1 Blue, Karen To: Coker, Cristina Subject: RE: Turk leachate pond CQA report From Sent To: C Cc: J Greg Subj Cristy See a m: Terence E t: Wednesday Coker, Cristin Jason R Johns ory D Witte ject: Turk lea y, attached repo Wehling [ma y, December 0 a son; Greg Car achate pond C ort. TERENCE TEWEHLING 502 N ALLE ilto:tewehling 05, 2018 10:3 rter; Satyanan CQA report E E WEHLIN G@AEP.COM | N AVE, SHREVE g@aep.com] 35 AM nda Chakraba G | ENVIRON D:318.673.2721 EPORT, LA 7110 arti; David C. NMENTAL EN 01-2669 McCormick ( NGINEER PR Dave.McCorm RIN mick@terracon n.com); Rec’d Digitally AFIN:PMT#:S W DOC ID#:M D TO:By Karen Blue at 1:06 pm, Dec 05, 2018 29-00506 0311-S3N-R1 75069 AC>FILE <KMB

Transcript of Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached...

Page 1: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

1

Blue, Karen

To: Coker, CristinaSubject: RE: Turk leachate pond CQA report

FromSentTo: CCc: JGregSubj

CristySee a

m: Terence E t: WednesdayCoker, CristinJason R Johnsory D Witte ject: Turk lea

y,attached repo

Wehling [may, December 0ason; Greg Car

achate pond C

ort.

TERENCETEWEHLING502 N ALLE

ilto:tewehling05, 2018 10:3

rter; Satyanan

CQA report

E E [email protected] |N AVE, SHREVE

[email protected]]35 AM

nda Chakraba

G | ENVIROND:318.673.2721 EPORT, LA 7110

arti; David C.

NMENTAL EN

01-2669

McCormick (

NGINEER PR

Dave.McCorm

RIN

[email protected]);

Rec’d Digitally

AFIN:_________________________

PMT#:_________________________ SW

DOC ID#:______________________ MD

TO:___________________________

By Karen Blue at 1:06 pm, Dec 05, 2018

29-00506

0311-S3N-R1

75069

AC>FILE <KMB

Page 2: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502
Page 3: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Leachate Collection Pond CQA ReportSWEPCO – John W. Turk, Jr. Power Plant

Fulton, ArkansasPermit No. 0311-S3N-R1

AFIN: 29-00506

November 2018Terracon Project No. 35177117

Prepared for:American Electric Power

1 Riverside PlazaColumbus, OH 43215

Prepared by:Terracon Consultants, Inc.25809 Interstate 30 South

Bryant, Arkansas 72022(501) 847-9292

Page 4: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Terracon Consul tants, Inc. 25809 I-30 South Bryant , Arkansas 72022P [501] 847 9292 F [501] 847 9210 terracon.com

November 2018

American Electric Power1 Riverside Plaza, 22nd FloorColumbus, Ohio 43215

Attn: Mr. Terry Wehling, PE, Environmental Engineer PrincipalEmail: [email protected]

Re: Leachate Collection Pond CQASWEPCO – John W. Turk, Jr. Power PlantTerracon Project Number: 35177117

Dear Mr. Wehling:

Terracon Consultants, Inc. (Terracon) has completed the Construction Quality Assurance Reportservices for the above referenced project. This report presents the findings of our study of theslope conditions that occurred at the Turk facility.

We appreciate the opportunity to be of service to you on this project. If you have any questionsconcerning this report, or if we may be of further service, please contact us.

Sincerely,Terracon Consultants, Inc.

David McCormick, P.E. F. Owen Carpenter, P.E., P.G.Engineering Manager Senior Solid Waste Engineer

Enclosed: SWEPCO – John W. Turk, Jr. Power Plant Leachate Pond CQA Report

N:\Projects\2017\35177117\Working Files\Pond Repair CQA\Leachate Pond Slope CQA 11.7.18.docx

Page 5: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

i

PROFESSIONAL ENGINEER’S CERTIFICATION

“I certify to the best of my professional judgment that the repairs and improvements to theleachate collection pond at the SWEPCO – John W. Turk, Jr. Power Plant Class 3N Facility(Permit No. 0311-S3N-R1) was constructed in accordance with the permit plans and narrative,the project specifications, plans, and applicable Arkansas Department of Environmental Qualityregulations. Any deviations from the permitted drawings and the reason for the deviation are alsoincluded in this report as necessary. This certification is contingent on the fact that all informationsupplied to the signatory authority, at the time of this certification is unquestionably accurate andwas provided in good faith.”

