    Industrial Energy Management System:Electrical Process

    System configurationFunctionality AdvantEMS

    References

    Benefits

  • 7/27/2019 Adv Ems Show

    2/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 2

    Critical LoadsLimited In-plant Generation

    Insufficient reliability of Public Grid

    Why Energy Management System?

    Load Shedding}Several Generators

    Contracted Power Importation Power Control

    }Different Electrical Operational

    Configurations possibleMode Control}

    Complex Distribution Networks

    Local only Control facilitiesSCADA}

  • 7/27/2019 Adv Ems Show

    3/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 3

    AdvantEnergy Management System

    Plant Network

    Control Network (optical and/or electrical)

    MES or ERPServer

    Advant Station 515OS, IMS, ES

    AdvaCommandAdvaBuildAdvaInform

    Advant Station 520iOS, IMS, ES

    AdvaCommandAdvaBuildAdvaInform

    PersonalComputer

    X-terminal

    Fieldbus

    Advant Controller 400

    S800 I/O

    Substation W

    Advant Controller 400

    S100 I/O

    Substation X

    AdvantSafety System

    Advant Controller 400

    REF 500

    Substation Y

    A B B T r a n sm i t O yNe t wo r k P a r t n e r

    FEEDER TERMINAL REF541A B B N e t w o r k P a r t n e r

    Uaux = 80. .. 265Vdc/ ac

    f n =50H z

    I n= 1/ 5A ( I)

    1MR S xxxxxx

    98150U n= 100/ 110 V (U )

    Uon = 100/ 110 V (Uo)

    I on= 1/ 5 A( Io)

    9509

    A B B T r a n sm i t O yNe t wo r k P a r t n e r

    FEEDER TERMINAL REF541A B B N e t w o r k P a r t n e r

    Uaux =80. . .265Vdc/ ac

    fn =50H z

    In = 1/ 5 A( I)

    1MR Sxxxxxx

    98150U n =100/ 110V ( U )

    Uon =100/ 110 V( Uo)

    Ion =1/ 5A ( Io)

    9509

    AdvantProcess Control

    Advant Controller 400

    Substation Z

    INSUM

  • 7/27/2019 Adv Ems Show

    4/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 5

    Load Shedding

    Functionality AdvantEMS

    ?

    Without Load Shedding

    With Load Shedding

  • 7/27/2019 Adv Ems Show

    5/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 6

    ABBs starting-point for Load Shedding

    Secure electrical powerto critical loads

    Minimal disturbance toplant operation

    No spurious operation

    30MW20MW15MW

    G2G1

    M1 M2 M3 M4 M7M6M5

    9MW

    (5)

    6MW

    (3)

    1MW

    (3)

    20MW

    (1)

    10MW

    (2)

    7MW

    (4)

    12MW

    (5)

  • 7/27/2019 Adv Ems Show

    6/24

  • 7/27/2019 Adv Ems Show

    7/24ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 8

    AdvantEMS Load Shedding: Keywords

    Fast

    Exact

    Flexible

    Coordinated

    Deterministic

    Security and Reliability

    Accurate Event Logging

    Independent Back-up System

    Operator Guidance

  • 7/27/2019 Adv Ems Show

    8/24

  • 7/27/2019 Adv Ems Show

    9/24

  • 7/27/2019 Adv Ems Show

    10/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 11

    Functionality AdvantEMS

    Load Shedding

    Active and Reactive Power Control

    Minimum

    Excitation

    Rotor Instability Line

    Operating

    Minimum

    Turbine Maximum

    P

    Q-LagQ-Lead

    Maximum Excitation(Rotor Heating)

    MVA-circle

    (Stator Heating)

    Minimum

    PF-Leading

    Minimum

    PF-lagging

    Generator Capability Diagram

  • 7/27/2019 Adv Ems Show

    11/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 12

    Active and Reactive Power Control

    P

    Q-LagQ-Lead

    Active Power Sharing:

    Efficient power generation

    Power Import optimization

    Avoid component overloading

    Spinning reserve optimization

    Standby optimization

    Reactive power sharing:

    Achieve stable operation

    Power Factor optimization

  • 7/27/2019 Adv Ems Show

    12/24

    Overview of the control mode of the turbine/generator unit

    Overview of the control mode of the turbine

    Overview of the control mode of the generator

    Overview of the measurements and the setpoints

    Overview of the operation of the network

    Working point of the

    turbine and the generator

    10 Dynamic keys for

    operator control

    Setpoint to the turbine

    and the generator

  • 7/27/2019 Adv Ems Show

    13/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 14

    Functionality AdvantEMS

    Load Shedding

    Active and Reactive Power Control

    Mode Control

    for Generators

    for Turbines

    for Transformers

    for Switchboards

    Mode Control

  • 7/27/2019 Adv Ems Show

    14/24

  • 7/27/2019 Adv Ems Show

    15/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 16

    Functionality AdvantEMS

    Load Shedding Active and Reactive Power Control

    Mode Control

    Supervision, Control and Data Acquisition (SCADA)

