BRE398: Building Information Modeling
BIM Project Case Study
Stephen AU
Oct. 17, 2013
Lecture Class BRE398: Building Information Modeling
BRE398: Building Information Modeling
Cases Study
MTECH Confidential– 2011 Page
Beijing 2008
Olympic
Stadium
Swire
Properties
One Inland East
Nan Fung
廣州国际贸易展示中心
Sa Po North
Residential
Estate
BRE398: Building Information Modeling
Cases Study
MTECH Confidential– 2011 Page
Beijing 2008
Olympic
Stadium
Swire
Properties
One Inland East
Nan Fung
廣州国际贸易展示中心
Sa Po North
Residential
Estate
BRE398: Building Information Modeling
2008 Beijing Olympic Stadium4
Architect: Herzog & de
Meuron
Engineering Consultant:
ARUP UK
Main Contractor:中国建筑设计研究院
BIM Consultant: MTECH &
Gehry Technologies
2003
BRE398: Building Information Modeling
BIMBridging the gap between concept and reality
5
Modeling concept, design and development Details
BRE398: Building Information Modeling
Structural Beam Design
BRE398: Building Information Modeling
Cases Study
MTECH Confidential– 2011 Page
Beijing 2008
Olympic
Stadium
Swire
Properties
One Inland East
Nan Fung
廣州国际贸易展示中心
Sa Po North
Residential
Estate
BRE398: Building Information Modeling
One Inland East11
Owner: SWIRE PROPERTIES
The total site area is 109,900 square feet comprising about 54,800 square feet from the sites of the industrial buildings and 55,100 square feet of adjoining land. The approved gross floor area of 1.5 million sq.ft (141,000 sq.m) represents a plot ratio of approximately 14.0 on the total site area. The approved plans are for a building of 70 storeys (59 office floors) to be erected on the sites of the industrial buildings with a height of approximately 280 metres. The estimated construction cost is approximately HK$3 billion.
Completion: 2004 to 2008
Consultants
Architect: Wong OUYANG
Structural: ARUP
MEP: MEINHARDT
QS: LEVETT & BAILY
Main Contractor
Gammon Construction
2005
BRE398: Building Information Modeling
Project Mission
Achieve the defined high building quality
Grade A and the highest commercial building in the East of
Hong Kong Inland
Early to start up the off-shore procurement
Reduce the construction time
70 stories building in 18 months
BRE398: Building Information Modeling
BIM Data Structuring
Architect
B. S.
Engineer
Structural
Engineer
BRE398: Building Information ManagementMTECH Confidential– 2005 Page14
机电系统同步設計 & 干涉检查
MEP Design - Design Collaboration
BRE398: Building Information Modeling
Virtual Construction Feasibility Study
MTECH Confidential– 2005 Page 17
Prof Heng Li, Tim Huang, Stephen Kong, Neo Chan, Samuel Guo, Jack Chung, Greg Chan
BRE398: Building Information Modeling
4-Day cycle in Typical Floor18
Reveal works coordination and resources utilization across indifferent bays.
MTECH Confidential– 2005 Page
BRE398: Building Information Modeling
4-Days Cycle
(Reality vs VP) Day 1
MTECH Confidential– 2005 Page 19
BRE398: Building Information Modeling
4-Days Cycle
(Reality vs VP) Day 4
MTECH Confidential– 2005 Page 20
BRE398: Building Information Modeling
Cases Study
MTECH Confidential– 2011 Page
Beijing 2008
Olympic
Stadium
Swire
Properties
One Inland East
Nan Fung
廣州国际贸易展示中心
Sa Po North
Residential
Estate
BRE398: Building Information Modeling
Nanfung China 琶洲南丰汇
Developer: Nanfung China
International Trading Exhibition Center with 17
floors:
1-4th floors – Exhibition hall
5th floor Dining area
6-17th floors Showroom offices
Under ground 1-3th floor – Car park and shopping
area
Location: Guangzhou, China
Ground Area : 24,862 sq. m.
Developed Area: 132,519.5sq.m
Local Architect: Guangzhou Architect Design Insitute
Main Contractor: Shanghai Construction
2008
BRE398: Building Information Modeling
Project Mission
Improved building quality, reduced construction costs and, time including:
Improved visibility by project leadership into information developed by the extended building team
Improved coordination of building systems to identify and address potential conflicts
Security of construction cost and time to project completion
Integration between design documentation and fabrication or construction activities
Reduced project transaction costs (paper printing, rework, etc.)
Correction of major design fault before construction
Early use of building design asset
BRE398: Building Information Modeling
Architect and Structure Design Conflicts
The struture beam is above the slab
BRE398: Building Information Modeling
Fall Ceiling Height Issue
L04 After Install the MEP Services, the Fall Ceiling Height cannot match 3100mm
BRE398: Building Information Modeling
Fall Ceiling Height Issue
Original Fall Ceiling Height is 6600mm, the outcome is 5500mm
BRE398: Building Information Modeling
Cases Study
MTECH Confidential– 2011 Page
Beijing 2008
Olympic
Stadium
Swire
Properties
One Inland East
Nan Fung
廣州国际贸易展示中心
Sa Po North
Residential
Estate
BRE398: Building Information Modeling
Sa Po North Residential Estate
Owner : Bright Strong Limited
Location : DD107, Sha Po North, Kam Tin, Yuen Long, N.T., Hong Kong
Project Manager: Sun Hung Kai Real Estate Agency Limited
Arch : Ronald Lu & Partners (Hong Kong) Limited
C&S : Sun Hung Kai Architects and Engineers Ltd.
M&E : Sun Hung Kai Architects and Engineers Ltd.
Site Area : 175,977 m2
GFA:
36,000 m2 (Domestic)
10,000 m2 (Non‐deomestic)
2,000 m2 (Club House)
Use : Residential 2012
BRE398: Building Information Modeling
Project Mission
Improved visibility by project leadership into information developed by the extended building team
Early use of building design asset
Improved coordination of building systems to identify and address potential conflicts
Security of construction cost and time to project completion
Integration between design documentation and fabrication or construction activities
Reduced project transaction costs (paper printing, rework, etc.)
Correction of major design fault before construction
BRE398: Building Information Modeling
Testing the work sequence in 4D before
the work begins
BRE398: Building Information Modeling
Optimization of Pipe works Layout
Optimize the headroom before pipeworks installed
Easy re-routing of various services to validate alternative routings
Easily checking pipeworks arrangement on façade wall
Optimize the wall opening to façade wall
Optimize the pipeworks layout in order to avoid the obstruction to the scene view from inside
BRE398: Building Information Modeling
Re-fine Slab Level
Making work ready by coordinating detailed 3D designs
Section A
Section B
Pipeworks installation in the bath room by the sunken slab
BRE398: Building Information Modeling
Life-Like Experience for Interior Design
Better Collaboration from Shared Vision of Needs,
Values and Purposes in the Design phase:
BRE398: Building Information Modeling
Summary
Why What Who When How
Business
Initiatives –
Time, Cost,
Quality,
Customer
satisfaction
BIM –
3D,4D,5D,….
Design,
Construction ,
O&M, Safety,
Green
Developers
Consultants
Contractors
Customers
Project
Lifecycle -
Design – Bid –
Build – O&M
BIM Execution
Plan
Business
Challenges –
limitation of
2D and
collaboration
Lean
Construction /
VDC/ Asset
Lifecycle
Management
BIM consultant