David C. McCormick, P.E. Certification DateArkansas Professional Engineer Registration No. 9199

11-28-2018

Page 6: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

i

TABLE OF CONENTS

INTRODUCTION ............................................................................................................. 1BACKGROUND .............................................................................................................. 1PROJECT DESCRIPTION .............................................................................................. 13.1 KEY PERSONNEL ............................................................................................... 1LEACHATE COLLECTION POND IMPROVEMENTS .................................................... 2

APPENDIX A – AS-BUILT MODEL AND FIGURES

APPENDIX B – DAILY PROJECT FIELD LOGS

APPENDIX C – GEOMEMBRANE LINER REPAIR SUMMARIES

APPENDIX D – GEOMEMBRANE RUB SHEET SUMMARIES

APPENDIX E – PHOTO LOG

APPENDIX F – DRAWING DETAILS

Page 7: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Turk Leachate Collection Pond CQA ReportTurk Class 3N Landfill ■ Fulton, ArkansasNovember 2018 ■ Terracon Project No. 35177117

1

INTRODUCTIONSWEPCO owns and operates a Class 3N Solid Waste Landfill (Landfill) located in Fulton County,Arkansas. The Landfill address is 3711 Highway 355 S, Fulton, Arkansas 71838. The subjectLeachate Collection Pond (LCP) supports the landfill with leachate storage. Construction of the LCPwas completed in July 2012 as part of the waste disposal facility permitted by the ArkansasDepartment of Environmental Quality (ADEQ) under Solid Waste Permit No. 0311-S3N. FIGURE 1in APPENDIX A illustrates the layout of the Turk facility. FIGURE 2 illustrates the location andorientation of the LCP in relation to the facility’s waste management area. This construction qualityassurance (CQA) report summarizes testing and documentation activities performed by TerraconConsultants, Inc (Terracon) during the improvements of the LCP.

BACKGROUNDThis LCP consists of approximately 7.8 acres of composite bottom liner system and protective coverthat was completed in July 2012. The LCP has an underdrain system, 2-foot clay liner, 60-miltextured HDPE geomembrane, covered with a geotextile, and a protective cover layer. Thecomposite liner system slopes were constructed on a 3 H: 1 V while the protective cover layer wasfinished on a 4 H: to 1 Vertical. The protective cover system on the west slope of the LCP hadslipped down the embankment. On June 29, 2018 the ADEQ approved the installation of a 60-milrub sheet on the west slope and additional gravel drains on the south and southeast slopes to repairthe current system (See APPENDIX F).

PROJECT DESCRIPTIONTerracon Consultants, Inc. (Terracon) observed and documented the repairs to the geomembraneliner system and installation of a rub sheet along the west slope of the leachate pond located northof Cell 2. Also, the protective cover on the west slope was removed and placed on the south slope.Additional gravel drains were also installed on the south and southeast slopes.

3.1 KEY PERSONNEL

Boral CM Services, Inc. (Boral) was contracted to perform the earthwork for the project that includedexcavation of protective cover from the west slope, transfer of protective cover to the south slope,and installation of gravel letdown structures. Repair to the HDPE liner and installation of the rubsheet was contracted to Environmental Specialties International (ESI).

. The key personnel for each participating firm and suppliers in the project are listed below.

· Owner:SWEPCO

· Greg Witte, Project Manager· Huck Young, Project Manager

Page 8: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Turk Leachate Collection Pond CQA ReportTurk Class 3N Landfill ■ Fulton, ArkansasNovember 2018 ■ Terracon Project No. 35177117

2

· CQA Consultant:Terracon Consultants, Inc.

· Certifying Engineer: David C. McCormick, P.E.· Project Manager: Tony Bardella· CQA Monitors: Matt Acree and Scott McDonald

· General Contractor:Boral CM Services, LLC

· Tim Choate, Facility Manager

· Survey Control:Twin Creek Surveying, LLC

· John Cooke

· Geosynthetic Testing Laboratory:TRI Environmental

· Project Manager: Brian Anderson

· Geosynthetics Contractor:Environmental Specialties International.

· Dale Story, Project Manager

LEACHATE COLLECTION POND IMPROVEMENTSBoral began removing the protective cover from the west slope. The material on the west slope wastransported to the south slope (See Photo 1 in APPENDIX E). Boral cleaned the exposedgeomembrane on the west side. Terracon walked the west side and documented any damage notedon the geomembrane (See Photo 2). ESI arrived on site and cleaned and prepared the existingliner material prior to beginning repairs by using brooms, shovels, and grinders. The geosyntheticrepairs and rub sheet installation occurred during the period of August 27-28, 2018 (See Photos 3,4, 5, 6). The daily logs describing Terracon observations are in APPENDIX B. The liner repairswere made by ESI using 60-mil HDPE textured geomembrane patches where necessary (SeeFIGURE 2). The rub sheet was installed and its panel layout is presented on FIGURE 3. All repairswere made with an HDPE extrusion welder. The liner repairs were nondestructively tested using avacuum box. The documentation of the geomembrane liner repairs is shown in the summary tableslocated in APPENDIX C. The documentation of the rub sheet installation is located in APPENDIXD.

Boral also excavated gentle swales for stabilized letdown structures into the protective cover on thesouth slope. The south slope was flattened from the original 4 H: 1 V slope to an approximately 6H: 1 V slope (See FIGURE 4). Geotextile was installed above the let down swale areas (See Photo9). Protective letdown stone was then installed above the geotextile (See Photos 10 and 11).

