General Style – Voice & Mood

The 2007 Specifications are written in the active voice andimperative mood for instructions to the Contractor.

Traditional style was in passive voice:Concrete shall be thoroughly consolidated against the faces of all  forms and joints, including concrete in a previously constructed lane of pavement, by means of vibrators inserted in the concrete.

New style – all commands are written to the Contractor:

Consolidate concrete against all form faces, joints, and previously constructed pavement using insertion type vibrators.

Page 3: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 3/229

General Style – Voice & Mood

Where action or responsibility is for the Department,the specification will be written in the active voice andwill specifically name the Department.

Within 20 days, the Department will notify the Contractor if  revisions to the foundation lengths and installation procedureswill be made based on the results of the load tests.

Statement’s of fact are written using the indicativemood.

The Project Limits are shown on the key sheet.

Page 4: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 4/229

2007 Table of Contents

Division 100 – General Provisions

Division 150 – Contract Requirements Division 200 – Earthwork Division 300 – Subbase & Base Courses

Division 400 – Pavements Division 450 – Pavement Rehabilitation Division 500 – Bridges and Structures

Division 550 – Structure Rehabilitation Division 600 – Miscellaneous Construction

Division 650 – Utilities Division 700 – Electrical Division 800 – Landscaping Division 900 – Materials

Division 1000 – Equipment

Page 5: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 5/229

General Style – Format

Standard four part format for Div 200 to 800

###.01 Description

###.02 Materials & Equipment

###.03 Construction

###.04 Measurement & Payment

Page 6: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 6/229

General Style – Scope of Work

109.02 – The Department will make payment for the

elements of work described under the “Construction” or

“Procedure” subsection under the corresponding Item in

the “Measurement and Payment” Subsection.

The Department will not make additional or separate

payment for work or portion of work unless specifically

provided for in the “Method and Measurement”

Subsection.

Page 7: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 7/229

Division 100

101 General Information

102 Bidding Requirements and Conditions

103 Award and Execution

104 Scope of Work

105 Control of Work

106 Control of Material

107 Legal Relations 108 Prosecution and Completion

109 Measurement and Payment

Page 8: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 8/229

Section 101.03 Terms

If the term is capitalized, it is capitalized in the Specifications

• Change Order – term replaces “Construction Order” in keepingwith common usage.

• Contract – includes permits, boring logs, pavement core records

•  Extra Work - New Work and quantity adjustments to Items that are not the result of as-built measurement or calculation.

•  New Work - work directed by the Department that is not covered under an existing Item or combination of Items in the Contract.

• Field Order - Written direction, signed by the RE, requiringaction by the Contractor.

•  ME – Materials Engineer 

•  RE –replaces Resident Engineer 

Page 9: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 9/229

Section 102 BiddingRequirements

Electronic Bidding part of StandardSpecifications

Page 10: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 10/229

Section 103.05 Escrow of BidDocuments

Escrow of bid documents by Contractor is optional.However, escrow is required to pursue certain costsunder 104.03.

Information in bid documents does not modify theContract.

custody agreement provided by the Department

The Department may access the escrowed biddocuments with the Contractor’s writtenauthorization

Page 11: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 11/229

Section 104.02 Value Engineering

• The Department will not consider anticipated costsavings based on revisions to utility relocations or other work to be performed by Others.

• The Contractor is responsible to obtain theconcurrence of Utilities, property owners, governingbodies, and agencies for any work affected by theVE proposal.

• The Department has the right to reject VE proposalsthat may increase the time or cost of work done byOthers.

Page 12: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 12/229

Section 104.02 Value Engineering(Continued)

The Department will not use the value of costsavings for road user costs, or for the Department’sconstruction engineering costs.

Payment includes all costs for the VE includingunanticipated quantity increases or unanticipatedwork arising out of the VE.

Page 13: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 13/229

Section 104.03 Change Orders

Protests to Change Orders - A protest is not a substitute for notice as specified in 104.03.04.

A protest is notice that the terms and conditions for proposedwork are not in accordance with the Contract, quantity

adjustments are incorrect, or that the modification for ContractTime is incorrect. For Change Orders that require the Contractor’s assent

(Supplementary Agreements), if the Department processes theChange Order within 15 days of receiving the Contractor’s

signature, the Contractor is barred from protesting the approvedChange Order.

If the Contractor does not protest the order – with a specificreason, it can not be the basis of a claim.

Page 14: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 14/229

Section 104.03.03 Changes

Quantity Increases/Decreases –

Bid prices hold only for increases and decreases thatare within 25% of proposal quantity. Outside that,

prices may be renegotiated.

“Proposal quantity” does not include quantitiesdesignated on the Plans as “if and where directed.”

For minor changes (those ≤ 25%)

payment is made at the bid price.

Page 15: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 15/229

Section 104.03.03 Changes

For major increases (those >25% )

Either the Dept or the Contractor may request torenegotiate the price for the quantity in excess of 

125% of the Proposal Qty.

For items measured by the unit – we won’t negotiatea fraction of the unit.

If price can not be mutually agreed upon – pricedetermined by Force Account.

Page 16: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 16/229

Section 104.03.03 Changes

EXAMPLE #1:Proposal calls for 1,000 LF of curb and 200 LF were designated as 

IWD. A COP increases the item by 500 LF.

Proposal Qty = 1,000 – 200 = 800 LF

First 25%, 200 LF, performed at bid priceExcess >125%, 300 LF, performed at re-negotiated price.

Page 17: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 17/229

Section 104.03.03 Changes

EXAMPLE #2:Proposal calls for 5 Units of Inlets, Type B. A COP increases the item by 2 Units.

The first unit is < 25% and is performed at bid price.

For the second unit, since it exceeds 25%, the entire second unit is eligible for renegotiation.

Page 18: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 18/229

Section 104.03.03 Changes

For major decreases (those >25% )

Either the Dept or the Contractor may request torenegotiate the price for the quantity of work

performed.

If price can not be mutually agreed upon – pricedetermined by Force Account.

However, the Department won’t pay an amount of more than 75 percent of the original value of the item(bid price multiplied by the Proposal quantity)

Page 19: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 19/229

Section 104.03.03 Changes

The Department will consider costs attributed to theitem – which are allocations for work for which noItem is provided in the Contract if the Contractor has

escrowed its bid documents as specified in 103.05. The Department will not make payment for lost

anticipated profits.

Page 20: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 20/229

Section 104.03.03 Changes

If the cost difference for the renegotiated qty is less

than $5,000 - payment will be made at the bid price.

Page 21: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 21/229

Section 104.03.03 Changes

EXAMPLE #3:Proposal calls for 5,000 CY of DGABC at $10/CY. A COP 

decreases the item by 3,000 LF.

The remaining 2,000 CY is eligible for renegotiation. However,the total cost can not exceed 75% x 5,000 x $10 = $37,500 (or $18.75/CY)

Page 22: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 22/229

Section 104.03.03 Changes

If a major change results in a renegotiated price, the RE willdetermine the locations of which work is to be performed at therenegotiated price and which locations of work is performed atthe bid price.

Subsequent increases in quantities are performed at therenegotiated price. However if subsequent increases exceed25% of the Proposal Qty and 25% of the adjusted qty, theprices may be re-renegotiated.

When the locations of the work to be performed at arenegotiated price are established, subsequent decreases inquantities of work at the bid price will not affect the quantity of work at the renegotiated price.

Page 23: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 23/229

Section 104.03.03 Changes

EXAMPLE #4:The Proposal calls for 800 LF of Beam Guide Rail. A COP increases the quantity 450 LF to 1,250 LF.

200 LF of the increases is paid at the bid price, $ PB1 and 250 LF is paid at a renegotiated price $P R1.

A subsequent COP further increases the quantity 300 LF to 1,550 LF.

200 LF is paid at the renegotiated price $ PR1, , and 100 LF would be eligible for a second renegotiated price $ PR2 Because it exceeds 25% of the Proposal (300 > 25% x 800= 200) and 25% of the quantity at the established price for $ PB1 (300 > 25% x 250).

Page 24: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 24/229

Section 104.03.03 Changes

EXAMPLE #5:The Proposal calls for 800 LF of Beam Guide Rail. A COP increases the quantity 450 LF to 1,250 LF.

200 LF of the increases is paid at the bid price, $ PB1.and 250 LF is paid at a renegotiated price $P R.. The Change Order will note the location(s) for the quantity being paid at $ PR.

If a subsequent COP decreases the item by 300 LF. The quantitydesignated to be paid at $ PR1 is not effected even thought the overall qtyis now less than 125% of the Proposal. It is still paid at the renegotiatedprice. The quantity is only effected if the COP specifically decreases.

Page 25: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 25/229

Section 104.03.03 Changes

For Deleted work – If the Contractor orderedmaterials before notification of the decrease, theDepartment will make payment for material costs or 

restocking costs. Material must be acceptable to be eligible (approved

source and meets materials requirements).

Does not apply to quantities listed as IWD.

No profit applied to cost

Total payment may not exceed the bid pricemultiplied by the deleted quantity.

