    PROGRESS REPORT NO. 8April 2001

    CONSTRUCTION SUPERVISION OF

    RIZAL/ARGONAUT HIGHWAY

    WIDENING AND SBF EXPRESSWAY

    EXTENSION PROJECT

    Cabunilas, Anfy M.Calivo, Chrislene D.

  • 8/6/2019 [2] CE 124 part 1

    2/41

  • 8/6/2019 [2] CE 124 part 1

    3/41

  • 8/6/2019 [2] CE 124 part 1

    4/41

    PROJECT DATA

    Construction of Rizal / Argonaut Highwayand SBF Expressway Extension

    Contract Package RB-01

    Existing road consisted of asphalt pavedroad with some sections showing defectsand a new construction (By-Pass section)

    approx. 1.22 km

  • 8/6/2019 [2] CE 124 part 1

    5/41

    PROJECT PROFILE 3 existing roads: from 2 to 4 lanes, aggre.

    length = 4.22 km

    improvement of 1.737 km existing roadsection

    new construction of 1.81 km by-pass road

    construction of: 6 new concrete bridges, bored pile found.,

    approx. total length = 415.60 m 6 utility bridges on 4 bridge locations

    relocation of affected existing public utilities

    signalized intersections on 6 major junctions

  • 8/6/2019 [2] CE 124 part 1

    6/41

  • 8/6/2019 [2] CE 124 part 1

    7/41

    REASON FOR SLIPPAGE

    Delay in the issuance of the Tree CuttingPermit

    resolved only last February 15, 2001

    4 month time extension subject for

    approval by FAPO-PMO

  • 8/6/2019 [2] CE 124 part 1

    8/41

    RECOMMENDATION

    Mobilize more equipment

    construction of bridges and by-pass

    section

  • 8/6/2019 [2] CE 124 part 1

    9/41

  • 8/6/2019 [2] CE 124 part 1

    10/41

    PROJECT UPDATE

    As of April 30, 2011:

    slippage: -33.64%

    actual cum. accomplishment: 15.88% sched. accomplishment: 49.520%

    Revised Bar Chart/S-Curve:

    slippage: -2.259%

    actual accomplishment: 15.879% sched. accomplishment: 18.138%

    % time elapsed: 41.228%

  • 8/6/2019 [2] CE 124 part 1

    11/41

  • 8/6/2019 [2] CE 124 part 1

    12/41

    CONTRACTORS

    WORKACCOMPLISHMENT

  • 8/6/2019 [2] CE 124 part 1

    13/41

    PART A. FACILITIES FOR THEENGINEER

    Operations and Maintenance of FieldOffice, Laboratory, and Staff Quarters

    Operation and Maintenance of ServiceVehicles

    Furnishing of Progress Photographs

  • 8/6/2019 [2] CE 124 part 1

    14/41

    PART C. EARTHWORKS

    Road Section A (Basin St.Binictican Br.)

    clearing and grubbing, Sta. 0+340.00Sta.

    0+560.00

  • 8/6/2019 [2] CE 124 part 1

    15/41

    PART C. EARTHWORKS

    Road Section C (Boton Br.By-Pass Rd.)

    excavation, common materials (Sta. 0+595

    Sta 0+770)

    rock embankment (Sta. 0+980Sta. 1+280)

    granular materials formation (Sta. 1+586

    Sta. 1+793)

    laying of RCPC, various diameters construction of RCBC, Sta. 1+300.00

  • 8/6/2019 [2] CE 124 part 1

    16/41

    PART C. EARTHWORKS

    Road Section D (Boton Br.Tarlac Rd.)

    removal of existing trees

  • 8/6/2019 [2] CE 124 part 1

    17/41

    PART F. BRIDGECONSTRUCTION

    Kalalake Bridge

    bored pile construction at Abutment A

    Installation of reinforcing steel for pile cap

    at Pier 1

    Removal of Structure/Obstruction

  • 8/6/2019 [2] CE 124 part 1

    18/41

    PART F. BRIDGECONSTRUCTION

    Malawaan Viaduct

    bored pile construction at Pier 5, bore hole

    no. 2

    installation of reinforcing steel and pouring

    of concrete for Prestressed Type V AASHTO

    Girders

    construction craneway

  • 8/6/2019 [2] CE 124 part 1

    19/41

    PART F. BRIDGECONSTRUCTION

    Boton 1 Bridge

    bored pile construction, Abutment A

    casting of Prestressed concrete girder

    Malawaan 2 Bridge

    preparation works for pile bent driving the

    Detour Bridge

  • 8/6/2019 [2] CE 124 part 1

    20/41

    PART F. BRIDGECONSTRUCTION

    Binictican Bridge

    construction of Abutments A & B of the

    Utility Bridge

    construction of Detour Bridge and

    Approaches

  • 8/6/2019 [2] CE 124 part 1

    21/41

    PART G. DRAINAGE AND

    SLOPE PROTECTIONSTRUCTURES

    Construction of Type A Lined Canal atBasin St.Binictican Rd.

