Page 1: FAA System-Wide Modeling

Presented to: GMU System-Wide Modeling Workshop

By: Joseph Post, ATO NextGen & Ops Planning

Date: 10 December 2008

Federal AviationAdministrationFAA System-Wide

Modeling

Uses and Shortfalls

Page 2: FAA System-Wide Modeling

Federal AviationAdministration

2FAA System-Wide Modeling10 December 2008

• Uses of System-Wide Models• NextGen Overview• Modeling Shortcomings

– ATM Domain• Airport• Terminal• En Route• Oceanic• Flow Control• Airline Operations Center (AOC)

– Model Use

Overview

If we can’t model the current system, how can we model

this thing?

NextGen

Page 3: FAA System-Wide Modeling

Federal AviationAdministration

3FAA System-Wide Modeling10 December 2008

NAS Strategy Simulator

AwSim/AERALIB

NASPACATO

Modeling

SuiteSIMMOD

RDSIM/ADSIM

Page 4: FAA System-Wide Modeling

Federal AviationAdministration

4FAA System-Wide Modeling10 December 2008

Uses of System-Wide Models

Performance Assessment

Requirements AnalysisCost-Benefit Analysis

Development

Page 5: FAA System-Wide Modeling

Federal AviationAdministration

5FAA System-Wide Modeling10 December 2008

Uses of System-Wide Models (cont.)

• Portfolio optimization

The Challenge: To select an optimum portfolio of aviation investments so as to maximize the overall economic return, subject to a budget constraint.

,,, 2 XEnvGovoducerrPConsumer NOCOnoiseCCSSPVW

ConsumerSurplus

ProducerSurplus Government

Costs

EnvironmentalCosts

Page 6: FAA System-Wide Modeling

Federal AviationAdministration

6FAA System-Wide Modeling10 December 2008

Uses of System-Wide Models (cont.)

System-wide performance assessment

Model

System

Target

Performance

-

Expectations

Demand

“The Performance

Loop”

Page 7: FAA System-Wide Modeling

Federal AviationAdministration

7FAA System-Wide Modeling10 December 2008

NextGen Implementation Plan

43 Mid-Term Capabilities

Air TrafficOperations

AirportDevelopment

Aircraft &Operator

Requirements

NextGen

FY 09 10 11 12 13 14 15 16 17 18 19

Capital ProgramsADS-B ERAMSWIM TFM-MDataComm TMANNEW WAASNAS Voice Switch LAAS

AircraftRoadmap

7 Solution SetsIncrease collaborative ATMIncrease flexibility in the terminal environmentIncrease arrivals/departures at high-density airportsInitiate trajectory-based operationsReduce weather impactsImprove safety, security, and environmental performanceTransform facilities

2 Solution Sets35 OEP airports15 metropolitan areas

Page 8: FAA System-Wide Modeling

Federal AviationAdministration

8FAA System-Wide Modeling10 December 2008

TBOInitiate Trajectory Based Operations

Page 9: FAA System-Wide Modeling

Federal AviationAdministration

9FAA System-Wide Modeling10 December 2008

HiDensity Solution SetIncrease Arrival/Departures at High Density Airports

Page 10: FAA System-Wide Modeling

Federal AviationAdministration

10FAA System-Wide Modeling10 December 2008

Flex TerminalIncrease Flexibility in the Terminal Area

Page 11: FAA System-Wide Modeling

Federal AviationAdministration

11FAA System-Wide Modeling10 December 2008

Collaborative ATMImprove Collaborative ATM

Page 12: FAA System-Wide Modeling

Federal AviationAdministration

12FAA System-Wide Modeling10 December 2008

WeatherReduce Weather Impact

Page 13: FAA System-Wide Modeling

Federal AviationAdministration

13FAA System-Wide Modeling10 December 2008

Airport Modeling Shortfalls• Simplistic airport capacity

– Single airport configuration

• Convection weather– Airport closure

• Departure release• Surface congestion

– Taxiways– Gates– De-icing

• Tail number tracking– Delay propagation

• Passenger tracking– Connections

Coupled

Page 14: FAA System-Wide Modeling

Federal AviationAdministration

14FAA System-Wide Modeling10 December 2008

Terminal Modeling Shortfalls

• Simplistic terminal airspace– Airport coupling– Terminal capacity

• Aircraft trajectories– Route of flight– STARs– DPs

• Convection weather– Re-routing/arrival gate closure

Page 15: FAA System-Wide Modeling

Federal AviationAdministration

15FAA System-Wide Modeling10 December 2008

En Route Modeling Shortfalls

• Static sector capacity– Monitor Alert Parameter (MAP)

• Static sector definition• Response to sector overload

– Re-routing• Metering

– Time-based metering– Miles-In-Trail (MIT)

• Convective weather– Dynamic sector capacity– Tactical re-routes

• Continuous Descent Approaches (CDAs)/Tailored Arrivals

Page 16: FAA System-Wide Modeling

Federal AviationAdministration

16FAA System-Wide Modeling10 December 2008

Oceanic Modeling Shortfalls• Oceanic airspace!

Page 17: FAA System-Wide Modeling

Federal AviationAdministration

17FAA System-Wide Modeling10 December 2008

Flow Control Modeling Shortfalls

• Ground stops/ground delays– Airport constraints (GDPs)– Airspace constraints (AFPs)

• Strategic re-routes– Severe Weather Avoidance Program (SWAP)– Canadian Off-load

Page 18: FAA System-Wide Modeling

Federal AviationAdministration

18FAA System-Wide Modeling10 December 2008

AOC Modeling Shortfalls

• Cancellations• Ground Delay Program (GDP) response• Re-routes

Page 19: FAA System-Wide Modeling

Federal AviationAdministration

19FAA System-Wide Modeling10 December 2008

Model Use Shortfalls• Ease of Set-up• Monte Carlo replication

– Demand• Flight schedules• OD pairs• Equipment

– Aircraft performance– Routings– Capacities/airport configurations– TFM– etc.

• Visualization• Validation

Page 20: FAA System-Wide Modeling

Federal AviationAdministration

20FAA System-Wide Modeling10 December 2008

Questions?