Goran Hassan cv

8
Curriculum Vitae Personal Information Name: Goran Hassan Aziz Date of Birth: March 16, 1980 Place of Birth: Baghdad / Iraq Marital Status: Married Gender: Male Nationality: Iraqi Permanent Address Tel: 00964 (0) 770 152 0963 (Mobile) E-Mail Address [email protected] [email protected] LinkedIn URL: www.linkedin.com/in/goran-hassan-01a69274 Education MBA in AUIS/ Suliamanyah 2014 - 2015 B. Sc. in Mechanical Engineering / General, University of Salahaddin 2002 - 2006, Irbil, Iraq. D. Sc. In Mechanical Technology / Production, Sulaimanyah Technical institute 2000 - 2001, Sulaimanyah, Iraq. One-year experience in Radiology / Sulaimanyah Technical institute 1999 – 2000. Languages Kurdish – Mother tongue Arabic - …Fluent., (Spoken and Written) English – …Very Good., (Spoken and Written) Computer Skill Very good user for (MS office, MS windows, NT, Oracle and Cegid). Very Good in fixing and repairing PC, and installing PCs. 1

Transcript of Goran Hassan cv

Page 1: Goran Hassan cv

Curriculum Vitae

Personal Information

Name: Goran Hassan Aziz

Date of Birth: March 16, 1980 Place of Birth: Baghdad / IraqMarital Status: Married Gender: MaleNationality: Iraqi

Permanent Address

Tel: 00964 (0) 770 152 0963 (Mobile)

E-Mail Address [email protected] [email protected] URL: www.linkedin.com/in/goran-hassan-01a69274

Education MBA in AUIS/ Suliamanyah 2014 - 2015

B. Sc. in Mechanical Engineering / General, University of Salahaddin 2002 - 2006, Irbil, Iraq.

D. Sc. In Mechanical Technology / Production, Sulaimanyah Technical institute 2000 - 2001, Sulaimanyah, Iraq.

One-year experience in Radiology / Sulaimanyah Technical institute 1999 – 2000.

Languages Kurdish – Mother tongue

Arabic - …Fluent., (Spoken and Written)

English – …Very Good., (Spoken and Written)

Computer Skill Very good user for (MS office, MS windows, NT, Oracle and Cegid).

Very Good in fixing and repairing PC, and installing PCs.

Employment Record February 27, 2005 till October 30, 2006 Local Organizer in Accb company:

Responsible for arranging the required quantity of construction materials (ready cement) to be delivered to the customers.

Responsible for progress the installation process of the other parts of the factory. Responsible for repairing procedure and calculate the required parts to be sent from the

1

Page 2: Goran Hassan cv

supplier for the heavy equipment. Responsible for organizing and facilitating the communication between the company

and the main contractor and finding new potential sources.

November 1, 2006 till February 2, 2009 as ME (Maintenance Engineer) in UCC (United Cement Company).

Responsible for any maintenance activities in crushers. Responsible for arranging PR and WR in P1. Responsible for contractor employees and demand issues Responsible for arranging training courses for the contractor and the UCC employees in P1. Schedule and organize the stoppage period for maintenance. Arrange P1 activities to aligned with the other plant process. Responsible for safety activity and the H&S regulation and rules in P1. Responsible for the projected and modification done in P1 and check it.

February 2, 2009 till July 31, 2010 as MTL (Maintenance Team Leader) in UCC (United Cement Company).

Responsible for the approval of the entire project on crushers and P1 area. Responsible for discussions to resolve technical matters with respect to company policy and

safety procedure. Responsible for managing and organizing maintenance team (Mechanic and Electric). Provides monthly reports on P1 situation, also verify the required budget for repair and

deficiency. Provides monthly reports on maintenance actions, also verify the stoppage time for

maintenance. Responsible on the contractor salaries in P1 and varied it according the company contract. Responsible for installing the new weight bridge scales in quarries. Participate in the development and implementation of new technique in department policies

and procedures. Participate in the development and implementation PPE in both plants. Participate in the development and implementation the LTOTO in plant. Responsible for Rehabilitations the crusher FA and daily now can crusher about 1200 t/hr. Arrange for site visits, meetings, presentations, demonstrations and establish a smooth

business relation with the contractor employees which work in quarries. Perform many other duties assigned by my manager.

