1ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
ASTRONASTRON
EMBRACE Project statusEMBRACE Project statusG.W. Kant
2ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
EMBRACE conceptEMBRACE concept
‘analogue’ tiles
RF transport to central processing facility
50.000 antenna elements
3ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
Tile Baseline architectureTile Baseline architecture
4ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
Embrace is a development/production project, given the size and the time frame
Use currently available technology If possible enhance EMBRACE with DSX outputs
EMBRACEEMBRACE
5ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
Work Breakdown StructureWork Breakdown Structure
6ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
EMBRACE DS5 TasksEMBRACE DS5 Tasks
7ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
EMBRACE DS5 TasksEMBRACE DS5 Tasks
8ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
EMBRACE DS5 TasksEMBRACE DS5 Tasks
9ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
Original estimates
DS5 – Coordination (48mm/4fte) DS5 – T1 Design and development of (382mm/32fte) DS5 – T2 Production of EMBRACE (244mm/20fte) DS5 – T3 Test the EMBRACE systems (190mm/16fte)
EMBRACE DS5 TasksEMBRACE DS5 Tasks
10ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
EMBRACE DS5 TasksEMBRACE DS5 Tasks
Astron UK OPAR CSIRO U-CAM OMMIC / IRA
NRF(S.A)
Jive /MPIfR
Totals
DS5 48 48
DS5-T1 240 32 10 12 0 18/0 16 308(382)
DS5-T2 84 0 48 0 12/0 16 160(244)
DS5-T3 44 32 44 12 0/12 16 32/12 184 (190)
11ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
Discuss/define DS5 – T3 deliverables first at SKADS level T3 deliverables are now detailed to a sufficient level to
proceed T3 deliverables have to be enhanced further (parallel to
T1/T2 activities)
EMBRACE DS5 DeliverablesEMBRACE DS5 Deliverables
12ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005
The ENDThe END