Roche Project – ICUP35

BIM Modeling

The project is located in Zhang Jiang Hi-Tech Park in Shanghai, the base on the north side of Long Dong Road, south of Li Shi Zhen Road, east of the ASE factory, On the west side of the Boehringer Ingelheim plant new 61# integrated power station.

2

BIM-Model(Infra 3D )

3

4

Underground buried pipeline and Sewer pipeline Drawing

屋顶设备管线图Pipe

Support

Drawing

BIM-Model(Infra 3D )

泵房管线图

Comprehensive undergroun

d pipeline Drawing 5

BIM-Model(Infra 3D )

6

Integrated pipeline drawing in trench for space management

Water pipeline drawing

BIM-Model(Infra 3D )

MEP Equipment Arrangement

7

Basement

First Floor

Second Floor

Third Floor Fourth Floor

BIM-Model(CUP 3D )

8

泵房管线图

MODEL

Overall

View

Space

Managemen

t

Openings

in Walls

2D layout integrated from 3D

model to ensure accuracy

BIM-Model(CUP 3D )

9

Zoomed in Perspective

View

BIM-Model(CUP 3D )

Rational use of space, beautiful

arrangement to facilitate construction

Screenshots of Basement10

BIM-Model(CUP 3D )

11

Air outlet positioned as per

ceiling grid

BIM-Model(CUP 3D )

12

Lighting, HVAC, Sprinkler etc.

positioned as per ceiling grid

BIM-Model(CUP 3D )

Water System

Pipeline view at RoofPipeline view

at L1 13

BIM-Model(CUP 3D )

Pipeline view

at L3

3D Model and Site picture61A-B19

14

3D Model and Site picture61A-B19

15

3D Model and Site picture61A-B19

1

6

3D Model and Site picture61A-B19

17

3D Model and Site picture61A-B18a

18

3D Model and Site picture61A-B07a

19

3D Model and Site picture61A-104

20

3D Model and Site picture61A-105

21

3D Model and Site picture61A-106

22

3D Model and Site picture61A-113

23

3D Model and Site picture61A-116

24

3D Model and Site picture61A-116

25

3D Model and Site picture61A-117

26

3D Model and Site picture61B-3F

27

3D Model and Site picture61B-3F

28

3D Model and Site picture61B-4F

29

Active and Existing INFRA between CUP and SHIP II building

3D Model and Site pictureINFRA

30

2D Mechanical And Electrical Pipeline

Comprehensive Drawings

31

2D UT Drawings.

32

2D HVAC Drawings.

33

34

2D Equipment pipeline section

2D Aisle Section Drawings

35

BIM - Operation and maintenance

36

Query the information of mechanical

equipment

Doing now what patients need next