Page 26: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 26/229

Section 104.03.03 Changes

When the entire quantity of an item isdesignated as IWD:

Quantity increases must be more then 100%of Proposal to be eligible for renegotiation of the price.

Quantity decreases – quantity will be paid atbid price. Not eligible for renegotiation.

Page 27: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 27/229

Section 104.03.03 Changes

Changes in the character of work

Efficiencies or inefficiencies resulting from minor increases or decreases in quantities of work are nota change in the character of work.

Modification (+/-) is made for the difference betweenwhat the actual cost to perform the work of the Item

or portion thereof involved would have been if therewere no change

Page 28: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 28/229

Section 104.03.03 Changes

Differing Site Conditions - replaces old 108.09Unusual Site Conditions

Follows federal claims language for Type 1 and Type

2 Differing Site Conditions

Type 1 is when a subsurface or latent conditiondiffers from that specified in the Contract.

Type 2 is when unusable conditions are encounteredthat differ from those ordinarily encountered/inherent in the work.

Page 29: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 29/229

Section 104.03.03 Changes

Differing Site Condition claims must meet thresholdto qualify for payment:

 – Contracts ≤$2M > $5,000

 – Contracts >$2M > $25,000

Threshold is not a deductible. Department will payfor entire amount due if met.

the Department will consider the cumulative totalvalue for the same condition encountered multipletimes on a project as meeting the requirements.

Page 30: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 30/229

Section 104.03.03 Changes

Constructive Acceleration

Excusable – compensable delay which theDepartment improperly rejected notice requesting an

extension of time. (Must have an approvedprogress schedule.)

Payment may not exceed the cost of liquidated

damages saved. Must submit acceleration plan to the RE.

Page 31: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 31/229

Section 104.03.03 Changes

Inefficiencies

If the source of the loss of productivity cannot beisolated and priced separately, the Department will

consider making payment based on a Measured Mileanalysis.

Page 32: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 32/229

Section 104.03.03 Changes

Delays

Time adjusted as specified in 108.11

Delay damages as specified in 104.03.09

Page 33: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 33/229

Section 104.03.04 Notice

Immediately provide written notice whencircumstances are believed to be a change to theContract.

If notice is not provided on a DC-161, it mustcontain:1. A statement that this is a notice of a change.

2. The date when the circumstances were discovered.

3. A detailed and specific statement describing the nature andcircumstances of the change.

4. If the change will or could affect costs to the Department.

5. If the change will or could affect Contract Time

Page 34: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 34/229

Section 104.03.04 Notice

The Department will not make payment for 

costs incurred prior to providing the REnotice.

Page 35: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 35/229

Section 104.03.05 UnrecoverableCosts

Loss of anticipated profits Consequential damages

Expense related to claim preparation and

submission, attorney’s fees and litigation expenses Interest

Reimbursement for home office overhead in excess

of that provided by the Contract

Page 36: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 36/229

Section 104.03.06 UnacceptableCalculations

Total Cost Method - Method based on calculatingcosts as the difference between the Contractor’s bidfor the Work from the Contractor’s calculation of 

costs for the Work. Modified Total Cost Method

Productivity Factors

Eichleay Formula

Page 37: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 37/229

Section 104.03.07 Tracking Costs

On a daily basis, submit for review by the RE a dailywork report for the work involved in the force account

or claim

Page 38: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 38/229

Section 104.03.08 Force Account

Indirect Labor Costs - FICA, Workers Comp, Federal andState unemployment insurance and other payroll taxes paid ondirect labor costs

Extraordinary Expenses -permit and disposal fees, if 

approved before incurring the cost and evidenced by paidinvoices Equipment –

 – paid at 80% of Blue Book rate

 – for any 30-day period, limit the total amount paid to amaximum of 80% of the monthly rate – operating cost paid only when equipment is active – Idle time limited to 8 hours/day, and 176 hrs/30 day period

Page 39: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 39/229

Section 104.03.08 Force Account

Overhead - allowance is full compensation for theContractor’s field and home office overhead

Subcontractors – 5% markup on total subcontractor cost. However may not exceed $5,000.

Page 40: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 40/229

Section 104.03.09 Delay Damages

Non-productive Activity – Labor/forepersons that must remain on site for the

period of the delay

 – Labor for maintenance within the Project Limits,maintenance of traffic control devices,maintenance of SESC measures, and similar 

activities resulting from the delay

Page 41: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 41/229

Section 104.03.09 Delay Damages

Contractor field office – if the extension of time is for more than one

month, the Department will make payment for the

costs to maintain the Contractor’s field office, asevidenced by paid invoices

No Profit on damage costs

Overhead – 15% applied to direct labor and benefits.Full payment for field and home office overhead andgeneral superintendence.

Page 42: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 42/229

Section 104.03.09 Delay Damages

Labor Escalation As the result of the delay, an activity, which had a

planned late-finish date occurring before a labor rate

increase date, is required to start after the labor rateincrease date

The Department will pay for the resulting costdifference (direct labor, benefits, indirect costs)

Profit – 10% on direct labor and benefits

Overhead – no additional overhead

Page 43: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 43/229

Section 104.03.09 Delay Damages

Material Escalation If the delay forces the Contractor to purchase material when

material costs are higher than the cost of material would havebeen for the planned late-finish dates

or if the Contractor incurs additional storage costs as a result of the delay

The Department will pay for the resulting cost difference

Department will not make payment for quantities in excess of 

the amount necessary for construction, except where lesser quantities cannot be economically purchased and the excesshas no significant reuse value

Profit and Overhead applied

Page 44: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 44/229

Section 104.03.09 Delay Damages

From the total value of delay damages, when theTotal Adjusted Contract Price cost is greater than theTotal Contract Price, the Department will deduct the

amount of 10 percent applied to the differencebetween the Total Adjusted Contract Price and theTotal Contract Price

If this deduction is greater than the total value of delay damages, the Department is not due a credit

Page 45: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 45/229

Section 105.01 RE

Assign every correspondence/RFI/Change Notice (claim) sentto the Department a unique correspondence serial number 

The RE will decide questions that arise concerning thefollowing:

1. Quality and acceptability of the work.2. Progress of the Work.

3. Interpretation of the Contract.

4. Modifications to the Contract.

5. The percentage for partial payments made in Estimates,as specified in 109.05.

Page 46: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 46/229

Section 105.01 RE

The RE has the authority to suspend the Work wholly or in partand to suspend Estimates – for failure of the Contractor to correct conditions unsafe for the

workers or the general public, – for failure to carry out provisions of the Contract, – or for failure to comply with RE direction.

The RE also has the authority to suspend the Work wholly or inpart for  – unsuitable weather,

 – for conditions considered unsuitable for the prosecution of thework, – or for any other condition or reason deemed to be in the interest of 

the public.

Page 47: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 47/229

Section 105.02 Inspection

Provide safe access for inspection to all parts of theWork. Provide the necessary assistance, includingbut not limited to traffic control, lighting, andscaffolding in order to allow a complete and detailedinspection.

Provisions for un-inspected work

Neither the observations of the RE in the

administration of the Contract, nor inspections, tests,or approvals relieve the Contractor from its obligationto perform the Work in accordance with the Contract.

Page 48: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 48/229

Section 105.05 WorkingDrawings

Table is provided for which drawings are certified and which aresubmitted for approval

Not permitted to change the Contract by submission of aworking drawing

The Department’s certification or approval of working drawingssignifies only that the drawings are in general conformance withthe Contract. It does not relieve the Contractor fromresponsibility for errors and omissions and their correction

Do not deviate from the approved, certified, or conditionallycertified working drawings without obtaining prior writtenapproval from the RE.

Page 49: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 49/229

Section 105.07 Utilities

Contractor required to send all Utilities within theproject limits an initial notice when beginningconstruction operations.

Contractor required to provide protection of Utilityfacilities as required by Utility

Work by Utilities – the contractor is responsible for 

providing the Utility with advance notice as requiredin Special Provisions and for coordinating the workperformed by the Utilities.

Page 50: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 50/229

Section 105.08 EnvironmentalProtection

Do not use treated timber products inshellfish areas and other environmentallysensitive.

Before using treated timber products in areasother than those specified in the Contract,

obtain the Department's approval.

Page 51: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 51/229

Section 105.09 LoadRestrictions

If the RE finds that trucks are in violation of the legal weight limits, the RE has the right toreject that load of material. The RE has theright to suspend the Work for repeatedviolations until the condition is corrected

Page 52: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 52/229

Section 106.01 Source of Supply

When required by the Contract, use onlyproducts and suppliers listed on the QPL.

Material Questionnaire required for allmaterials (QPL is not a substitute for approval).

Page 53: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 53/229

Section 106.05 MaterialsInspections

Submit to the RE a request for HMA plant and fieldinspection, concrete plant and field inspection, andin-place testing for soil aggregate by 1:00 p.m. of the

day before the requested inspection If the start time for a material delivery is delayed by

more than 2 hours, the Department has the right to

cancel the request, and require the Contractor tosubmit a new request.

