37
Roche Project ICUP35 BIM Modeling

Transcript of Roche-Project 3D Modeling

Page 1: Roche-Project 3D Modeling

Roche Project – ICUP35

BIM Modeling

Page 2: Roche-Project 3D Modeling

The project is located in Zhang Jiang Hi-Tech Park in Shanghai, the base on the north side of Long Dong Road, south of Li Shi Zhen Road, east of the ASE factory, On the west side of the Boehringer Ingelheim plant new 61# integrated power station.

2

Page 3: Roche-Project 3D Modeling

BIM-Model(Infra 3D )

3

Page 4: Roche-Project 3D Modeling

4

Underground buried pipeline and Sewer pipeline Drawing

屋顶设备管线图Pipe

Support

Drawing

BIM-Model(Infra 3D )

Page 5: Roche-Project 3D Modeling

泵房管线图

Comprehensive undergroun

d pipeline Drawing 5

BIM-Model(Infra 3D )

Page 6: Roche-Project 3D Modeling

6

Integrated pipeline drawing in trench for space management

Water pipeline drawing

BIM-Model(Infra 3D )

Page 7: Roche-Project 3D Modeling

MEP Equipment Arrangement

7

Basement

First Floor

Second Floor

Third Floor Fourth Floor

BIM-Model(CUP 3D )

Page 8: Roche-Project 3D Modeling

8

泵房管线图

MODEL

Overall

View

Space

Managemen

t

Openings

in Walls

2D layout integrated from 3D

model to ensure accuracy

BIM-Model(CUP 3D )

Page 9: Roche-Project 3D Modeling

9

Zoomed in Perspective

View

BIM-Model(CUP 3D )

Page 10: Roche-Project 3D Modeling

Rational use of space, beautiful

arrangement to facilitate construction

Screenshots of Basement10

BIM-Model(CUP 3D )

Page 11: Roche-Project 3D Modeling

11

Air outlet positioned as per

ceiling grid

BIM-Model(CUP 3D )

Page 12: Roche-Project 3D Modeling

12

Lighting, HVAC, Sprinkler etc.

positioned as per ceiling grid

BIM-Model(CUP 3D )

Page 13: Roche-Project 3D Modeling

Water System

Pipeline view at RoofPipeline view

at L1 13

BIM-Model(CUP 3D )

Pipeline view

at L3

Page 14: Roche-Project 3D Modeling

3D Model and Site picture61A-B19

14

Page 15: Roche-Project 3D Modeling

3D Model and Site picture61A-B19

15

Page 16: Roche-Project 3D Modeling

3D Model and Site picture61A-B19

1

6

Page 17: Roche-Project 3D Modeling

3D Model and Site picture61A-B19

17

Page 18: Roche-Project 3D Modeling

3D Model and Site picture61A-B18a

18

Page 19: Roche-Project 3D Modeling

3D Model and Site picture61A-B07a

19

Page 20: Roche-Project 3D Modeling

3D Model and Site picture61A-104

20

Page 21: Roche-Project 3D Modeling

3D Model and Site picture61A-105

21

Page 22: Roche-Project 3D Modeling

3D Model and Site picture61A-106

22

Page 23: Roche-Project 3D Modeling

3D Model and Site picture61A-113

23

Page 24: Roche-Project 3D Modeling

3D Model and Site picture61A-116

24

Page 25: Roche-Project 3D Modeling

3D Model and Site picture61A-116

25

Page 26: Roche-Project 3D Modeling

3D Model and Site picture61A-117

26

Page 27: Roche-Project 3D Modeling

3D Model and Site picture61B-3F

27

Page 28: Roche-Project 3D Modeling

3D Model and Site picture61B-3F

28

Page 29: Roche-Project 3D Modeling

3D Model and Site picture61B-4F

29

Page 30: Roche-Project 3D Modeling

Active and Existing INFRA between CUP and SHIP II building

3D Model and Site pictureINFRA

30

Page 31: Roche-Project 3D Modeling

2D Mechanical And Electrical Pipeline

Comprehensive Drawings

31

Page 32: Roche-Project 3D Modeling

2D UT Drawings.

32

Page 33: Roche-Project 3D Modeling

2D HVAC Drawings.

33

Page 34: Roche-Project 3D Modeling

34

2D Equipment pipeline section

Page 35: Roche-Project 3D Modeling

2D Aisle Section Drawings

35

Page 36: Roche-Project 3D Modeling

BIM - Operation and maintenance

36

Query the information of mechanical

equipment

Page 37: Roche-Project 3D Modeling

Doing now what patients need next