Page 9: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Turk Leachate Collection Pond CQA ReportTurk Class 3N Landfill ■ Fulton, ArkansasNovember 2018 ■ Terracon Project No. 35177117

3

Boral constructed a geosynthetics anchor trench at the top of slope for keying in of the rub sheetgeomembrane. Boral then removed the temporary sandbags and installed clay rich soil in the rubsheet anchor trench (See Photos 12 and 13). The south slope was revegetated (See Photo 14).

Page 10: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

APPENDIX A

AS-BUILT MODEL AND FIGURES

Page 11: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

27

0

270270

28

0

280280

270 270

28

0

280

STORM WATER

RUNOFF POND

DISPOSAL CELL "2"DISPOSAL CELL "3"DISPOSAL CELL "4"DISPOSAL CELL "5"

MAKE-UP WATER POND

WASTE WATER

POND

LEACHATE COLLECTION POND

MW-#3

MW-#2

MW-#4

MW-#5

MW-#7

MW-#8

MW-#1

MW-#9D

MW-#10

MW-#6

FUTURE FUTURE FUTURE UNDER CONSTRUCTION CURRENT

DISPOSAL CELL "1"

8

4

5

67

MW-#11

DESI

GNED

BY:

SCAL

E:AP

PVD.

BY:

DRAW

N BY

:

DATE

:

SHEE

T NO

.:

JOB

NO.

OF

BYDE

SCRI

PTIO

NDA

TERE

V.

ACAD

NO.

2580

9 I-3

0 SOU

THBR

YANT

, AR

7202

2FA

X. (5

01) 8

47-9

210

PH. (

501)

847-

9292

Consulting E

ngineers and S

cientists

LEAC

HATE

PON

D RE

PAIR

SWEP

CO

SITE

LAYO

UT

FULT

ONAR

KANS

AS

DCM

TLB

DCM

AS S

HOW

N10

/01/20

1821

6-00

2-35

1771

1720

0

FIGU

RE 1

JOHN

W. T

URK,

JR. P

OWER

PLA

NT

N

0

SCALE IN FEET

50 250150

REPAIR AREAS

Page 12: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

R-1

R-7

R-8

R-10

R-9

R-6

R-2

R-5

R-4

R-3

R-12

R-13

R-14

R-15

R-11

R-66

R-25

R-24

R-16

R-17

R-18

R-67

R-22

R-23

R-21

R-19

R-20

R-29

R-28

R-27

R-26

R-35

R-34

R-36

R-37

R-31

R-32

R-30

R-33

R-39

R-38

R-40

R-41

R-42

R-43

R-44

R-45

R-46

R-47

R-68

R-69

R-70

R-48

R-49

R-50

R-51

R-52

R-63

R-62

R-61

R-64

R-65

R-60

R-59

R-58

R-55

R-54

R-53

R-56

R-57

DS-1

DS-2

LEACHATE

POND

Drawn By:

Checked By:

Approved By:

Project Mngr:

File No.

Date:

Scale:

Project No. FIG. No.

Consulting Engineers and Scientists

25809 I-30 SOUTH BRYANT, AR 72022FAX. (501) 847-9210PH. (501) 847-9292

REPAIR LAYOUTDCM

TLB

TLB

DCM

35177127

AS SHOWN

201

10/03/20182

LEACHATE POND REPAIRSWEPCO

JOHN W. TURK JR. POWER PLANTFULTON ARKANSAS

N

SCALE IN FEET

50 0 25 50

LEGEND:

DESTRUCT LOCATION

REPAIR LOCATION

R1

DS-1

Page 13: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

P-3

P-4

P-5

P-6

P-24

P-23

P-22P-2

P-7

P-8

P-9

P-10

P-11

P-12

P-13

P-14

P-15

P-16

P-17

P-18

P-19

P-20

P-21 P-1

LEACHATE

POND

Drawn By:

Checked By:

Approved By:

Project Mngr:

File No.

Date:

Scale:

Project No. FIG. No.

Consulting Engineers and Scientists

25809 I-30 SOUTH BRYANT, AR 72022FAX. (501) 847-9210PH. (501) 847-9292

RUBSHEET PANEL LAYOUTDCM

TLB

TLB

DCM

35177127

AS SHOWN

201

10/03/20183

LEACHATE POND REPAIRSWEPCO

JOHN W. TURK JR. POWER PLANTFULTON ARKANSAS

N

SCALE IN FEET

50 0 25 50

LEGEND:

PANEL

Page 14: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

FIGURE 4

Page 15: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

APPENDIX B

DAILY PROJECT FIELD LOGS

Page 16: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Daily Project Construction Summary 25809 Interstate 30 SouthBryant, AR 72022

Project No: (501) 847-9292

Date of Report:Client Name:

Contractor: x Clear Cold

Project Name: Cloudy Cool

Location: x Partly Cloudy x Warm

Representative: Raining x Hot

Technician: Windy 76 Low Temp. (°F)

Test Location: Foggy / Misty 97 High Temp. (°F)

Depart Lab: Depart Site: 5:00 PM Moisture/Density Subgrade

Arrive Site: Arrive Lab: 7:00 PM Shelby Tube(s) Clay Liner

Dozer(s) Skyjack Client 12 Liner Crew

Excavator(s) 1 Skidsteer Contractor Liner Installer

Backhoe(s) Water Truck CQA Consultant Concrete Crew

Haul Truck(s) Sheeps Foot Compactor Design Engineer Pipe Installer

Motor Grader(s) Smooth Drum Compactor Surveyor Gas Line Inst.