Page 54: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 54/229

Section 106.09 Proprietary Items

If material or equipment is specified in theContract by using the name of a proprietaryitem or the name of a particular supplier, theContractor may propose a substitute exceptwhen the Special Provisions state that nosubstitution is permitted

Page 55: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 55/229

Section 107.01.02 PermitsLicenses

The Department will recover from the Contractor,fines levied against the Department that arise out of the Contractor’s non-compliance.

Page 56: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 56/229

Section 108.01 Subcontracting

Requirement for subcontractor prequalification withNJDOT procurement eliminated.

Technical qualifications can still be identified with the

Special Provisions

Page 57: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 57/229

Section 108.02 Commencement ofWork

Before starting construction operations, submit  – Insurance 

 – Superintendent, Environmental manager, Traffic Control Coordinator, Safety Officer 

 – Safety Program 

 – Progress Schedule 

21 day notice prior to starting construction operations 

When a Construction Activity Stormwater General Permit (NJG0088323) is specified, the Contractor may not perform 

land disturbance activities until 35 days after the submission of the Request for Authorization Form to the Department 

S i 08 03 D il

Page 58: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 58/229

Section 108.03 DailyCommunication

Every week, provide a schedule of proposed work – Include work items/locations/hours to be worked

Confirm proposed work at the beginning of each day

Don’t perform work without providing notice

72 hour notice before changing work shifts or returning to work after a shutdown >72 hours

S ti 108 06 Ni ht

Page 59: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 59/229

Section 108.06 NightOperations

Some general sections of old Section 617 moved toSection 108

Table of required illuminance – changes: – Milling/paving changed from 5 fc to 10 fc but area

changed from +/-200 ft to +/-25 ft (+ 10 ft on sides)

 – HMA roller changed from 5 fc to 10 fc, but area changedfrom +/-100 ft to +/-25 ft (+10 ft on sides)

 – Traffic Control added 5 fc for lighting on task

 – Traffic Director added 5 fc for +/-25 ft

Workers must wear a safety vest meeting ANSI/ISEAClass 3, Level 2 standards

Page 60: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 60/229

Section 108.07.01 Interference

The RE has the right to reject or rescind approval of lane or shoulder closures because of the following:

1. Weather conditions.

2. The closure is unnecessary to perform the work.3. Emergency conditions either on or off the Project that result inan unacceptable impact to the traveling public.

The Department will only make payment for delays

or costs arising from the RE’s rejecting or rescindingof lane or shoulder closure resulting from emergencyconditions.

S ti 108 08 L O

Page 61: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 61/229

Section 108.08 Lane OccupancyCharges

The Department will waive the charge where a laneor lanes are not re-opened solely because of extraordinary circumstances not under the control of or reasonably foreseeable by the Contractor.

Equipment breakdowns, supplier deliveries, andweather related hindrances are not extraordinary,circumstances.

However, the Department has the right to assess acharge for any period of time that a lane or lanes areclosed beyond the reasonable period of time neededto open the lane closed due to an extraordinarycircumstance.

Section 108 09 Maintenance ithin

Page 62: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 62/229

Section 108.09 Maintenance withinProject Limits

Project Limits (area) defined in 101.03  Contractor’s maintenance responsibilities for Project Limits:

Picking up and disposing of trash and debris

Keeping the roadway clear of dust, soil

Maintaining a safe and unobstructed passageway through theconstruction area including escape ramps at the edges of pavement.

Maintaining surface drainage

Removal of ice and snow from bridge sidewalks open to pedestrianaccess.

Provide for maintenance and repairs beyond the Project Limitsfor reasonable continuance to restore the required functionaloperation of systems that are impacted within the Project Limitssuch as drainage and electrical

Section 108 11 Modifications to

Page 63: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 63/229

Section 108.11 Modifications toContract Time

Department will only grant an extension of time for an excusable delay

 – delays work on the critical path beyond the

Contract Time

 – using the approved progress schedule that iscurrent at the time the delay occurred

Section 108 11 Modifications to

Page 64: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 64/229

Section 108.11 Modifications toContract Time

Extensions of time or delay damages won’tbe made unless progress schedule andupdates are current

Section 108 11 Modifications to

Page 65: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 65/229

Section 108.11 Modifications toContract Time

Types of delays non-excusable

Excusable, non-compensable – Utility delays

 – Extreme weather  – Cataclysms

 – Sovereign acts of the State

 – War 

 – Labor disputes – Material shortages

Excusable, compensable

Concurrent delays

Section 108 11 Modifications to

Page 66: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 66/229

Section 108.11 Modifications toContract Time

Utility delays: when the actual duration to completethe utility work is more than 30 percent greater thanthe estimated duration specified in 105.07.02. Theduration includes both the advance notice and the

completion of the work by the Utility Extreme weather: if work on the controlling activity 

on the critical path is delayed due to weather and thecumulative delay due to weather each month

exceeds the number of days specified in Table108.11.01-1 . Must submit daily documentation tothe RE as it occurs.

Section 108 11 Modifications to

Page 67: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 67/229

Section 108.11 Modifications toContract Time

If excusable noncompensable delays exceed 180days, the time in excess of 180 days will beexcusable, compensable.

Concurrent Delays – When an excusable, non-compensable delay is concurrent

with an excusable, compensable delay, the Department willgrant an extension of Contract Time but will not makepayment for delay damages.

 – When a non-excusable delay is concurrent with anexcusable delay, the Department will not grant an extensionof Contract Time or make payment for delay damages.

Section 108 11 Modifications to

Page 68: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 68/229

Section 108.11 Modifications toContract Time

Time Impact Evaluation – requirementsmoved to 108.11

Section 108 12 Right of Way

Page 69: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 69/229

Section 108.12 Right of WayRestrictions

Time limitations will be noted for temporaryeasements. Schedule the Work to accommodatethe time limitations

If the Contractor needs to occupy a temporaryeasement beyond the time period provided provide awritten request to the RE at least 15 days before the

time period expires. Do not enter or continue tooccupy the easement or parcel unless approved bythe RE.

Section 108 17 Interim

Page 70: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 70/229

Section 108.17 InterimCompletion

When Special Provisions provide an interimcompletion milestone – notify the RE uponcompletion.

Section 109 01 Measurement and

Page 71: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 71/229

Section 109.01 Measurement andPayment

Measured Items vs. Proposal Items. The Department willdesignate Items as Measured Items or as Proposal Items byhaving a suffix of P or M in the Item number.

The Department will not measure quantities for Proposal Items,except quantities designated on the Plans as “if and where

directed,” for payment. The Department will measure quantities for Proposal Items that

are designated on the plans as “if and where directed” for payment when the RE directs work using the “if and wheredirected” quantity.

When the Department, at the request of the Contractor,measures a quantity of a Proposal Item, and the differencebetween the quantity measured and the Contract quantity is ≤

10 % of the Proposal quantity, the Department will deduct $500.

Section 109.01 Measurement and

Page 72: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 72/229

Section 109.01 Measurement andPayment

For measured quantities, the Department willmeasure to the significant figure as specified inTable 109.01-1

<$50 nearest whole unit

Between $50 and $500 nearest 1/10 unit

>$500 nearest 1/100 unit

Page 73: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 73/229

Section 109.03 Force Account

Force Account cost summary submitted toRE in an electronic format provided by theDepartment

Certification stating “All costs submitted have been incurred as a result of the force 

account, and all vendor invoices have been paid.” 

Page 74: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 74/229

Section 109.05 Estimates

Minimum value needed for an estimate to beprocessed raised to $5,000

Receipt of certification of payment tosubcontractors (DL-72) initiates 20-dayapproval period under N.J.S.A. 2A:30A-1.

The Department will not accept thecertification before being requested by theRE.

Page 75: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 75/229

Division 150 Contract Requirements

151 – Performance Bond and Payment Bond 152 – Insurance 153 – Progress Schedule 154 – Mobilization 155 – Construction Field Office 156 – Materials Field Laboratory and Curing Facility 157 – Construction Layout and Monuments 158 – Soil Erosion and Sediment Control and Water Quality Control 159 – Traffic Control

160 – Price Adjustments 161 – Final Cleanup.

