a. 1:6 b. 1:10c. 1:12 d. 1:15

    77. Ramps must have a intermediate landing of length not less than:a. 1.00 m b. 1.50 m c. 2.00 m d. 2.50 m

    78. Ramps must have an intermediate landing at very how many meters in length?a. 2.00 m b. 3.00 m c. 5.00 m d. 6.00 m

    79. What is the topmost landing of a ramp must have a length no less than?a. 1.50 m b. 1.80 m c. 2.00 m d. 2.20 m

    80. Entrance vestibule must have a width not less than:a. 1.50 m b. 1.80 m c. 2.00 m d. 2.20 m

    81. What is the minimum clear width of ramps?a. 1.00 m b. 1.20 m c. 1.50 m d. 1.70 m

    82.A length or busy walkways should be provided with points where wheelchair may pass another or maneuver at every:a. 8.00 m b. 10.00 m c. 12.00 m d. 14.00 m

    83. To guide the blind, walkways should follow a straight routes with:a. Long sweep turns b. Right angle turns c. Truncated turns d. None of the following

    84. Walkway headroom should not be less than:a. 2.00 m b. 2.10 m c. 2.40 m d. 3.00 m

    85. Handrails should be installed at walkways at no less than:a. 700 mm b. 800 mm c. 900 mm d. 1000 mm

    86. Handrails should be installed at no less than how many millimeters above ramps or steps?a. 700 mm b. 800 mm c. 900 mm d. 1000 mm

    87. Handrails should have how many millimeter protective extensions at the beginning and end of ramps or stairs?a. 100 mm b. 200 mm c. 300 mm d. 400 mm

    88.All doors shall have a minimum clear width of:a. 800 mm b. 900 mm c. 1000 mm d. 1200 mm

    89. Corridors shall have a minimum clear width of:a. 1.00 m b. 1.20 m c. 1.50 m d. 1.80 m

  • 7/28/2019 Prof Prac Cec

    6/12

    PP+G.6 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    90.A circle of 1.20 m in diameter is a suitable guide in the planning of wheelchair turning spaces.a. True b. False1.50 M

    91. How many wheelchair seating spaces are required for a 70-seater assembly place? RULE 3, 7.1.1 (B)a. 2 b. 4 c. 6 d. 8

    92. How many wheelchair seating spaces are required for a 470-seater assembly place?a. 2 b. 4 c. 6 d. 8

    93. What is the maximum lowest point of a dropped curb from the road or gutter?a. 25 mm b. 30 mm c. 50 mm d. 75 mm

    94. What is the minimum width of curb cut-out?a. 600 mm b. 700 mm c. 800 mm d. 900 mm

    95. What is the minimum headroom of signages protruding into a walkway or route?a. 1.80 m b. 2.00 m c. 2.20 m d. 2.40 m

    RA 9514: FIRE CODE OF THE PHILIPPINES

    96.A fire involving ordinary combustible materials such as wood, cloth, paper, rubber, and plastic.a. Class A fire b. Class B fire c. Class C fire d. Class D fire

    97.A fire involving flammable liquids and gasses.a. Class A fire b. Class B fire c. Class C fire d. Class D fire

    98.A fire involving energized electrical equipment.a. Class A fire b. Class B fire c. Class C fire d. Class D fire

    99.A fire involving combustible metal such as magnesium, sodium, and potassium.a. Class A fire b. Class B fire c. Class C fire d. Class D fire

    100.Who is the official duly designated to head the local fire service where policemen are also performing fire servicefunction?a. Fire Chief b. Fire Director c. Fire General d. Fire Marshal

    101.What is the maximum travel distance from any point of a building to the nearest exit if the building is provided withAFSS?a. 41 m b. 46 m c. 61 m d. 70 m

    102.What is the maximum number of seats allowed in a row if bounded by aisles?a. 7 b. 14 c. 21 d. 29

    103.What is the maximum number of seats allowed in a row if bounded by aisles at one end and a wall at the other end?a. 7 b. 14 c. 21 d. 29

    104.In an assembly place serving more than 60 seats, the minimum width of an aisle if it serves seats at both sides.a. 910 mm b. 1,000 mm c. 1,200 mm d. 1,400 mm

    105.What is the required size of hose connections for full-scale firefighting of Class I standpipe system?a. 32 mm b. 38 mm c. 64 mm d. 75 mm