SUMMARY OF ACTIVITIES OBSERVED:

Note: Copies of all completed “Project Field Record Forms” are to be submitted to the Project Manager at the end of each day and should be maintained with the Project Records.

EQUIPMENT ONSITE: PERSONNEL ONSITE:

QA/QC EXPECTATIONS:

Observe repairs made to liner system of leachate pond.

Contractor used grinders to smooth welding edges.

Contractor used lysters to hold patches in place.

Contractor welded repair patches to panels using extrusion welders.

6:45 AM

351771178/27/2018American Electric Power WEATHER:

ESIAEP Turk Leachate Pond ErosionFulton, ARGreg WitteMatt AcreeLeachate Pond

REPORTING TIMES: FIELD TESTING PERFORMED:

5:00 AM

x

Page 17: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Daily Project Construction Summary 25809 Interstate 30 SouthBryant, AR 72022

Project No: (501) 847-9292

Date of Report:Client Name:

Contractor: x Clear Cold

Project Name: Cloudy Cool

Location: x Partly Cloudy x Warm

Representative: Raining x Hot

Technician: Windy 75 Low Temp. (°F)

Test Location: Foggy / Misty 97 High Temp. (°F)

Depart Lab: Depart Site: 5:15 PM Moisture/Density Subgrade

Arrive Site: Arrive Lab: 5:45 PM Shelby Tube(s) Clay Liner

Dozer(s) Skyjack Client 12 Liner Crew

Excavator(s) 1 Skidsteer Contractor Liner Installer

Backhoe(s) Water Truck CQA Consultant Concrete Crew

Haul Truck(s) Sheeps Foot Compactor Design Engineer Pipe Installer

Motor Grader(s) Smooth Drum Compactor Surveyor Gas Line Inst.

SUMMARY OF ACTIVITIES OBSERVED:

Boral began backfilling anchor trench.

OPERATIONAL CONCERNS & SOLUTIONS:

EQUIPMENT ONSITE: PERSONNEL ONSITE:

QA/QC EXPECTATIONS:

Observe deployment and welding of rubsheet.

Contractor used skidsteer to deploy rubsheet panels.

Contractor used wedge welders to fusion weld panels together and extrusion welded rubsheet to underlying liner to prevent blowups.

Contractor created vent slips along the top of the rubsheet to prevent gas buildup.

6:30 AM

351771178/28/2018American Electric Power WEATHER:

ESI / BoralAEP Turk Leachate Pond ErosionFulton, ARGreg WitteMatt AcreeLeachate Pond

REPORTING TIMES: FIELD TESTING PERFORMED:

6:15 AM

x

Page 18: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

APPENDIX C

GEOMEMBRANE LINER REPAIR SUMMARIES

Page 19: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Geomembrane Trial Weld Summary25809 Interstate 30 South

Client Name: Project Number: Bryant, AR 72022Contractor: CQA Monitor: Peel Extrusion = Phone: 501.847.9292

Project Name: Reviewed By: Shear Extrusion = Fax: 501.847.9210Address: Approved By: Peel Fusion =Location: Liner Installer: Shear Fusion =

Weld PassSample Seamer & Mat. Wedge Speed Preheat or

ID Initials Type Temp oF ft/hr Setting FailE P 109 - 108 - 112 - - - - -

60T SP P 120 - 111 - 114 - - - - -

60T S77 TW-2 115 DA - - 550 550 PASS134 134 136 - -

PASS139 133 137 - -DA - - 550 550

ESISpecification for Trial Welds

Fulton, AR

Date TimeFusion Weld Extrusion Weld

Turk Leachate PondJohn W. Turk Power Plant

35177117

Ambient

Tony BardellaTony BardellaMatt Acree

12091120

Machine Temp Test ValuesTemp oF Number

8.27.18 1:30

8.27.18 8:26 77 TW-1 115

78

ESI

oC lbs/inch

American Electric Power

Page 20: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Client Name: Project Number: Liner System 25809 Interstate 30 SouthContractor: CQA Monitor: Bryant, AR 72022

Project Name: Reviewed By: x Primary Phone: 501.847.9292Address: Approved By: Secondary Fax: 501.847.9210Location: Liner Installer: Other:

REPAIRDATE PANEL SEAM DIST OFFSET TYPE LENGTH WIDTH DIA MACH OPER QA DATE OPER PASS/ ACTION QA

(ft) (1) (2) (3) (ft) (ft) (ft) NO ID ID ID FAIL ID

8.27.18 P-3 2, 5 N-AT, W R-1 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-2 30, 2 N-AT, W R-2 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-2 50, 8 N-AT, W R-3 P E 3.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-2 45, 10 N-AT, W R-4 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-2 40, 12 N-AT, W R-5 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-2, 3 30 N-AT R-6 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-3 3, 20 N-AT, W R-7 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-5 10, 3 E-AT, S R-8 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-6 20, 3 E-AT, N R-9 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-6 5, 10 E-AT, N R-10 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-7 15, 10 E-AT, N R-11 P E 2.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-7 P-6, 7 58, 1 E-AT, N R-12 P E 2.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-7 60, 15 E-AT, N R-13 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-7 55, 14 E-AT, N R-14 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-7 45, 15 E-AT, N R-15 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-8 58, 18 E-AT, N R-16 P E 2.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-8 55, 20 E-AT, N R-17 P E 2.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-9 From P-8 to P-11 50, 1 R-18 P E 8.0 23.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-11 60, 2 E-AT, N R-19 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-11 59, 13 E-AT, N R-20 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-11 50, 3 E-AT, N R-21 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-11 37, 5 E-AT, N R-22 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-11 33, 7 E-AT, N R-23 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-11 2, 1 E-AT, N R-24 P E 6.0 4.0 115 DA MA 8.27.18 JR P VT MA

Matt AcreeTony BardellaTony BardellaESI

35177117

Geomembrane Repair Log SummaryAmerican Electric Power

REPAIRNO. AND

CODE

ESITurk Leachate PondJohn W. Turk Power PlantFulton, AR

LOCATION NON-DESTRUCTIVE TESTING

Page 21: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Client Name: Project Number: Liner System 25809 Interstate 30 SouthContractor: CQA Monitor: Bryant, AR 72022

Project Name: Reviewed By: x Primary Phone: 501.847.9292Address: Approved By: Secondary Fax: 501.847.9210Location: Liner Installer: Other:

REPAIRDATE PANEL SEAM DIST OFFSET TYPE LENGTH WIDTH DIA MACH OPER QA DATE OPER PASS/ ACTION QA

(ft) (1) (2) (3) (ft) (ft) (ft) NO ID ID ID FAIL ID

Matt AcreeTony BardellaTony BardellaESI

35177117

Geomembrane Repair Log SummaryAmerican Electric Power

REPAIRNO. AND

CODE

ESITurk Leachate PondJohn W. Turk Power PlantFulton, AR

LOCATION NON-DESTRUCTIVE TESTING

8.27.18 P-9 5, 7 E-AT, N R-25 P E 2.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-12 32, 13 E-AT, N R-26 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-12 37, 13 E-AT, N R-27 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-12 50, 3 E-AT, N R-28 P E 4.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-12 55, 7 E-AT, N R-29 P E 4.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-13 62, 4 E-AT, N R-30 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-13 56, 5 E-AT, N R-31 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-13 55, 6 E-AT, N R-32 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-13 60, 12 E-AT, N R-33 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-13 25, 2 E-AT, N R-34 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-13 24, 1 E-AT, N R-35 P E 4.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-13 22, 10 E-AT, N R-36 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-13 20, 7 E-AT, N R-37 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 30, 8 E-AT, N R-38 P E 1.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 50, 1 E-AT, N R-39 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 54, 4 E-AT, N R-40 PP E 4.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 60, 10 E-AT, N R-41 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 64, 11 E-AT, N R-42 P E 3.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 54, 12 E-AT, N R-43 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 58, 7 E-AT, N R-44 P E 5.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-15 50, 3 E-AT, N R-45 P E 5.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-15 37, 3 E-AT, N R-46 P E 3.0 3.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-15 15, 7 E-AT, N R-47 P E 3.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-17 58, 9 E-AT, N R-48 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-18 55, 10 E-AT, N R-49 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

Page 22: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Client Name: Project Number: Liner System 25809 Interstate 30 SouthContractor: CQA Monitor: Bryant, AR 72022

Project Name: Reviewed By: x Primary Phone: 501.847.9292Address: Approved By: Secondary Fax: 501.847.9210Location: Liner Installer: Other:

REPAIRDATE PANEL SEAM DIST OFFSET TYPE LENGTH WIDTH DIA MACH OPER QA DATE OPER PASS/ ACTION QA

(ft) (1) (2) (3) (ft) (ft) (ft) NO ID ID ID FAIL ID

Matt AcreeTony BardellaTony BardellaESI

35177117

Geomembrane Repair Log SummaryAmerican Electric Power

REPAIRNO. AND

CODE

ESITurk Leachate PondJohn W. Turk Power PlantFulton, AR

LOCATION NON-DESTRUCTIVE TESTING

8.27.18 P-22, 23 58, 3 E-AT, N R-50 P E 8.0 4.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-22 59, 1 E-AT, N R-51 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-23 58, 8 SE-AT, S R-52 P E 7.0 4.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-24, 27 0, 5 S R-55 R-53 P E 7.0 5.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-24 25, 5 SE-AT, N R-54 P E 10.0 5.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-24, 26, 27 R-55 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-27 20, 10 S-AT, E R-56 P E 10.0 10.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-24 25, 5 S-AT, E R-57 DS-2 E 4.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-27 10, 2 S-AT, E R-58 P E 4.0 3.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-26, 27 5, 0 S-AT R-59 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-27 10, 9 S-AT, E R-60 P E 4.0 3.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-28 55, 7 S-AT, E R-61 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-28 58, 8 S-AT, E R-62 P E 5.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-28 63, 8 S-AT, E R-63 P E 4.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-30, 31 25, 0 S-AT R-64 P E 2.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-29 5, 1 S-AT, E R-65 P E 5.0 3.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-8 5, 9 E-AT, N R-66 P E 2.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-9 50, 2 E-AT, N R-67 DS-1 E 4.0 2.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 60, 2 E-AT, N R-68 P E 2.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 64, 6 E-AT, N R-69 P E 3.0 1.0 115 DA MA 8.27.18 JR P VT MA

8.27.18 P-14 64, 8 E-AT, N R-70 P E 3.0 2.0 115 DA MA 8.27.18 JR P VT MA

Page 23: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Geomembrane Destructive Test Log Summary25809 Interstate 30 South

Project Number: Bryant, AR 72022CQA Monitor: Peel Extrusion = 78 Phone: 501.847.9292Reviewed By: Shear Extrusion = 120 Fax: 501.847.9210Approved By: Peel Fusion = 91

Location: Liner Installer: Shear Fusion = 120

Sample Seam Machine LabID Number Number Pass/Fail

P 118 120 113 130 136SP 143 108 148 143 133S

Destructive Testing SpecificationsContractor: ESI Matt Acree

Project Name: Turk Leachate Pond Tony BardellaAddress: John W. Turk Power Plant Tony Bardella

Client Name: American Electric Power 35177117

8.27.18 DS-1 P-9 - R-18 115 DA Pass Pass

8.27.18 DS-2 P-27 - R-56 252 DA Pass Pass R-56148 147 144 147 150

FieldInitials lbs/inch Pass/Fail

Fulton, AR ESI

Date Seamer Test ValuesComments/Location

139 140 144 144 141 R-18

Page 24: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS - SINGLE TRACKTRI Client: Terracon Consultants Inc

Project: AEP Turk Leachate Pond Erosion

Material: 60 mil. HDPESAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.)TRI Log#: 40638

TEST REPLICATE NUMBER

PARAMETER 1 2 3 4 5 MEAN

Sample ID: DS-1 | Weld: Single ExtrusionSide: Peel Peel

Peel Strength (ppi) 118 120 113 130 136 123Peel Incursion (%) <5 <5 <5 <5 <5Peel Locus Of Failure Code SE SE SE SE SEPeel NSF Failure Code FTB FTB FTB FTB FTB

Shear Shear

Shear Strength (ppi) 139 140 144 144 141 142Shear Elongation @ Break (%) >50 >50 >50 >50 >50

Sample ID: DS-2 | Weld: Single ExtrusionSide: Peel Peel

Peel Strength (ppi) 143 108 148 143 133 135Peel Incursion (%) <5 <5 <5 <5 <5Peel Locus Of Failure Code SE SE SE SE SEPeel NSF Failure Code FTB FTB FTB FTB FTB

Shear Shear

Shear Strength (ppi) 148 147 144 147 150 147Shear Elongation @ Break (%) >50 >50 >50 >50 >50

Page: 2 of 2

Page 25: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502
Page 26: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502
Page 27: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

APPENDIX D

GEOMEMBRANE RUB SHEET SUMMARIES

Page 28: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Geomembrane Daily Deployment LogClient Name: Project Number: 25809 Interstate 30 South

Contractor: CQA Monitor: Bryant, AR 72022Project Name: Reviewed By: Phone: 501.847.9292

Address: Approved By: Fax: 501.847.9210Location: Liner Installer:

8.28.18 P-1 3618 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-2 3618 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-3 3618 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-4 3618 95 Partly Cloudy/Breezy 60T 45 - 23 Y MA8.28.18 P-5 3618 95 Partly Cloudy/Breezy 60T 32 - 23 Y MA8.28.18 P-6 3618 95 Partly Cloudy/Breezy 60T 50 - 23 Y MA8.28.18 P-7 3618 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-8 3613 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-9 3613 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-10 3613 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-11 3613 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-12 3613 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-13 3613 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-14 3577 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-15 3577 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-16 3577 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-17 3577 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-18 3577 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-19 3577 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-20 3607 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-21 3607 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-22 3577 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-23 3607 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA8.28.18 P-24 3607 95 Partly Cloudy/Breezy 60T 70 - 23 Y MA

CQAMonitor

PanelVisually

Inpsected(Y or N)