2

Page 3: Goran Hassan cv

August 1, 2010 till May 30, 2011 Act as manager (Raw material /Purchasing) BU.

Responsible for approval entire project on supplying raw materials for two cement factories. Responsible for managing and resolve technical matters and challenges with respect to

company policy and safety procedure. Responsible for managing and organizing the deliveries of raw material and how to avoid

stoppage during the vacations and crisis. Provides monthly reports on the raw material situation and stocks, also verify the required

budget for maintaining within budget. Provides monthly reports and analysis for local market and price fluctuation, also verify the

stoppage that will happen if we not follow emergency plans. Responsible for the contractor safety management and implement it on the company

contractors. Responsible for make communication with people who they live near to our factories to

make our company in a direct line with them regard them demands. Participate in the development and implementation of new techniques in department

policies and procedures. Participate in the development and implementation PPE (personal protective equipment) in

both factories. Participate in the development and implementation the LTOTO in both factories. Responsible for finding new sources for Sand, Iron Ore, Explosive, Clay, LS…. etc. Arrange for site visits, meetings, presentations, demonstrations and establish a smooth

business relation with the contractors which they are working with us. Perform many other duties assigned by my N +1.

July 1, 2011 till December 31, 2011 manager (Industrial Purchasing Manager) BU.

Authorized to arrange, negotiate and create all raw material contracts. Responsible for approval entire project on supplying raw materials for two cement factories. Responsible for managing and resolve technical matters and challenges with respect to

company policy and safety procedure. Responsible for managing and organizing the deliveries of raw material and how to avoid

stoppage during the vacations and crisis. Provides monthly reports on the raw material situation and stocks, also verify the required

budget for maintaining within budget. Provides monthly reports and analysis for local market and price fluctuation, also verify the

stoppage that will happen if we not follow emergency plans. Responsible for the contractor safety management and implement it on the company

contractors. Responsible for make communication with people who they live near to our factories to

make our company in a direct line with them regard them demands. Participate in the development and implementation of new technique in department policies

and procedures. Participate in the development and implementation PPE (personal protective equipment) in

both factories. Participate in the development and implementation the LTOTO in both factories. Responsible for finding new sources for Sand, Iron Ore, Explosive, Clay, LS….etc. Arrange for site visits, meetings, presentations, demonstrations and establish a smooth

3

Page 4: Goran Hassan cv

business relation with the contractors which they are working with us. Perform many other duties assigned by my N +1.

January 1, 2012 till July 31, 2016 Sourcing Manager (Industrial, contracting and services manager /Purchasing) BU.

Authorized and responsible for arrange, negotiate and create all purchasing contracts

Authorized to assign committees for investigation and follow market situations. Authorized to arranging, negotiate and create all raw material contracts. Responsible for approval entire project on supplying raw materials for two cement factories. Responsible for managing and resolve technical matters and challenges with respect to

company policy and safety procedure. Responsible for managing and organizing the deliveries of raw material and how to avoid

stoppage during the vacations and crisis. Provides monthly reports on the raw material situation and stocks, also verify the required

budget for maintaining within budget. Provides monthly reports and analysis for local market and price fluctuation, also verify the

stoppage that will happen if we not follow emergency plans. Responsible for the contractor safety management and implement it on the company

contractors. Responsible for make communication with people who they live near to our factories to

make our company in a direct line with them regard them demands. Participate in the development and implementation of new technique in department policies

and procedures. Participate in the development and implementation PPE (personal protective equipment) in

both factories. Participate in the development and implementation the LTOTO in both factories. Responsible for finding new sources for Sand, Iron Ore, Explosive, Clay, LS…. etc. Arrange for site visits, meetings, presentations, demonstrations and establish a smooth

business relation with the contractors which they are working with us. Perform many other duties assigned by my N+1. Manage the travel agencies prices, apartment renting cost, renting equipment, equipment

depreciation and fatigue time, cost analysis and training for new incomer.