    106.What is the required size of hose connections for first-aid firefighting of Class II standpipe system?a. 32 mm b. 38 mm c. 64 mm d. 75 mm

    107.No point within a building, requiring dry standpipes, shall be more than how many meters of travel distance from a drystandpipe outlet connection?a. 30 m b. 40 m c. 50 m d. 60 m

  • 7/28/2019 Prof Prac Cec

    7/12

    PP+G.7 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    108.Dry standpipes can be concealed in building walls or built into pilasters.a. True b. False

    109.Fittings and connections of dry standpipes are required to withstand how much water pressure during service?a. 100 psi b. 200 psi c. 250 psi d. 300 psi

    110.What is the required slope of the horizontal runs of dry standpipes?a. 5% b. 10% c. 15% d. 20%

    111.What is the required minimum area per floor of hazardous storage and business and mercantile occupancies to have wetstandpipe system?a. 1,860 sqm b. 2,350 sqm c. 2,760 sqm d. 3,140 sqm

    112.What is the minimum diameter of wet standpipes?a. 32 mm b. 38 mm c. 64 mm d. 75 mm

    113.What is the minimum diameter of hose of every wet standpipe outlet?a. 32 mm b. 38 mm c. 64 mm d. 75 mm

    114.Where the occupant load served does not exceed three, spiral stairs shall be permitted, provided that the followingcriteria are met that the clear width of the stairs shall be not less than:a. 585 mm b. 660 mm c. 700 mm d. 745 mm

    115.Referring to the item above, what is the maximum height of risers?a. 180 mm b. 210 mm c. 240 mm d. 2.70 m

    116.What is the minimum size of handrails on stairs?a. 67 cm b. 70 cm c. 76 cm d. 80 cm

    117.Metal latches should be provided to lock swinging stairs section in up position shall be installed.a. True b. False

    118.What is the minimum size of ladder rungs as fire escape?a. 22 mm b. 25 mm c. 27 mm d. 29 mm

    119.The lowest rung of any ladder shall be not more than how many millimeters above the level of the ground or balconyfloor beneath it?

    a. 305 mm b. 405 mm c. 505 mm d. 605 mm

    120.Emergency lighting facilities shall be arranged to maintain the specified degree of illumination in the event of failure ofthe normal lighting for a period of at least how many hours?a. 1 hr b. 1.5 hrs c. 2 hrs d. 2.5 hrs

    121.What is the minimum dimension of emergency evacuation plan posted on every strategic locations of a building?a. 8.5 X 11b. 8.5 X 13 c. 8.5 X 15 d. 8.5X`6

    122.What is the minimum size of combination standpipe system?a. 100 mm b. 150 mm c. 200 mm d. 250 mm

    123.For a moderate type A hazard, what is the maximum travel distance to a fire extinguisher?a. 10 m b. 12 m c. 15 m d. 18 m

    124.What is the maximum travel distance to an exit from any point in a building without an approved, supervised automaticsprinkler system?a. 46 m b. 53 m c. 61 m d. 66 m

  • 7/28/2019 Prof Prac Cec

    8/12

    PP+G.8 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    Give six (6) building types that are mandatory to have automatic fire department notification.

    125.ALL HIGH RISE BUILDINGS 126.SHOPPING MALLS 127.SCHOOLS

    128.HOTELS 129.HOSPITAL 130.HAZARDOUS OCCUPANCIES

    PART 2: ARCHITECTURAL SERVICES

    131.The minimum Basic Fee of Architects for the design of simple structures.a. 6% b. 8% c. 10% d. 12%

    132.The minimum Basic Fee of Architects for the design of complex structures.a. 6% b. 7% c. 8% d. 10%

    133.The Minimum Basic Fee of Architects for the design of residential structures.a. 8% b. 10% c. 12% d. 15%

    134.The Minimum Basic Fee of Architects for the design of monumental structures.a. 8% b. 10% c. 12% d. 15%

    135.The Minimum Basic Fee of Architects for the design of structures of moderate complexity.a. 7% b. 10% c. 12% d. 15%

    136.The minimum Basic Fee of Architects for people involving intricate designs.