Page 76: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 76/229

Section 152.03 Insurance

The Department will not consider the Work or anyportion as put to its intended use until Acceptance

underwritten by companies with a current A.M. Best

rating of A- with a Financial Size Category of VII or better 

Deductibles for each policy are limited to $250,000

per occurrence Payment – lesser of bid or actual cost at start of 

project w/ balance paid at end or contract

Page 77: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 77/229

Section 152.03 Insurance

Comprehensive General Liability – Waiver of Subrogation for all claims and suits, including recovery of any

applicable deductibles – Severability of Interest/Separation of Insureds – Per project aggregate

Comprehensive Automobile Liability – Waiver of Subrogation for all claims and suits, including recovery of any

applicable deductibles – Severability of Interest/Separation of Insureds

Workers Compensation –

If construction operations requires marine operations, endorse to includeUS Longshore and Harbor Workers/Jones Act coverage

Marine Liability Insurance – no longer a separate pay item

Page 78: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 78/229

Section 152.03 Insurance

Railroad Protective Liability – ensure Comprehensive General Liability policy is endorsed to provide for 

independent contractors’ coverage and deletes any exclusions applying toliability arising out of operations in proximity to railroad property

 – Waiver of Subrogation for all claims and suits, including recovery of anyapplicable deductibles

 – Severability of Interest/Separation of Insureds Pollution Liability Insurance

 – Will be required on all projects – If the policy is written on an occurrence form, ensure it will remain in effect

until Acceptance, and ensure that completed operations coverage is

provided for a period of no less than 2 years after Acceptance. – If the policy is written on a claims-made basis, ensure an Extended

Reporting Provision coverage is maintained for a period of no less than 2years after Acceptance

Page 79: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 79/229

Section 152.03 Insurance

Pollution Liability Insurance. – Bodily injury and property damage to third parties. – Natural resource damages. – Environmental cleanup including restoration or replacement costs. – Legal defense. – Transportation of waste material by or on behalf of the Contractor 

away from the Project Limits. – Disposal liability for pollution conditions on, at, under, or 

emanating from any disposal site, location or facility used by or onbehalf of the Contractor for disposal of waste.

 – Waiver of Subrogation for all claims and suits, including recoveryof any applicable deductibles.

 – Severability of Interest/Separation of Insureds.

Page 80: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 80/229

Section 153.03 Progress Schedule

New/separate item for Progress ScheduleUpdates

New item for Bar Chart Progress Schedule &Update item.

If no schedule item provided- no schedule

required

Page 81: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 81/229

Section 153.03 Progress Schedule

CPM progress schedule Schedule must conform to DOT manual and

DOT template

Preliminary Schedule

 – Review/approval changed from 5 SBD to 14 days

(and 7 days for re-reviews)

Section 153.03.02 Progress

Page 82: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 82/229

Schedule Updates

The RE will designate the due date for the firstupdate (approximately 2 months following approvalof baseline.

Schedule review meeting 14 days prior to updatedue date – provide information detailing actual startand actual finish dates of activities in progress duringthe previous 2 months

Revise the logic to reflect the actual sequence of work

Within 14 days of the review meeting – submit theupdate

RE will review/approve or reject within 14 days

Page 83: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 83/229

Section 153.04 Payment

* Payment for mobilization is tied to approval of progressschedule

If the Contractor’s update is not approved by the date of theprogress meeting for the following update, the Department willassess liquidated damages to recover the Department’sincreased administrative costs

Damages are : – First Missed Update $5,000

 – Second consecutive $10,000

 – Subsequent consecutive $15,000

If updates come back into compliance, and then misses anupdate, damage goes back to value for first missed update

Section 155.03 Construction

Page 84: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 84/229

Field Office

Inspection equipment for work will be listed inspecial provisions

Field office type will list required number of parking

spaces.

Page 85: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 85/229

Section 157 Construction

Page 86: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 86/229

Layout

Before beginning construction operations, establish lines for ROW, easement, and other restrictions, such as boundaries for environmentally sensitive areas

Provide layout for Utilities - ensure that relocated utility facilitiesdo not conflict with proposed construction

Set offset stakes at a maximum interval spacing of 50 feet.Where baselines have a radius of less than 475 feet, provideoffset stakes at a maximum interval spacing of 25 feet.

Provide grade sheets to the RE showing the cut or fill to thefinished profile lines with reference to the offset stakes.

Provide the RE with assistance as requested for verification of lines, grades, boundaries, dimensions, and elevations.

Section 157 Construction

L

Page 87: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 87/229

Layout

Elimination of Item “Reset Monuments” Elimination of Item “Construction Stakes &

Markers”

Section 158 Soil Erosion

S di C l

Page 88: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 88/229

Sediment Control

Submit original Environmental Compliance CheckList and Inspection Form to the RE the same day asinspection

Caution Fence – name change for orange snowfence.

Heavy Duty Silt Fence, Orange – to be used in lieu

of old heavy duty silt fence and snow fence

Section 158 Soil Erosion

S di t C t l

Page 89: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 89/229

Sediment Control

Inlet Filter, Type 1 & Type 2Type 1 – wire/fabric

Type 2 – bag

Concrete Washout System – paid Lump Sum. Construction Driveway – redressing w/ stone part of 

item

Erosion Control Sediment Removal – paid by CY

S ti 159 T ffi C t l

Page 90: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 90/229

Section 159 Traffic Control

Traffic Control moved from 617 Item name changes:

 – Construction Barrier Curb

 – Flashing Arrow Board – Portable Variable Message Sign

 – Temporary Crash Cushion

 – Traffic Control Truck with Mounted Crash Cushions

 – Channelizing Guide Posts

159.03.01 Traffic Control

C di t

Page 91: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 91/229

Coordinator

The TCC must also successfully complete anapproved Traffic Coordinator refresher course every 2 years

TCC’s responsibilities detailed

159.03.02 Traffic Control

Devices

Page 92: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 92/229

Devices

Devices must meet an acceptable condition asdescribed in the ATSSA guide Quality Standards for Work Zone Traffic Control Devices

Place traffic control devices as directed to providetraffic control for Department personnel doinginspections, sampling, testing, and takingmeasurements required for the Project

159.03.02 Traffic Control

Devices

Page 93: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 93/229

Devices

Construction Barrier Curb – criteria for acceptablebarrier listed – Exposed steel at the connector flangeway.

 – Exposed reinforcement steel.

 – Cracking through the cross section.

 – An area of concrete missing larger than a 3-inch by 3-inch right triangle.

 – Debris in the keyway.

 – Non-functioning anchor bolt holes.

 – Non-functioning anchor rod hole.

 – Paint applied to the surface. – Objects protruding from the surface.

 – Previous repairs.

159.03.02 Traffic Control

Devices

Page 94: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 94/229

Devices

Traffic Control Truck with Mounted Crash Cushion: – Provide the RE with a copy of the crash cushion

manufacturer’s recommendations

 – When used in a fixed position, place manual transmission

vehicles in second gear and place automatic transmissionvehicles in park. Ensure that the parking brake is set, andthe wheels are turned to avoid rolling into active traffic lanes

 – When using ballast, ensure that it is secured to the truck.Submit working drawings signed by a PE certifying the thatit is capable of withstanding the impact forces for which theimpact attenuator is rated

159 03 06 HMA Patch

Page 95: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 95/229

159.03.06 HMA Patch

RE may direct the Contractor to sawcutexisting HMA pavement to the depth of thearea to be repaired

Apply polymerized joint adhesive or tack coatto the vertical surfaces of the openings

Section 159.03.08 Traffic

Direction

Page 96: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 96/229

Direction

Flagger (name change from Traffic Director) Police – details on requesting police

assistance

Section 160 Price

Adjustments

Page 97: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 97/229

Adjustments

Fuel Price and Asphalt Price Adjustmentsections

Fuel Price Adjustment – some additional

items added to list of eligible items.

Division 200 Earthwork

Page 98: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 98/229

Division 200 Earthwork

201 Clearing Site 202 Excavation

203 Embankment

Section 201 Clearing Site

Page 99: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 99/229

Section 201 Clearing Site

Clearing Site, Bridge and Clearing Site,Structure - Submit a demolition plan detailingthe methods and equipment to be used to

the RE for approval 30 days beforedemolition operations

Section 201 Clearing Site

Page 100: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 100/229

Section 201 Clearing Site

Changed Demolition Item….Now byDemolition # and Parcel #

Changed Asbestos Removal Item….Now by

Demolition # and Parcel #

Constructing pipe plugs has been added to

Clearing Site. “Miscellaneous Concrete” hasbeen eliminated

Section 202 Excavation

Page 101: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 101/229

Section 202 Excavation

Excavation items have been simplified into 3 Items: – Excavation, Unclassified.

 – Excavation, Regulated (includes Regulated and Hazardous)

 – Excavation, Acid Producing Soil.

There will no separate Items for foundation, road,rock, wet, bridge, channel, ditch etc.

Changes to the Earthwork Summary (see Sample

Plans) Blasting is allowed

Presplitting is an Item

Section 202 Excavation

Page 102: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 102/229

Section 202 Excavation

Temporarily Storing - Standard stockpilingspec.

Measuring Elevation - RE will check

elevations within the roadbed limits using astringline drawn taut between contractor stakes.

This is the standard grade check languagereferenced in other sections.

Section 202 Excavation

Page 103: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 103/229

Section 202 Excavation

Removing Pavement – Requires a full depthwet sawcut.

