AGATA Slow Control

8
Feb 19th, 2009 - Legnaro EDAQ meeting - 1 CEA DSM Irfu SPhN AGATA Slow Control Legnaro, 2009 02 19

description

AGATA Slow Control. Legnaro, 2009 02 19. Last meeting June 10th 2008 in Padova Not so much progress : interfaces between two WG, responsibilities and manpower. Need more coordination between DAQ and FEE Already some discussion this week, to be continued on a regular basis - PowerPoint PPT Presentation

Transcript of AGATA Slow Control

Page 1: AGATA Slow Control

Feb 19th, 2009 - Legnaro EDAQ meeting - 1CEA DSM Irfu SPhN

AGATA Slow Control

Legnaro, 2009 02 19

Page 2: AGATA Slow Control

Feb 19th, 2009 - Legnaro EDAQ meeting - 2CEA DSM Irfu

• Last meeting June 10th 2008 in Padova• Not so much progress : interfaces between two WG,

responsibilities and manpower.• Need more coordination between DAQ and FEE• Already some discussion this week, to be continued

on a regular basis• DAQ WG task 3 : « slow control integration »

(apologize from F. Saillant).

• Need for a new team ?

Page 3: AGATA Slow Control

Feb 19th, 2009 - Legnaro EDAQ meeting - 3CEA DSM Irfu

• Two slow control level :– Low level (on virtex, vhdl)– High level, any language

• Need connection with top level (RC)– Init/Start/Stop/Save/Restore …– state machine– web services : see Vic’s implementation

• GUI, not necessarily sophisticated

• Saving/restoring parameters : see Vic’s implementation

• Log : see Vic’s SC

• Monitoring : some tools available like spectra using GRU, rates using WS, …

Page 4: AGATA Slow Control

Feb 19th, 2009 - Legnaro EDAQ meeting - 4CEA DSM Irfu

• Configurations management : how ?• Experiment topology : link between IP address /

hardware / detector• Interdependences• Slow control harmonization• …• …

Page 5: AGATA Slow Control

Feb 19th, 2009 - Legnaro EDAQ meeting - 5CEA DSM Irfu

• Agenda– Introduction (Christophe and/or Dino)– Short presentation of network and infrastructure (E.

Calore) – Short presentation of web services (Pietro/Michele) – Digitizer slow control status (Vic)– ENX and the slow control for Orsay mezzanines

(Nicolas)– Mezzanines GUI (Nabil)– GTS slow control (Joel)– The carrier slow control (Damiano)– Discussion on the carrier, GTS  and Trigger slow

control (All)

Page 6: AGATA Slow Control

Feb 19th, 2009 - Legnaro EDAQ meeting - 6CEA DSM Irfu

ToDo - Priorities

1. Vic’s WSDL implementation

2. Definition of new WSDL messages

3. Synchronization of subsystems – sequences of actions. Document list of actions. Coordination of SC technologies

4. Topology• Save/Restore• Global configuration (RC)

In parallel :• Monitoring• Diagnostic : replace chipscope• GUIs

Page 7: AGATA Slow Control

Feb 19th, 2009 - Legnaro EDAQ meeting - 7CEA DSM Irfu

Responsibilities

• Need someone to coordinate

Page 8: AGATA Slow Control

Feb 19th, 2009 - Legnaro EDAQ meeting - 8CEA DSM Irfu

Meetings

• Agata week. Tuesday afternoon ?• F2f meeting in june ?