    a. 10% b. 12% c. 15% d. 17%

    137.The Minimum Basic Fee of Architects for the 11th unit in a housing project.a. 20% of the MBF for the 1st unit b. 25% of the MBF for the 1st unitc. 30% of the MBF for the 1st unit d. 35% pf the MBF for the first unit

    138.The Minimum Basic Fee of Architects for the 11th unit in a repetitive project.a. 30% of the MBF for the 1st unit b. 40% of the MBF for the 1st unit

    c. 45% of the MBF for the 1st unit d. 60% of the MBF for the 1st unit

    139.How much can an architect bill for a design upon signing of agreement?a. 3% of the MBF b. 5% of the MBF c. 8% of the MBF d. 10% of the MBF

    140.As per new SPP, if a project is not constructed for any reason, how much is due for the architect as professional fee?

    a. 80% of the MBF b. 85% of the MBF c. 90% of the MBF d. 95% of the MBF

    141.Per diem means:a. Per day b. Per delivery c. Per dime d. Per week

    142.How much is the Professional Fee of an architect serving as expert witness?a.Php 300.00 per appearance b. Php 500.00 per appearance

    c. Php 1,000.00 per appearance d. Php 2,000.00 per appearance

    143.How are architects paid for the pre-design services?a. Gratis b. Lump Sumc.Multiple of direct expense d. Pro-rata Basis

    144.The part of the contract documents consisting of a detailed description of the technical nature of the materials, standards,

    and quality of execution of the work to be placed under contract.a. Estimate b. Bill of materials c. Material order d. Specification

    145.Which of the following is not a function of a construction manager?a. Coordination and supervision b. Cost and time controlc. Prepare shop drawings d. Quality control of work

  • 7/28/2019 Prof Prac Cec

    9/12

    PP+G.9 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    146.In a simple project costing Php 1 billion, how much is the architects minimum Professional Fee?a. Php 18.5 million b. Php 28.5 million c. Php 32.5 million d. Php 42.5 million

    147.The approved form of security furnished by the Contractor and his Surety as a guarantee of good faith on the part of theContractor to pay all obligations arising from the Contract.

    a. Guaranteed bond b. Payment bond c. Performance bond d. Proposal bond

    148.A written form of security executed by the bidder as principal and by a surety for the purpose of guaranteeing that thebidder will sign the contract, if awarded the contract, for the stated bid amount.

    a. Bid bond b. Guaranteed bond c. Proposal bond d. Security bond

    149.A specification that stipulates the use of specific products, systems, or processes without provision for substitution.a. Descriptive specification b. Performance specificationc. Propriety specification d. Reference specification

    150.In the Design-Build by Administration, who is responsible for the compensation of the construction superintendent,purchasing agent, timekeeper, and property clerk rightfully assigned in the project?a. Architect b. Architect + Owner c. Contractor d. Owner

    151.The schedule of activities for a project. It shows start and finish dates, critical and non-critical activities, slack time, andpredecessor relationships.a. Allele chart b. Gant chart c. Nolan chart d. PERT chart

    152.Retention is released within how many months from the date of Final Payment?a. 2 b. 3 c. 4 d. 5

    153.154.155.156.157.158.159.160.161.

    Examining local laws, codes, and ordinances for a Planned Unit Development project falls under what service of the architect?

    PRE-DESIGN SERVICES

    162.A written communication issued by an owner authorizing

    a contractor to proceed with the work and establishingthe date of commencement of work.

    NOTICE TO PROCEED

    163.A legally enforceable agreement, usually in written form,between two or more parties to do or not to dosomething specified.

    CONTRACT

  • 7/28/2019 Prof Prac Cec

    10/12

    PP+G.10 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    164.A method for planning, scheduling, and managing aproject, combining all relevant information into a flowchart.

    CRITICAL PATH METHOD

    165.Written information adding to, clarifying or modifying thebidding documents.

    ADDENDUM

    166.A term used to describe partial construction workperformed within an existing structure. Remodeling

    without a building addition.

    ALTERATIONS

    167.An offer or proposal of a price. BID

    168.A contractors or consultants overhead expense;expenses indirectly incurred and not chargeable to aspecific project or task.

    INDIRECT COST (OREXPENSE)

    169.Contract drawings marked up to reflect changes madeduring the construction process.