202.03.07 Reuse or Disposal of Excess

Material A. Reuse. Can be placed into Embankment

B. Disposal. Cannot be placed into

EmbankmentThese are the references for excess material

Section 203 Embankment

Page 104: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 104/229

Section 203 Embankment

Zone designations have been eliminated. I-7 = Zone 1

I-9 = Porous Fill & BEBF (under water)

I-10 = BEBF I-11 = Zone 2

I-13 = Select Material

I-14 = Zone 3

I-15 = MSE Select Material

Section 203 Embankment

Page 105: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 105/229

Section 203 Embankment

Placing and Compacting Methods – End-Dumping Method

 – Control Fill Method

 – Directed Method – (the default method) – Density Control Method

Division 300 Subbase and Base

Courses

Page 106: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 106/229

Courses

301 Subbase 302 Aggregate Base Course

303 Asphalt Stabilized Drainage Course

304 Concrete Base Course

305 Rubblizing Concrete Pavement

Division 300 Subbase and Base

Courses

Page 107: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 107/229

Courses

Following were deleted from 300: – Road-Mixed Stabilization

 – Plant-Mixed Stabilization

 – Lime-Pozzolan Stabilized Base Course

Section 301 Subbase

Page 108: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 108/229

Section 301 Subbase

Moved Subbase from 200 Before placing subbase, ensure that the

subgrade has been graded and compacted

to within a tolerance of ±1/2 inch of therequired elevation. The RE will checkelevations of the roadbed subgrade asspecified in 202.03.03.C.

Section 302 Aggregate

Base Course

Page 109: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 109/229

No major changes from old 301 sectioncovering both Soil Aggregate I-5 and DGA(Dense Graded Aggregate) Base Courses.

DGA is now the preferred base coursethroughout the state due to availability of recycled sources throughout the state.

Section 303 Asphalt-Stabilized

Drainage Course

Page 110: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 110/229

g

New standard specification based on theBSOG/ASOG specifications that have beenused on project specific basis for the past

20+ years.

Section 304 Concrete Base

Course

Page 111: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 111/229

Follows the requirements for ConcreteSurface Course except for ride quality.

Section 305 Rubblizing Concrete

Pavement

Page 112: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 112/229

New standard specification for rubblizationwhich has been used on a project specificbasis for the past few years. 2 types of 

breaking equipment – Resonant

 – Multihead

Division 400 Pavements

Page 113: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 113/229

401 – Hot Mix Asphalt (HMA) Courses 402 – HMA Friction Course

403 – Ultra-Thin Friction Course

404 – Stone Matrix Asphalt (SMA)

405 – Concrete Surface Course

Division 400 Pavements

Page 114: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 114/229

Following were deleted from Division 400: Aggregate Surface Course

Bituminous Surface Treatment

HMA Marshall mix designs (Mix I-2, I-4, etc.)

Section 401 Preparing Existing

Pavement

Page 115: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 115/229

Milling (No test strip required) – HMA MILLING, 3" OR LESS

 – HMA MILLING, MORE THAN 3" TO 6“

 – CONCRETE MILLING

 – HMA PROFILE MILLING

Section 401 Tack Coat and

Prime Coat

Page 116: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 116/229

Tack Coat 64 added as a new item. This isPG 64-22 used as a tack coat.

Section 401 HMA Courses

Page 117: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 117/229

HMA is specified in 2007 specifications (it is thesame as “Superpave”)

No Marshall Mix designs Using same nomenclature to define the mixes but

the description has been moved to 902

 – HOT MIX ASPHALT 9.5 M 64 SURFACE COURSE – HOT MIX ASPHALT 12.5 M 64 INTERMEDIATE COURSE

 – HOT MIX ASPHALT 19 M 64 BASE COURSE

Section 401 HMA Courses

Page 118: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 118/229

Paving Plan. At least 20 days beforebeginning placing the HMA surface course,submit a detailed plan of operation to the RE.

Section 401 HMA Courses

Page 119: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 119/229

Requires use of MTV unless waived bySpecial Provisions

Echelon Paving is standard not cold joint

paving Ride quality specification uses IRI. Six sets

of equations to be considered. SpecialProvisions to indicate which equations to beused in which areas of the project.

Section 401 HMA Courses

Page 120: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 120/229

Weather Limitations. – Do not place HMA if it is precipitating. Do not allow trucks

to leave the plant when precipitation is imminent. TheContractor may resume operations when the precipitationhas stopped and the surface is free of water 

Opening to Traffic. Open when the surfacetemperature meet the following requirements: – 1. When using PG 64-22 or PG 70-22, surface temperature

is less than 140 °F. – 2. When using PG 76-22, surface temperature is less than

170 °F.

Section 401 HMA Courses

Page 121: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 121/229

Polymerized Joint Adhesive required for coldlongitudinal joints on surface course only.

Section 401 Sawcutting and

Sealing of Joints

Page 122: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 122/229

No major changes.

Section 401 Core Samples

Page 123: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 123/229

No major changes in specification.

Section 402 HMA Friction

Course

Page 124: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 124/229

Dense Graded Friction Course eliminateddue to shortage of appropriate aggregates.

Open Graded Friction Course expanded to

include Modified Open Graded FrictionCourse Mixes.

Section 403 Ultra-Thin Friction

Course

Page 125: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 125/229

New standard specification for the old“Novachip” type of friction course. This is ageneric version of a specification which has

been used on a project specific basis for thepast 10 years.

Section 404 Stone Matrix

Asphalt (SMA)

Page 126: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 126/229

New standard specification for SMA whichhas been used on a project specific basis for the past 10 years.

Section 405 Concrete Surface

Course

Page 127: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 127/229

Major changes have been made in thespecifications and details for concretesurface course. (see details) – Elimination of expansion joints.

 – Shorter spacing of contraction joints.

 – Allowance for slipform paving.

 – Elimination of steel reinforcement.

 – Requirement to Diamond Grind Surface.

 – Ride quality determined using IRI.

Section 405 Concrete Surface

Course

Page 128: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 128/229

Concreting Plan. At least 20 days beforeplacing the concrete surface course, submitto the RE for approval a detailed plan of 

operation

Section 405 Concrete Surface

Course

Page 129: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 129/229

Weather Limitations. Comply with the limitations of placing as specified in 504.03.02.C, except do notplace concrete when the ambient temperature isabove 85 °F. If within the 12 hours preceding the

scheduled concrete placement the National Weather Service (refer to http://www.nws.noaa.gov/) locallyforecasts a 40 percent chance or greater of precipitation during the scheduled concrete

placement, postpone the placement of bridge decksand pavement.

Section 405 Concrete Surface

Course

Page 130: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 130/229

Curing. Ensure that the concrete is notexposed for more than 30 minutes after finishing. The RE will direct a suspension, as

specified in 108.13, of concrete operations if the curing procedure is delayed or is notfollowed. Maintain the curing material for 7

days.

Section 405 Concrete Surface

Course

Page 131: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 131/229

Sawcutting Relief Joints. Relief joints are apreliminary step in the construction of transverse andlongitudinal joints. The Contractor may beginsawcutting relief joints as soon as hardened

concrete can support operations without spalling andmust finish within 18 hours of placing concrete.

Sawcutting and Sealing Joints. Done after 

completion of diamond grinding and joints must besealed before opening to traffic

Division 450 Concrete Pavement

Rehabilitation

Page 132: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 132/229

451 – Concrete Slab Stabilization

452 – Partial Depth Concrete Pavement Repair 

453 – Full Depth Concrete Pavement Repair 

454 – Retrofit Dowel Bars 455 – Diamond Grinding Existing Concrete

Pavement

456 – Sealing Existing Joints in Concrete Pavement

Division 450 Concrete Pavement

Rehabilitation

Page 133: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 133/229

New Division for CPR techniques that havebeen used on project specific basis for 10+years.

Section 451 Concrete Slab

Stabilization

Page 134: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 134/229

Items for Pozzolan and Polyurethane grouts.

Weather Limitation. – Pozzolan - Do not perform slab stabilization when the pavement surface

temperatures are below 32 °F or if the subgrade or base course is frozen.If proper slab stabilization cannot be achieved due to excessivetemperatures or direct sunlight, perform work at night.

 – Polyurethane - Do not perform slab stabilization if the underlying materialis frozen.

Deflection Testing – Perform deflection testing of joints between midnight and 10 a.m. The RE

may stop testing earlier if there is evidence of slab lockup due to thermalexpansion of the slabs. The RE may allow testing to continue after the

hour specified if the slabs are not interlocked or under compression.

Section 452 Partial Depth Concrete

Pavement Repair

Page 135: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 135/229

Repair specifies sawcutting, removal of deteriorated concrete, and placing of Type1A or 1B Quick Setting Patch

Section 453 Full Depth Concrete

Pavement Repair

Page 136: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 136/229

Sawcut and lift out full depth of concretepavement. NO Breaking

Items for repairs depending on type of 

material used for the repair. – Concrete Class V, E, or B.

 – HMA

Section 454 Retrofit Dowel Bars

Page 137: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 137/229

For load transfer, for transverse joints or cracks.

Page 138: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 138/229

Section 456 Sealing Existing Joints

in Concrete Pavement

Page 139: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 139/229

Specification for cleaning and resealing of  joints.