    BotonBy-Pass Rd.:

    excavation for pipe

    structural excavation for box

    laying of pipe culverts

    construction of RCBC, Sta. 1+300.00

  • 8/6/2019 [2] CE 124 part 1

    22/41

    PART I. SPECIAL PROVISIONS

    Installation of concrete pedestal for streetlighting

  • 8/6/2019 [2] CE 124 part 1

    23/41

    PART K. RELOCATION ANDINCLUSION OF PUBLIC UTILITIES

    Telecom

    excavation for conduits and manhole

    Electrical

    provision and erection of concrete electric

    poles

    Water Line

    construction of sewage lift station

  • 8/6/2019 [2] CE 124 part 1

    24/41

    OTHER ACTIVITIES

    Cutting and bending of reinforcing barsfor bridges, culverts, and manholes

    Pre-casting of street lights and streetpedestals

    Pre-casting of concrete sheet piles

  • 8/6/2019 [2] CE 124 part 1

    25/41

    PROJECTDESCRIPTION

  • 8/6/2019 [2] CE 124 part 1

    26/41

    A. ROADWORKS 3 existing road sections: from 2 to 4 lanes

    const. of a by-pass road that runs on a newalignment

    SECTIONS: Basin St.Binictican Bridge(Rizal Hway, ~2.26

    km) George Dewey St.Causeway St. (Argonaut

    Hway, ~1.19 km)

    BotonTarlac Section (Argonaut Hwayextension, ~2.34 km) BinicticanBoton Section (By-Pass Rd., ~1.22

    km)

  • 8/6/2019 [2] CE 124 part 1

    27/41

    B. BRIDGES

    Kalalake Bridge (along Argonaut Hway)

    47.74 m, three-span

    superstructure resting on 2 bored piles

    (1200mm dm. by 44 m, 1500mm dm. by 49

    m resp.)

    span 1: 16.00m RDG girder; span 2: 18.40

    steel girder; span 3: 12.50m RCDG existing will be removed and replaced

  • 8/6/2019 [2] CE 124 part 1

    28/41

    B. BRIDGES

    Binictican Bridge (along Rizal Hway)

    30.80 m, 3-span

    bored piles: 1000mm by 40.0m, at piers and

    400mm by 400mm precast piles, ~30.0 m

    long abutments

    deck is flat slab

  • 8/6/2019 [2] CE 124 part 1

    29/41

    B. BRIDGES

    Malawaan Bridge (along ArgonautHway)

    25.80 m, 3-span

    bored piles: 1000mm by 40.0m, at piers and

    precast piles, 30.0 m long at abutments

    deck is flat slab

  • 8/6/2019 [2] CE 124 part 1

    30/41

    B. BRIDGES

    Boton II Bridge (along Argonaut Hway)

    40.80 m, 5-span

    bored piles: 900mm by 47.0 m, at piers and

    precast piles, 47.0 long at abutments

    deck is flat slab

  • 8/6/2019 [2] CE 124 part 1

    31/41

    B. BRIDGES

    Malawaan Viaduct (along the By-PassRd.)

    240 m, 7-span

    bored piles: 1800mm by 43.0 m

    prestressed concrete girders, 32 m long

  • 8/6/2019 [2] CE 124 part 1

    32/41

    B. BRIDGES

    Boton I Bridge (Along the By-Pass Rd.)

    singe-span, 32.90m

    bored piles: 1800mm by 44 m

    prestressed concrete girders 32.0 m long

  • 8/6/2019 [2] CE 124 part 1

    33/41

    C. CRANEWAY

    made of coco logs

    Malawaan Viaduct, Kalalake Bridge

    (made of steel sheet piles)

    Boton I Bridge (using Steel H-Piles)

  • 8/6/2019 [2] CE 124 part 1

    34/41

    D. DETOUR ROADS ANDBRIDGES

    locations:

    Boton II

    Malawaan II

    Binictican

  • 8/6/2019 [2] CE 124 part 1

    35/41

    E. UTILITY BRIDGES

    Along:

    Binictican

    Boton II

    Malawaan II

    Kalalake

  • 8/6/2019 [2] CE 124 part 1

    36/41

    F. UTULITIES

    Water and Sewer Pipelines

    Fuel Pipelines

    Elecrical Poles and Cables

    Telecom Cable

    CATV Cables

  • 8/6/2019 [2] CE 124 part 1

    37/41

  • 8/6/2019 [2] CE 124 part 1

    38/41

  • 8/6/2019 [2] CE 124 part 1

    39/41

  • 8/6/2019 [2] CE 124 part 1

    40/41

  • 8/6/2019 [2] CE 124 part 1

    41/41