1 ASTRON, the Netherlands GWK EMBRACE Zaandam february 2005 ASTRON ASTRON EMBRACE Project status EMBRACE Project status G.W. Kant

description

ASTRON. EMBRACE Project status G.W. Kant. EMBRACE concept. ‘analogue’ tiles RF transport to central processing facility 50.000 antenna elements. Tile Baseline architecture. EMBRACE. Embrace is a development/production project, given the size and the time frame - PowerPoint PPT Presentation

Transcript of ASTRON

Page 1: ASTRON

1ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

ASTRONASTRON

EMBRACE Project statusEMBRACE Project statusG.W. Kant

Page 2: ASTRON

2ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

EMBRACE conceptEMBRACE concept

‘analogue’ tiles

RF transport to central processing facility

50.000 antenna elements

Page 3: ASTRON

3ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

Tile Baseline architectureTile Baseline architecture

Page 4: ASTRON

4ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

Embrace is a development/production project, given the size and the time frame

Use currently available technology If possible enhance EMBRACE with DSX outputs

EMBRACEEMBRACE

Page 5: ASTRON

5ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

Work Breakdown StructureWork Breakdown Structure

Page 6: ASTRON

6ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

EMBRACE DS5 TasksEMBRACE DS5 Tasks

Page 7: ASTRON

7ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

EMBRACE DS5 TasksEMBRACE DS5 Tasks

Page 8: ASTRON

8ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

EMBRACE DS5 TasksEMBRACE DS5 Tasks

Page 9: ASTRON

9ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

Original estimates

DS5 – Coordination (48mm/4fte) DS5 – T1 Design and development of (382mm/32fte) DS5 – T2 Production of EMBRACE (244mm/20fte) DS5 – T3 Test the EMBRACE systems (190mm/16fte)

EMBRACE DS5 TasksEMBRACE DS5 Tasks

Page 10: ASTRON

10ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

EMBRACE DS5 TasksEMBRACE DS5 Tasks

Astron UK OPAR CSIRO U-CAM OMMIC / IRA

NRF(S.A)

Jive /MPIfR

Totals

DS5 48 48

DS5-T1 240 32 10 12 0 18/0 16 308(382)

DS5-T2 84 0 48 0 12/0 16 160(244)

DS5-T3 44 32 44 12 0/12 16 32/12 184 (190)

Page 11: ASTRON

11ASTRON, the NetherlandsGWK EMBRACE Zaandam february 2005

Discuss/define DS5 – T3 deliverables first at SKADS level T3 deliverables are now detailed to a sufficient level to

proceed T3 deliverables have to be enhanced further (parallel to

T1/T2 activities)