Length (ft)Side 1

Length (ft)Side 2

Width(Feet)

Approximate Panel DimensionsDate Panel ID Roll Number

Weather Conditions

Amb. Temp.(ºF) Weather/Wind

Fulton, AR ESI

MaterialType

ESI Matt AcreeTurk Leachate Pond Tony BardellaJohn W. Turk Power Plant Tony Bardella

American Electric Power 35177117

Page 29: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Geomembrane Trial Weld Summary25809 Interstate 30 South

Client Name: Project Number: Bryant, AR 72022Contractor: CQA Monitor: Peel Extrusion = Phone: 501.847.9292

Project Name: Reviewed By: Shear Extrusion = Fax: 501.847.9210Address: Approved By: Peel Fusion =Location: Liner Installer: Shear Fusion =

Weld PassSample Seamer & Mat. Wedge Speed Preheat or

ID Initials Type Temp oF ft/hr Setting FailP P 105 - 100 - 106 - - - - -

60T SP P 105 105 110 116 109 112 - - - -

60T SP P 112 110 106 114 100 115 - - - -

60T SE P 102 - 110 - 109 - - - - -

60T S- - 550 550 PASS144 149 152 -- -8.28.18 2:00 95 TW-6 115 DA

860 7.0 - - PASS139 138 141 - -8.28.18 2:10 95 TW-5 4414 KM

850 7.0 - - PASS142 139 145 - -8.28.18 2:00 95 TW-4 4390 BS

- - 550 550 PASS141 144 146 - -8.28.18 7:20 80 TW-3 115 DA

Temp Test ValuesTemp oF Number oC lbs/inch

Date TimeFusion Weld Extrusion Weld

Ambient Machine

John W. Turk Power Plant Tony Bardella 91Fulton, AR ESI 120

ESI Matt Acree 78Turk Leachate Pond Tony Bardella 120

American Electric Power 35177117 Specification for Trial Welds

Page 30: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Geomembrane Seaming and Non-Destructive Test SummaryProject Number: 25809 Interstate 30 South

CQA Monitor: Bryant, AR 72022Reviewed By: Phone: 501.847.9292Approved By: Fax: 501.847.9210

Liner Installer:

Machine No.

WeldTypeFusion/ Date

Extrusion Start End +/- Start End

8.28.18 8:35 KM P-3 - P-4 44.0 S-AT - P6 44.0 F AT 8.28.18 30 30 0 8:42 8:47 P P MA8.28.18 9:08 KM P-4 - P-5 27.0 SW-AT - P6 71.0 F AT 8.28.18 30 30 0 9:15 9:20 P P MA8.28.18 9:08 KM P-4 - P-6 12.0 P5 - P3 83.0 F AT 8.28.18 30 29 -1 9:15 9:20 P P MA8.28.18 8:25 KM P-6 - P-7 70.0 W-AT - Toe 153.0 F AT 8.28.18 30 30 0 8:30 8:35 P P MA8.28.18 2:07 KM P-7 - P-8 70.0 W-AT - Toe 223.0 F AT 8.28.18 30 30 0 2:14 2:19 P P MA8.28.18 2:14 KM P-8 - P-9 70.0 W-AT - Toe 293.0 F AT 8.28.18 30 30 0 2:21 2:26 P P MA8.28.18 2:21 KM P-9 - P-10 70.0 W-AT - Toe 363.0 F AT 8.28.18 30 30 0 2:30 2:35 P P MA8.28.18 7:48 KM P-1 - Exis 73.0 N-AT - Toe 436.0 E JR - - - - - - - P MA8.28.18 7:52 KM P-1 - P-2 73.0 N-AT - Toe 509.0 F AT 8.28.18 30 30 0 8:04 8:09 P P MA8.28.18 2:10 BS P-10 - P-11 70.0 W-AT - Toe 579.0 F AT 8.28.18 30 30 0 2:30 2:35 P P MA8.28.18 2:28 KM P-11 - P-12 70.0 W-AT - Toe 649.0 F AT 8.28.18 30 30 0 2:45 2:50 P P MA8.28.18 2:20 BS P-12 - P-13 70.0 W-AT - Toe 719.0 F AT 8.28.18 30 29 -1 2:45 2:50 P P MA8.28.18 2:30 KM P-13 - P-14 70.0 W-AT - Toe 789.0 F AT 8.28.18 30 30 0 2:50 2:55 P P MA8.28.18 2:39 KM P-14 - P-15 70.0 W-AT - Toe 859.0 F AT 8.28.18 30 30 0 3:07 3:12 P P MA8.28.18 2:47 KM P-15 - P-16 70.0 W-AT - Toe 929.0 F AT 8.28.18 30 30 0 3:07 3:12 P P MA8.28.18 3:00 KM P-16 - P-17 70.0 W-AT - Toe 999.0 F AT 8.28.18 30 30 0 3:07 3:12 P P MA8.28.18 2:45 BS P-17 - P-18 70.0 W-AT - Toe 1069.0 F AT 8.28.18 30 29 -1 3:09 3:14 P P MA8.28.18 3:00 KM P-18 - P-19 72.0 W-AT - Toe 1141.0 F AT 8.28.18 30 30 0 3:17 3:22 P P MA8.28.18 3:18 KM P-19 - P-20 52.0 W-AT - P23 1193.0 F AT 8.28.18 30 30 0 3:28 3:33 P P MA8.28.18 3:48 KM P-19 - P-23 26.0 P20 - Toe 1219.0 F JR - - - - - - - P MA8.28.18 3:48 KM P-19 - P-22 2.0 P23 - Toe 1221.0 F JR - - - - - - - P MA8.28.18 3:24 KM P-20 - P-21 22.0 W-AT - P23 1243.0 F AT 8.28.18 30 29 -1 3:31 3:36 P P MA8.28.18 3:48 KM P-20 - P-23 23.0 P19 - P21 1266.0 F AT 8.28.18 30 30 0 4:05 4:10 P P MA8.28.18 3:48 KM P-21 - P-23 23.0 P20 - P24 1289.0 F AT 8.28.18 30 30 0 4:05 4:10 P P MA8.28.18 3:33 KM P-21 - P-24 22.0 W-AT - P23 1311.0 F AT 8.28.18 30 30 0 3:40 3:45 P P MA8.28.18 3:48 KM P-23 - P-24 23.0 N-AT - P-21 1334.0 F AT 8.28.18 30 30 0 4:05 4:10 P P MA