Division 500 Bridges and Structures

Page 140: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 140/229

501 – Sheeting and Cofferdams

502 – Load Bearing Piles 503 – Drilled Shaft Foundations 504 – Structural Concrete 505 – Precast and Prestressed Structural Concrete 506 – Structural Steel 507 – Concrete Bridge Deck and Approaches 508 – Bridge Drainage 509 – Bridge Railing and Fence 510 – Timber Structures

511 – Bulkhead, Fender, and Dolphin Systems 512 – Sign Support Structures 513 – Retaining Walls 514 – Temporary Structures

Section 501 Sheeting and Cofferdams

Page 141: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 141/229

Permanent Sheeting and PermanentCofferdams will be designed by theDepartment.

Temporary Sheeting and TemporaryCofferdams will be designed by theContractor.

Section 502 Load Bearing Piles

Page 142: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 142/229

Specification has been updated andorganized better.

Section 503 Drilled Shafts

Page 143: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 143/229

Drilled Shaft specification standardized.

Section 504 Structural Concrete

Reinforcement Steel

Page 144: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 144/229

Reinforcement Steel – No significant changes

Constructing Concrete – Limitations of Placing. At least 30 days before placing concrete, submit to the RE

for approval a plan for hot and cold weather concreting. – Do not place concrete when precipitation is imminent as determined by the RE. If it

begins precipitating during concrete placement, the RE may direct the Contractor tosuspend placement operations and protect the plastic concrete as specified in504.03.02.I. If placement cannot be resumed within 30 minutes, the RE may directthe construction of a construction joint.

 – If, during the concrete placement or within the 24 hours preceding the scheduled concrete placement, the National Weather Service http://www.nws.noaa.gov/locally forecasts the ambient temperature to be below 40 °F or above 75 °F during thescheduled concrete placement or curing period, follow the appropriate temperaturecondition procedure. Do not place concrete when the ambient temperature is below20 °F or above 100 °F.

NOAA.GOV

Page 145: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 145/229

http://www.nws.noaa.gov/

Local forecast by"City, St" 08625

Hourly Weather Graph Temperature and Precipitation Potential

Section 504 Structural Concrete

C t ti C t

Page 146: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 146/229

Constructing Concrete

 – Cold Weather Concreting. The RE will prohibit theplacement of concrete when the ambient temperature isbelow 40 °F, unless all surfaces in contact with the concrete

placement are preheated to between 50 and 80 °F andaccess is provided for measuring the temperature of the in-place concrete. For access, establish a 1/2 inch diameter hole that is 6 inches deep at a 45 degree angle by placing a

greased bolt through the forms prior to concrete placement.

Section 504 Structural Concrete

H t W th C ti Wh th bi t

Page 147: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 147/229

Hot Weather Concreting. When the ambient

temperature reaches 75 °F, use the followingprocedures before and during concreting operations.

 – Schedule work so that concrete can be placed continuously.

 – Use a water-reducing admixture or a water-reducing andretarding admixture.

 – Prevent absorption by sprinkling the underlying material andthe wood forms.

 – Begin curing within 5 minutes after finishing.

Section 504 Structural Concrete

P mped Concrete At l t 30 d b f

Page 148: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 148/229

Pumped Concrete. At least 30 days before

beginning operations, submit a plan to the REaccording to ACI 304.2R. For flatwork concrete,ensure that the pipeline is horizontal for at least

6 feet at the discharge end. Take samples of the plastic concrete according to

AASHTO T 141 from the discharge end of the

pipeline. Immediately deliver the samples to the MEfor testing.

Page 149: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 149/229

Page 150: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 150/229

Section 504 Structural Concrete

Loading Concrete Structures Do not allow anything other

Page 151: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 151/229

Loading Concrete Structures. Do not allow anything other 

than the curing materials on concrete surfaces for 24 hoursafter placing the concrete. The Contractor may beginconstructing forms for subsequent concrete placements after the forms from the underlying concrete can be removed asspecified in 504.03.02.G. After the forms have beenconstructed and at least 3 days after the underlying concretehas been placed, the Contractor may perform subsequentconcrete placements. The Contractor may begin storingmaterials, backfilling, or other loading on the concrete surface 3

days after the concrete has been placed if the forms can beremoved as specified in 504.03.02.G.

Section 504 Structural Concrete

Page 152: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 152/229

Form Removal Form Removal with Strength * Cold Weather Curing ** Subsequent Forming *** Subsequent Pours/LoadingBarrier Curb Concrete holds shape NA 5 DAYS at 60 °F NA NA

Piles 24 HOURS*** NA 5 DAYS at 60 °F 24 HOURS 3 DAYS Minimum or Forming Requirement if >

Footing 24 HOURS*** NA 5 DAYS at 60 °F 24 HOURS 3 DAYS Minimum or Forming Requirement if >

Abutment Wall 24 HOURS*** NA 5 DAYS at 60 °F 24 HOURS 3 DAYS Minimum or Forming Requirement if >

Cast in Place Retaining Walls 24 HOURS*** NA 5 DAYS at 60 °F 24 HOURS 3 DAYS Minimum or Forming Requirement if >

Wing Walls 14 DAYS 3 DAYS 3000 PSI 5 DAYS at 60 °F Required Form Removal of Previous Pour Subsequent Forming Requirement

Battered Columns 14 DAYS 3 DAYS 4000 PSI 5 DAYS at 60 °F Required Form Removal of Previous Pour Subsequent Forming Requirement

Pier Caps 14 DAYS 3 DAYS 4000 PSI 5 DAYS at 60 °F Required Form Removal of Previous Pour Subsequent Forming Requirement

Arches 14 DAYS 7 DAYS 4000 PSI 7 DAYS at 60 °F Required Form Removal of Previous Pour Subsequent Forming Requirement

Culverts 14 DAYS 7 DAYS 4000 PSI 7 DAYS at 60 °F Required Form Removal of Previous Pour Subsequent Forming Requirement

Approach Slab 14 DAYS 7 DAYS 4000 PSI 7 DAYS at 60 °F 14 DAYS + 4000 PSI 80000 pound Maximum Subsequent Forming Requirement

Deck 14 DAYS NA 7 DAYS at 60 °F 14 DAYS + 4000 PSI 80000 pound Maximum Subsequent Forming Requirement

Bridge Sidewalk 24 HOURS NA 5 DAYS at 60 °F NA Subsequent Forming Requirement

Bridge Parapet and Barrier Concrete holds shape NA 5 DAYS at 60 °F NA Subsequent Forming Requirement

ALL ELSE 24 HOURS NA 5 DAYS at 60 °F Required Form Removal of Previous Pour 3 DAYS Minimum or Forming Requirement if >

* When using protective measures for cold weather concreting, as specified in 504.03.02.C.1, do not remove the forms until the protective measures are removed regardless of concrete cylinder strength.

** If the temperature of the concrete falls below 60 °F within 5 days after placing, maintain the protective measures in place for an additional 5 days.

*** If >20% flyash 3 days

Section 504 Structural Concrete

Epoxy Waterproofing

Page 153: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 153/229

Epoxy Waterproofing

 – New detail, stepping eliminated

Section 505 – Precast and Prestressed

Structural Concrete

Combined prestressed and precast into one

Page 154: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 154/229

Combined prestressed and precast into onesection. Fabrication requirements for precastand prestressed concrete have been moved

to Division 900. Erection Plan. Submit a plan of operations

to the RE for approval at least 30 days before

the pre-erection meeting.

Section 506 Structural Steel

All new structural steel will be shop painted Only

Page 155: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 155/229

All new structural steel will be shop painted. Only

touch ups and field bolted connections will bepainted in the field. Fabrication requirements havebeen moved to Division 900.

Erection Plan. At least 30 days before the pre-erection meeting, submit a plan of operations to theRE for approval.

Installing High-Strength Steel Bolts Use of DirectTension Indicators (DTIs) required.

Section 507 Concrete Bridge Deck

and Approaches

Joint Assemblies (3 standard items)

Page 156: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 156/229

Joint Assemblies (3 standard items)

 – Strip Seal Expansion Joint Assemblies.

 – Preformed Elastomeric Joint Assemblies.

 – Modular Expansion Joint Assemblies Constructing Bridge Decks

 – Stay-In-Place (SIP) Forms – Contractor to provide form cut

and fill grade sheets.

Section 507 Concrete Bridge Deck

and Approaches

Deck Placement Plan. At least 15 days

Page 157: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 157/229

Deck Placement Plan. At least 15 daysbefore the start of placing bridge deckconcrete, submit to the RE for approval aplan of operation

Meeting. Within 10 days before the start of deck placement, conduct a meeting with theRE, the ME, and the concrete supplier to

discuss the plan of operation and tocoordinate the deck placement.

Page 158: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 158/229

Page 159: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 159/229

Section 507 Concrete Bridge Deck

and Approaches

Loading the Deck. Before allowing anything on the deck,

Page 160: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 160/229

ensure that the deck has cured for a minimum of 14 days. TheRE may allow the Contractor to place a finishing machine onthe deck 72 hours after placing concrete for the previoussegment.