4

Page 5: Goran Hassan cv

August 1, 2016 till now Purchasing Manager – Binastore

Responsible for approval and manage entire project on supplying raw materials to End-User.

Responsible for managing and resolve technical matters and challenges with respect to company policy and procedure which align with the corporate core value CRISP.

Responsible for managing and organizing the deliveries of all SKU's and how to avoid shortage for the requested SKU's.

Participate in the development and implementation of new technique in department policies and procedures.

Participate in the development and implementation market expanding plan Participate in the development and implementation the RTM. Responsible for finding new sources for Sand, Tools, Semi finishing material, LS, Crushed

LS, Gravel, Water Resistance Material …. etc. Arrange for site visits, meetings, presentations, demonstrations and establish a smooth

business relation with the contractors which they are working with us.

Training courses Operational Training Course

Team work, Communication Teams, Vibration 3 training courses, Balancing, Lubrications, Alignment, Failure analysis and Kiln Alignment

Soft Skills Training

Microsoft office, AutoCAD, 2 Courses in American dialect each course 3 months, Safety issue and demand (Risk assessment, WAH, LOTOTO, FHRA, EIF), Managerial skills, TOECH, Code of Business conduct, Access Control for Factories gates/ Romania, Supply Chain and Procurement, Future Lafarge Leader

Key Competencies and Skills

Diagnostic Information Gathering Fostering Teamwork/Team Leadership Strong Interpersonal Skills Analytical Thinking, Forward Thinking and Strategic Thinking Managing Changes and Decisiveness Managing Performance Fostering Innovation Good Communicator Flexibility Business Developer

Achievements Briefly my achievements during my career, Create the maintenance team for

crusher operation, that team reduces stoppage time for maintenances 753.5 hrs/yrs. as an average which mean about 70% reduce the stoppage period for failure.

I had worked on rehabilitate crusher FA which was not working from 1989 due to many deficiencies and failures after that rehabilitation, its crushing about 1200

5

Page 6: Goran Hassan cv

tons/hr raw materials from 2007 and many modifications in the coupling systems and the gearboxes of the crusher area had been done, even the hydraulic jacks of the mixing bed had been changed and installed successfully and gate the target in the elevation we was looking for to increase the store capacity for the raw mix, also install four weight bridge scaled in the quarries roads and all its complementary works, install new hydraulic system for the grate bars carts in crusher VER with two jacks and also change the crusher lining bolts by grade 8.8 to be more resistible, repair 2 cement pump trucks which were the cement was coagulate in the piston of the pumps, also I received award for the safety activities from Mr Marcel and Mr Rosman.

First four months when I had joined Purchasing /raw material department, I had achieved 3.5 MUSD saving vs. 2010.

Find new four sources of raw materials lead for 3 MUSD vs. 2013. Find two new sources for explosive lead for 2.5 MUSD vs. 2014. Achieve Zero stoppage in two factories (BU) for raw materials 2015. Change all contracts for long term contract with working hour basis not on daily

basis 2016. New Sources for Domestic Iron Ore and Sand, the saving from this action exceed

2 MUSD. References Rozhgar Barzan, Senior Supply Chain Manager 009647701301923

[email protected] Amanj Amjad, BU Legal Affair Manager 009647701548381

[email protected] Barzan Jamal Omer, BU Procurement Director 009647701105440

[email protected] Ali Said, GM South A&C +964 780 912 4342

[email protected] Osama Hasan, Sr. Procurement Manager – Karbala Cement Manufacture

Limited 009647809171313 [email protected]

6