PERT
-
7/25/2019 CE-401CE 4.0 PERT 2015
2/49
CPM vs. PERT
In 1957 the Critical Path Method (CPM) wasdeveloped as a network odel !or pro"ectana#eent.It is a deterinistic ethod that $ses a !i%edtie estiate !or each activit&.'hile CPM is eas& to $nderstand and $se butdoes not consider uncertainty in activity time
estiation.Uncertainty : weather, equipment failure,absenteeism can have a #reat ipact on thecopletion tie o! a cople% pro"ect.
-
7/25/2019 CE-401CE 4.0 PERT 2015
3/49
PERT
The Program Evaluation and ReviewTechnique(PERT) is a network odel thatallows !or randoness in activit&
copletion ties.enerall& $sed when there is a risk o! tieassociated with pro"ect.
R * + pro"ects where correct tiedeterinations cannot ,e ade.
E%aple - Pro"ect on la$nchin# the spacecra!t.
-
7/25/2019 CE-401CE 4.0 PERT 2015
4/49
PERT
PERT was developed in the late 195/s !orthe 0.. 2av&/s Polaris ,allistic issiles&ste pro"ect havin# tho$sands o!
contractors.This pro"ect was nota,le in that it !inished13 onths ahead o! sched$le and within
,$d#et.It has the potential to red$ce ,oth the tieand cost re4$ired to coplete a pro"ect.
-
7/25/2019 CE-401CE 4.0 PERT 2015
5/49
PERT
This ethod $ses statistical tools !orIplication o! $ncertainties on pro"ect tie
r
tochastic Modelin# o! 2etwork
6 distin#$ishin# !eat$re o! PERT is itsa,ilit& to deal with $ncertaint& in activit&
copletion ties.or each activit& the odel $s$all&incl$des three tie estiates-
-
7/25/2019 CE-401CE 4.0 PERT 2015
6/49
Three Tie Estiates
1
8
:5
8;5;18
:;7;1 hortest possi,le tie in which anactivit& can ,e copleted $nder ideal conditions.This is denoted ,& to
Pessimistic time; the lon#est tie that an activit&i#ht re4$ire. I! ever&thin# went wron# anda,noral sit$ation prevails.however it doesn/t?tincl$de hi#hl& $n$s$al catastrophies s$ch as
earth4$ake !loods !ires. It is denoted ,& tp
Most likely time(Most re4$ent;Mode); thecopletion tie havin# the hi#hest pro,a,ilit&.2oral condition prevails. It is denoted ,& t
=
-
7/25/2019 CE-401CE 4.0 PERT 2015
8/49
1
8
:5
8;5;18
:;7;1