    AS-BUILT DRAWINGS(ALSO KNOWN AS RECORD

    DRAWINGS)

    170.A written document between the owner and thecontractor signed by the owner and the contractorauthorizing a change in the work or an adjustment in thecontract sum or the contract time.

    CHANGE ORDER

    171.All drawings, specifications and addenda associated witha specific construction project.

    CONSTRUCTIONDOCUMENTS

    172.All costs for a specific project including costs for land,professionals, construction, furnishings, fixtures,equipment, financing and any other project related costs.

    PROJECT COST

    173.A written range of view or action; outlook; hence, roomfor the exercise of faculties or function; capacity forachievement; all in connection with a designated project.

    SCOPE OF WORK

    174.A section of the conditions of the contract, other than theGeneral Conditions and Supplementary Conditions, whichmay be prepared for a particular project. Specific clauses

    setting forth conditions or requirements peculiar to theproject under consideration, and covering work ormaterials involved in the proposal and estimate, but notsatisfactorily covered by the General Conditions.

    SPECIAL CONDITIONS

    What are the activities that under the Pre-Design Services of an architect?

    175.Economic feasibilitystudies

    176.Project financing 177.Architecturalprogramming

    178.Space managementstudies

    179.Site selection andanalysis

    180.Site utilization and land-use studies

    181.Promotional services

    What is the breakdown of fee of an architect for repetitive construction project without amending the original drawingdocuments?

    182.1st structure: MBF 183.2n structure: 80% of BF 184.3r structure: 60% of

    BF

    185.4t structure: 40% of BF

    186.A landscape design project costing to Php 640, 300 is requiring a submission of thefinal design, how much will the architect be paid?

    a. Php 19 209 b. Php 28 813.50c. Php 48 022.50 d. Php 64 300

    187.A design team worked on a master development plan of a housing project in Central

  • 7/28/2019 Prof Prac Cec

    11/12

    PP+G.11 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    Luzon. The architect rendered 158 hours with a rate of Php 550/hr. His design teamincludes a design consultant and a staff of five. The consultant charges a rate ofPhp 800/hr and spent 48 hours in the project. The five members of the staff are tobe paid according to the minimum wage policy and they spent 180 hours in theproject development. The design team went to the project site thrice and cost theentire travel Php 2 250. What is the method of compensation for this kind ofservice?a. Mixed method b. Multiple of direct personal expenses

    c. Percentage fee methodd. Professional fee + expenses

    188.Compute for the total fee of the design team?a. Php 19 209 b. Php 28 813.50c. Php 48 022.50 d. Php 64 300

    189.How much is the fee of the architect?a. Php 32 600 b. Php 38 400c. Php 64 800 d. Php 86 900

    190.How much is the fee of the consultant?a. Php 32 600 b. Php 38 400c. Php 64 800 d. Php 86 900

    Identify the five (5) Basic Architectural Documents.

    191. 192.

    193. 194.

    195.

    Identify the Seven (7) Pre-Design Services of the architect

    196. 197.

    198. 199.

    200. 201.

    202.

    C. Identify the four phases under design services of the architect.

    203. 204.

    205. 206.

    Identify at least five (5) Specialized Allied Services of the architect.

    207. 208.

    209. 210.

    211.

    Identify three (3) services of the architect during Building Construction.

    212.

    213.

    214.

    Identify three (3) services of the architect after Building Construction.

    215. 216. 217.

  • 7/28/2019 Prof Prac Cec

    12/12

    PP+G.12 thebrown bauhausSTUDIO ARCHITECTURECOMPREHENSIVE ARCHITECTURE LICENSURE EXAMINATION REVIEW + PREPARATION PROGRAM

    COMPREHENSIVE EVALUATION COURSEAll rights reserved. No part of this study material may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, photocopying, recording, or

    otherwise, without the prior permission of The Brown Bauhaus Studio Architecture.CEC-CALERPP SERIES OF 2012

    Identify the classifications of buildings by occupancy under the National Building Code.

    218. 219. 220.

    221. 222. 223.

    224. 225. 226.

    Identify the types of Building construction under the National Building Code.

    227. 228.

    229. 230.

    For ten (10) points, which of the two laws shall prevail over the 1 meter discrepancy onthe provision on maximum travel distance from any point of a structure to the nearestexit or exitway? Justify your answer.

    For five (5) points, explain the difference between a Project Manager and a ConstructionManager.