LocationFrom - To

AccumLength

(ft)

TesterInitials

Pressure Time

PRODUCTION SEAM NON-DESTRUCTIVE TESTINGDestruct

No.Date Time SeamerInitials

SeamNumber

AirTestP/F

VacBoxP/F

QAID

Length(ft)

Location: Fulton, AR ESI

Project Name: Turk Leachate Pond Tony BardellaAddress John W. Turk Power Plant Tony Bardella

Client Name: American Electric Power 35177117Contractor: ESI Matt Acree

LOCATION AND DISTANCE

Page 31: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

Geomembrane Seaming and Non-Destructive Test SummaryProject Number: 25809 Interstate 30 South

CQA Monitor: Bryant, AR 72022Reviewed By: Phone: 501.847.9292Approved By: Fax: 501.847.9210

Liner Installer:

Machine No.

WeldTypeFusion/ Date

Extrusion Start End +/- Start End

LocationFrom - To

AccumLength

(ft)

TesterInitials

Pressure Time

PRODUCTION SEAM NON-DESTRUCTIVE TESTINGDestruct

No.Date Time SeamerInitials

SeamNumber

AirTestP/F

VacBoxP/F

QAID

Length(ft)

Location: Fulton, AR ESI

Project Name: Turk Leachate Pond Tony BardellaAddress John W. Turk Power Plant Tony Bardella

Client Name: American Electric Power 35177117Contractor: ESI Matt Acree

LOCATION AND DISTANCE

8.28.18 3:20 BS P-22 - P-23 83.0 N-AT - Toe 1417.0 F AT 8.28.18 30 30 0 3:50 3:55 P P MA8.28.18 7:52 KM P-2 - P-22 73.0 N-AT - Toe 1490.0 F AT 8.28.18 30 30 0 3:50 3:55 P P MA8.28.18 8:30 KM P-5 - P-6 32.0 W-AT - P4 1522.0 F AT 8.28.18 30 30 0 8:52 8:57 P P MA8.28.18 7:55 KM P-3 - Exis 70.0 S-AT - Toe 1592.0 E JR - - - - - - - P MA8.28.18 9:10 KM P-3 - P-6 24.0 P4 - Toe 1616.0 E JR - - - - - - - P MA

Page 32: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

APPENDIX E

PHOTO LOG

Page 33: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

1. Excavation and transport of toe material to south berm.

2. Boral excavating the toe of the west side liner system.

Page 34: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

3. ESI contractors repairing primary liner on the west slope.

4. First deployed section of rub sheet at northeast corner.

Page 35: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

5. Deployed section of the rub sheet on the southeast corner.

6. ESI installers deploying and welding the last sections of rub sheet.

Page 36: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

7. Let-down structures being excavated on the south slope.

8. Dozer spreading material on south berm to flatten slope.

Page 37: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

9. Letdown structure with geotextile was installed prior to gravel placement.

10. Letdown structure on southeast corner of the Leachate Collection Pond.

Page 38: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

11. Completed south slope prior to seeding.

12. West side rub sheet anchor trench.

Page 39: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

13. Completed west slope with rub sheet.

14. View of completed south slope after vegetated.

Page 40: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502

APPENDIX F

DRAWING DETAILS

Page 41: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502
Page 42: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502
Page 43: Microsoft Outlook - Memo Style · oker, Cristin ason R Johns ory D Witte ect: Turk lea, ttached repo Wehling [ma, December 0 a on; Greg Car chate pond C rt. TERENCE TEWEHLING 502