Andrzej Zmudaandrzej.zmuda@cern.ch

Planned place to install

Planned method of installation

4 holes in angle bars 4 drilled blocks box on 4 scrubs

Electrical schematics prepared

Cable schedule updated

PT709, PT712 Vacuum pressures

UX15 level 6 FCTIR-000099

1 X3.1

NG4 2149068

1

connectUSA15 level 6 FCTIR-

000096Vacuum A USA15 Level 6

2 X3.2 2

3 X3.3 3

4 X3.4 4

PT809, PT812 Vacuum pressures

UX15 level 6 FCTIR-000099

1 X3.5

NG4 2149071

1

connectUSA15 level 6 FCTIR-

000096Vacuum B USA15 Level 6

2 X3.6 2

3 X3.7 3

4 X3.8 4

TS71x vacuum feedbacks plus spares

UX15 level 6 FCTIR-000099

1 X3.9

NG8 2149074

1

connectUSA15 level 6 FCTIR-

000096Vacuum A USA15 Level 6

2 X3.10 2

3 X3.11 3

4 X3.12 4

5 X3.13 5

6 X3.14 6

7 X3.15 7

8 X3.16 8

TS81x vacuum feedbacks plus spares

UX15 level 6 FCTIR-000099

1 X3.17

NG8 2149075

1

connectUSA15 level 6 FCTIR-

000096Vacuum B USA15 Level 6

2 X3.18 2

3 X3.19 3

4 X3.20 4

5 X3.21 5

6 X3.22 6

7 X3.23 7

8 X3.24 8

Box manufacturing in progress

Component installation progress

What is already done: Box installation location selected and agreed with CRYO Preliminary support design - done Electrical schematics for cable patching - completed IBL general cable schedule updated Box internal design completedWhat still needs to be done: Install all components inside the box – now (George) Add interconnection box 3D model in Smart Team

(Tomek B.) Install box in the cavern (George) Update electrical schematics for the Vacuum system

Summary