After a minimum of 14 days, the Contractor may load a total of 

80,000 pounds on the deck if the deck has attained a strengthof at least 4000 pounds per square inch, After a minimum of 28 days, the Contractor may load more than

80,000 pounds if the deck has attained the design strength andif approval has been obtained from the Department. To obtain

approval, submit stress analysis calculations for the load andthe location of the load on the deck.

Section 507 Concrete Bridge Deck

and Approaches

Date Panel (New Item)

Page 161: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 161/229

( )

 – Submit a sample of the date panel showing thecoloring and surface finish to the RE for approval.

Bridge Approach – No more approach andtransition slabs…..new detail for the BRIDGEAPPROACH

Page 162: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 162/229

Section 511 Bulkhead, Fender, and

Dolphin Systems

Contractor can choose 2 types of piling

Page 163: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 163/229

Fiberglass Reinforced Plastic Piles(FRPP) or Fiberglass-Concrete CompositePiles (FCCP)….Item is Composite Pile

SECTION 512 SIGN SUPPORT

STRUCTURES

No significant changes

Page 164: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 164/229

g g

Section 513 Retaining Walls

2 Types

Page 165: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 165/229

 – CIP

 – Proprietary

Noise Walls have been eliminated fromstandard spec….use will be specifed in SPs

SECTION 514 – TEMPORARY

STRUCTURES

No significant changes

Page 166: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 166/229

Division 550 Structure Rehabilitation

New Division created by removing structure

Page 167: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 167/229

rehabilitation specifications from Division500.

551 – Bridge Deck Rehabilitation – Type A Bridge Deck Repair has been eliminated.

552 – Pressure Injection Sealing

553 – Pneumatically Applied Mortar 

Division 554 – Painting Existing

Bridges

Changes to Painting Existing Bridges

Page 168: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 168/229

specification including major revisions to thePollution Control System have been made.Contractors must submit LHASP for allprojects (4 Items) – POLLUTION CONTROL SYSTEM

 – HAND/POWER TOOL CLEANING AND PAINTING

 – NEAR-WHITE BLAST CLEANING AND PAINTING – TESTING, IF AND WHERE DIRECTED

Division 600 Miscellaneous

Construction

601 – Pipe

Page 169: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 169/229

602 – Drainage Structures 603 – Slope and Channel Protection 604 – Gabion Walls 605 – Fence

606 – Sidewalks, Driveways, and Islands 607 – Curb 608 – Non-Vegetative Surfaces 609 – Beam Guide Rail

610 – Traffic Stripes, Traffic Markings, and Rumble Strips 611 – Crash Cushions 612 – Signs

Page 170: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 170/229

Section 601 Pipe

High Density Polyethelelene (HDPE) Pipe is

Page 171: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 171/229

now a standard Item

Section 602 Drainage Structures

Combined Inlets and Manholes and Culverts

d H d ll i S i 602 D i

Page 172: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 172/229

and Headwalls into Section 602 DrainageStructures.

Section 603 Slope and Channel

Protection

Merged Slope Gutters into Slope and

Ch l P t ti

Page 173: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 173/229

Channel Protection

Section 604 Gabion Walls

Gabion Walls specification added.

A l 10 d b f b i i h k

Page 174: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 174/229

 – At least 10 days before beginning the work,submit the manufacturer’s installation guide tothe RE. Ensure that a representative from the

manufacturer is at the work site during the firstday of assembling the gabion basket and the firstday of placing and filling the gabions. Install

gabion walls according to the manufacturer’srecommendations.

SECTION 605 FENCE

No significant changes

Page 175: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 175/229

Section 606 Sidewalks, Driveways, and

Islands

Combined Sidewalks and Driveways and

I l d i t S ti 606

Page 176: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 176/229

Islands into Section 606.

Section 607 Curb

Combined Hot Mix Asphalt Curb, Barrier 

Curb etc into 607

Page 177: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 177/229

Curb, etc into 607. – Delineators part of Barrier Curb Item

Section 608 Non-Vegetative Surfaces

Non- vegetative surface now in Section 600.

Page 178: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 178/229

Section 609 Beam Guide RailBeam Guide Rail Specifications Updated

– Wooden spacers are no longer being used

Page 179: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 179/229

  Wooden spacers are no longer being used. – Delineators part of BGR

Before driving or mounting the posts, determine the location of utilities that may conflict with the posts. After completing the

wiring for each electrical system and before makingconnections, perform the following tests on each circuit usingsuitable equipment in the presence of the RE: – 1. Tests for continuity.

 – 2. Tests for ground.

 – 3. Tests for insulation resistance between circuit wires and fromcircuit wires to ground.

Section 610 Traffic Stripes, Traffic

Markings, and Rumble Strips

Traffic Item Specs updated

Traffic Stripes

Page 180: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 180/229

 – Traffic Stripes

 – Traffic Markings

 – Raised Pavement Markers (RPM)

 – Ground Mounted Flexible Delineators

 – Rumble Strips

Page 181: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 181/229

Page 182: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 182/229

Page 183: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 183/229

Section 651 Water Items

 –  ___" DUCTILE IRON WATER PIPE, CLASS ___  –   " DUCTILE IRON WATER PIPE BRIDGE, CLASS  

Page 184: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 184/229

___ UC O G , C SS ___ – WATER SERVICE CONNECTION – FIRE HYDRANT – RELOCATE FIRE HYDRANT

 – RESET FIRE HYDRANT – RESET WATER VALVE BOX – WATER AS-BUILT PLAN

The Department will measure ___" DUCTILE IRON WATER

PIPE by the linear foot including the lengths of tees, sleeves,and valves measured parallel to the water pipe outside the limitof a structure.

Section 652 Sanitary Sewers

Section 653 Gas

Similar to 651

– Items and Asbuilt Plan

Page 185: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 185/229

  Items and Asbuilt Plan

Division 700 Electrical

701 – General Items

702 – Traffic Signals

Page 186: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 186/229

702 Traffic Signals

703 – Highway Lighting

704 – Intelligent Transportation Systems(ITS)

Page 187: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 187/229

Section 701 General Items

Conduit….4 Types

 – Rigid Metallic Conduit

Page 188: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 188/229

g

 – Rigid Nonmetallic Conduit

 – Flexible Metallic Conduit

 – Flexible Nonmetallic Conduit

No CUR CUG Exposed etc.

Cable Rack – Item when adjustments to JBsare shown

Section 701 General Items Testing. After completing the wiring for each

electrical system and before making connections,perform the following tests on each circuit using

Page 189: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 189/229

y g ,p g gsuitable equipment in the presence of the RE: – 1. Tests for continuity.

 – 2. Tests for ground. – 3. Tests for insulation resistance between circuit wires andfrom circuit wires to ground. Verify that the insulationresistance is at least 150 megaohms between conductors,or between conductor and ground for circuits with a total

single conductor length of 1500 feet or more, and at least175 megaohms for circuits with a total single conductor length of less than 1500 feet.

Page 190: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 190/229

Section 703 Highway Lighting Major reorganization to Section 703. Items are no longer paid

for by “Assemblies”.

Payment for the different sizes and types of Standards, Mast

Page 191: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 191/229

y ypArms and Luminaires will be under the appropriate Item. – LIGHTING STANDARD ALUMINUM UNIT

 – LIGHTING STANDARD STEEL UNIT

 – LIGHTING STANDARD FIBERGLASS UNIT

 – LIGHTING MAST ARM ALUMINUM UNIT

 – LIGHTING MAST ARM STEEL UNIT

 –

LUMINAIRE UNIT Contractor is designing “Temporary Lighting System” unless

stated in the SPs

Section 704 Intelligent Transportation

Systems (ITS)

ITS Spec has become standard

Spec is similar to 702 and

Page 192: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 192/229

p703….components rather than assemblies

Page 193: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 193/229

Section 704 Intelligent Transportation

Systems (ITS)

Individual System Breakdown

 – A. Components.

Page 194: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 194/229

 – B. Installation.

 – C. Testing.

 – D. Maintenance.

 – E. Final Documentation.

 – F. Equipment Training.

Page 195: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 195/229

Section 801 Selective VegetationRemoval

Combined Selective Thinning and Selective

Clearing into one specification

Page 196: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 196/229

Page 197: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 197/229

Section 807 Topsoil Stabilization

Added additional types of Topsoil

Stabilization Matting

Page 198: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 198/229

 – Type 1 – Jute and Excelsior Matting

 – Type 2 – Erosion Mulch Blanket

 – Type 3 – Turf Reinforcement Mat

 – Type 4 – Mechanically Bonded Fiber Matrix

Section 811 Planting

Changed prescribed planting seasons to optimal planting seasons Added the removal of wire baskets on balled and burlapped plants Changed Item descriptions – NO LATIN NAMES…Plans to include a Latin Ordering Chart

 – LARGE DECIDUOUS TREE, ___ UNIT – LARGE DECIDUOUS TREE, SEEDLING ___ UNIT

SMALL DECIDUOUS TREE UNIT

Page 199: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 199/229

 – SMALL DECIDUOUS TREE, ___ UNIT – EVERGREEN TREE, ___ UNIT – EVERGREEN TREE, SEEDLING ___ UNIT – EVERGREEN TREE, SEEDLING ___ UNIT

 – DECIDUOUS SHRUB, ___ UNIT – EVERGREEN SHRUB, ___ UNIT – GROUND COVER OR VINE, ___ UNIT – PERENNIAL, ___ UNIT – BULB UNIT – CORM UNIT – TUBER UNIT – ROOT UNIT – RHIZOME UNIT

Section 811 Planting

Changed the Plant Establishment Period

 –

Upon completion of all plantings, request that an inspectionbe made by the Department to determine if the plants arealive and healthy The Department will inspect plantings

Page 200: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 200/229

alive and healthy. The Department will inspect plantingsbetween May 1 and October 1st. Replace plants asspecified in 811.03.01 that are missing or not alive and

healthy. If replacing plants outside of the optimal plantingseason as specified in Table 811.03.01-1, only usecontainerized or balled and burlapped plants that arecertified as being dug dormant. The plant establishment

period will begin when the Department determines that 100percent of the plants are alive and healthy

Section 811 Planting

 – The Department will reinspect the plants approximately 1 year after the start of the plant establishment period. If the Department

determines that plants need to be replaced, replant plants asspecified in 811.03.01 within 3 weeks. If replanting outside of the

ti l l ti ifi d i T bl 811 03 01 1 l

Page 201: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 201/229

optimal planting season as specified in Table 811.03.01-1, onlyuse containerized or balled and burlapped plants that are certifiedas being dug dormant.

 – The Department will reinspect the plants approximately 2 yearsafter the start of the plant establishment period. If the Departmentdetermines that plants need to be replaced, replant plants asspecified in 811.03.01 within 3 weeks. If replacing outside of the

optimal planting season as specified in Table 811.03.01-1, onlyuse containerized or balled and burlapped plants that are certifiedas being dug dormant.

Page 202: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 202/229

Page 203: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 203/229

Division 900 Materials

908 – Bolts and Bolting Material

909 – Drainage 910 Masonry Units

Page 204: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 204/229

910 – Masonry Units

911 – Signs, Sign Supports, and Delineators

912 – Paints, Coatings, Traffic Stripes, andTraffic Markings

913 – Guide Rail, Fence, and Railing 914 – Joint Materials

Division 900 Materials

915 – Timber and Timber Treatment

916 – Fiberglass Composite Materials

91

Page 205: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 205/229

917 – Landscaping Materials

918 – Electrical Materials 919 – Miscellaneous

Division 900 General

Reorganized for a better flow.

Incorporated BDC’s.

Mi h t f th t i l

Page 206: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 206/229

Minor changes to many of the materials

specifications to reflect current practices. More consistent in being clear on acceptance

practices/procedures and on requirement to

be from a QPL.

Division 900 QPL

QPL = Qualified Products List

For materials which have a long approvalprocess

Page 207: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 207/229

process.

In Division 900, those materials which arerequired to be on QPL prior to use are clearlyspecified.

Section 901 Aggregates

Gradation for Concrete Sand changed to

expand range on the No. 30. Gradation for DGA changed to ensure that its

Page 208: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 208/229

Gradation for DGA changed to ensure that itsnot too fine and RAP limited to 50% (basedon Rutgers’ research).

Soil Aggregates I-14 (old Zone 3) and I-15

(select fill for MSE walls) added.

Section 902 Asphalt

Reorganized to put all the requirements for 

asphalt products in one section. No major changes to the Bituminous

Page 209: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 209/229

No major changes to the BituminousMaterials (Asphalt Binder, Emulsions, andCutbacks) requirements except that InvertedEmulsions have been eliminated.

HMA is Superpave only. Marshall mixeshave been eliminated.

902.02.01 Mix Designation

Details on the mix designations moved from

406. Example:

Page 210: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 210/229

Example:

HOT MIX ASPHALT 12.5H64 SURFACECOURSE

Section 902 Asphalt

The following Sections have been added:

 – OGFC & MOGFC– Ultra-Thin HMA

Page 211: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 211/229

  Ultra Thin HMA

 – SMA

 – Asphalt Stabilized Drainage Course

Section 903 Concrete

Reorganized to bring the Cement, Admixtures,

Concrete Mixing, Curing Materials, and ConcreteRequirements to one Section.

Page 212: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 212/229

No longer using terms “Portland cement concrete” or 

“hydraulic cement concrete”. “Concrete” is usedgenerically.

Also, “cement” is either Portland cement or blended

hydraulic cement.

Section 903 PavementRepair Mixes

Class V – formerly known as VES or VHE.

Attains 350 psi flexural strength in 6.5 hours. Class E – early strength concrete that attains

Page 213: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 213/229

Class E early strength concrete that attains3000 psi in 72 hours.

Intended for pavement repairs caution shouldbe used in using these mixes for other 

applications.

Page 214: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 214/229

Section 903.06 Self-ConsolidatingConcrete

903.06.01 – SCC for Drilled Shafts

903.06.02 – SCC for Precast Concrete

Page 215: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 215/229

Project specific specification is needed for any other use of SCC.

Section 903.07 Quick Setting Patch

Type 1, 1A & 1B – Horizontal Repairs

 – Type 1 – neat or w/ 15lbs of No. 8 stone – Type 1A – mix design

Page 216: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 216/229

 – Type 1B – bagged with sand and stone

Type 2 (old Type 5) – Vertical and OverheadRepairs

Old Types 2, 3, & 4 deleted (underwater andlow & high temperatures).

Section 904 Precast andPrestressed Concrete

Consolidated requirements that were

scattered throughout 500 and 600 regardingthe fabrication of precast and prestressed

Page 217: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 217/229

concrete.

 – Non-Structural Precast Concrete

 – Precast Concrete Retaining Walls

 – Structural Precast Concrete

 – Prestressed Concrete

Page 218: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 218/229

Section 908.01.04 Adhesive AnchorBolt Systems

Specification for adhesive anchor bolt

systems written for bridge railing and bridgeguide rail attachments.

Page 219: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 219/229

For other uses of adhesive anchor bolts,designer should use careful consideration as

additional requirements may be necessary.Project specific specification may be needed.

Section 908.02/ High Strength Steel908.03 Bolts/DTI

Increased responsibility of supplier/contractor 

to ensure compliance with rotationalcapacity.

Page 220: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 220/229

Requirement to use DTI (Direct TensionIndicators) to ensure proper bolt installation

Section 913 Guide Rail, Fence &Railings

Guide rail end treatments from QPL.

Fence – simplified chain link fencespecifications. Orange plastic fence now

Page 221: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 221/229

called “caution fence”.

Steel and Aluminum Bridge Railings

Section 916 Fiberglass CompositeMaterials

New standard specification for fiberglass

composite materials to be used for bulkhead,fender, and dolphin systems.

Page 222: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 222/229

 – Fiberglass Reinforced Plastic Lumber 

 – Fiberglass Reinforced Plastic Piles

 – Fiberglass-Concrete Composite Piles

Page 223: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 223/229

Section 917 Landscaping Materials(continued)

New quality and inspection requirements for plant material (continued) – Inspections

Contractor to inspect and seal plants in nursery. Provide sealnumbers to Department Plants, when determined to be inspected by Department

– Origin greater than 100 miles from project inspections at

Page 224: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 224/229

 – Origin greater than 100 miles from project, inspections ata Department approved, contractor provided, holding yard

 – Origin within 100 miles from project, inspections byDepartment at the nursery

 – Contractor to notify RE at least 72 hours in advance of delivery to project

 – Shipment Contractor to ensure that deciduous materials are completely

dormant when they are dug

NJDOT Test Methods

After Division 1000 are the NJDOT test

methods that used to be in 990. They arereferred to in the specification by their designation. e.g. “NJDOT A-1”

Page 225: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 225/229

designation. e.g. NJDOT A 1

The last item in this section is “NJDOT ST”which are the statistical tables which used tobe in 914 but have been moved to the back

as they are used in many of the statisticalcalculations.

Division 1000 Equipment

1001 – Traffic Control Equipment

1002 – Compaction Equipment

1003 – HMA Site Equipment

1004 – Pile Driving Equipment

1005 Concrete Site Equipment

Page 226: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 226/229

1005 – Concrete Site Equipment

1006 – Concrete Pavement Rehabilitation Equipment 1007 – Traffic Striping Equipment

1008 – Miscellaneous Equipment

1009 – HMA Plant Equipment

1010 – Concrete Plant and Mixing Equipment 1011 – Precast and Prestressed Concrete Plant Equipment

Division 1000

Compilation of the equipment requirements

that were in Divisions 200 through 800. The XXX.02.02 Subsections in Divisions 200

th h 800 ill f b k t th i t

Page 227: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 227/229

through 800 will refer back to the equipment

specifications in Division 1000.

Page 228: 2007 Con Spec

8/4/2019 2007 Con Spec

http://slidepdf.com/reader/full/2007-con-spec 228/229

Questions