    Supervision, Control and Data Acquisition

    Clearly Structured Presentation

    Controls - Select Before Execute

    Status Indications

    Consistency Analysis

    Time Tagged Events (1 ms resolution) Alarmhandling, Reports, Trends

    Supervision and Self Diagnostics

    Single Window concept

  • 7/27/2019 Adv Ems Show

    16/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 17

    Integration with subordinated systems

    Satellite Time Receiver (GPS)

    Alarm annunciators

    SF-6 Density Monitoring Units

    Motor Control Centers

    Battery Chargers Meteorological Stations

    Diesel Generators

    Generator- and turbine controller

    Protection and Control Units

  • 7/27/2019 Adv Ems Show

    17/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 18

    A B B T r a n s m i t O y

    N e t w o r k P a r t n e r

    FEEDER TERMINAL REF541A B B N e t w o r k P a r t n e r

    Uaux = 80...265Vdc/ac

    f n =50Hz

    In = 1/5 A (I)

    1MRS xxxxxx

    98150Un = 100/110 V (U)

    Uon = 100/110 V (Uo)

    Ion = 1/5 A (Io)

    9509

    CB SPRING READY

    CB TRUCK OUT

    TEMPERATURE HIGH

    SF 6 GAS DENSITY

    LOADSHEDDED

    Measured Values

    IL1 Amps 800IL2 Amps 803IL3 Amps 801Io 0Iob 0U12 kV 20U23 kV 20U31 kV 20U1 kV 11.5U2 kV 11.5U3 kV 11.5Uo - Volts 0

    Use Up and Down to scroll view

    Events

    NOC3Low: E399-07-06 18:34:23:230

    NOC3Low: E299-07-06 14:25:52:720

    CB-HCU2: Opened99-07-06 14:02:48:430

    Use C-button to clear Events

    Integrated Protection & Control Units

    Protection

    Measuring of U,I,E, calculation of P& Q

    Monitoring & Control

    Interlockings

    Alarm annunciation

    Event Time Tagging

    Disturbance Recording

    Local storage of trip-events

    Serial communication to Advant EMS

  • 7/27/2019 Adv Ems Show

    18/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 19

    Integration with supervisory systems

    Plant Information Systems - MIS

    Regional Dispatch Centers

    Power Generation Coordination Centers

    Energy Trading

    Utility Management Systems Process DCS

  • 7/27/2019 Adv Ems Show

    19/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 20

    Functionality AdvantEMS

    Load Shedding Active and Reactive Power Control

    Mode Control

    Supervision, Control and Data Acquisition (SCADA)

    Reacceleration

    Reacceleration

    Triggered by Load Shedding or Undervoltage

    Individual motors

    Priority per motor

    Max. allowed time delay per motor

    Network configuration check Network restoration

  • 7/27/2019 Adv Ems Show

    20/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 21

    Functionality AdvantEMS

    Load Shedding Active and Reactive Power Control

    Mode Control

    Supervision, Control and Data Acquisition (SCADA)

    Reacceleration

    Synchronization

    Synchronization

    Automatic Synchronization after boiler trip

    Automatic Synchronization initiated by operator

    Semi Automatic Synchronization

    Manual Synchronization

  • 7/27/2019 Adv Ems Show

    21/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 22

  • 7/27/2019 Adv Ems Show

    22/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 23

    AdvantEMS Type Circuits

    Circuitbreaker Control

    Transformer Control

    Motor Control

    Generator Control

    Active Power Control Reactive Power Control

    Load Shedding

    Reaccelaration

    Network Configuration Determination

  • 7/27/2019 Adv Ems Show

    23/24

    ABB Advant

    Energy Management SystemsNLSYS/YAV-I/, ADV-EMS/ 24

    References

    HAR, refinery in Greece

    Shell Pernis refinery in the Netherlands

    Shell BLNG in Brunei

    Hoogovens, steel-industry in the Netherlands

    ThaiOil, ThaiLube, RRC refineries in Thailand

    La Roche, CHP in UK

    Petrobras: REPAR, REDUC, RLAM refineries in Brazil

    Reliance: Hazira & Jamnagar refineries in India

    Omar, refinery in Syria

  • 7/27/2019 Adv Ems Show

    24/24

    Avoid Black-outsAchieve Stable Operations

    Energy cost savings

    Minimal operator requirementsOptimized network design

    Minimise cabling and engineering

    Single window for all plant data

    Maintenance support

    Ensure high availability and reliability

    And thus ABB AdvantEMS helps you to: