Post on 03-Apr-2016
description
Portfolio
Agnieszka Guderska
I miejsce
Ideenwettbewerb
Brücken 3Land
w kat. Perimenter 3
Projekt grupowy
Członkowie grupy:
Agnieszka Guderska
Clothilde Lebrun
Jean-Yves Pellen
Nicolas Teyssedre
“Synergy” Projekt konkursowy
kładki na terenie dzielnicy 3Land
w Bazylei
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
analizy, idea
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
wizualizacje
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
3Land Brücke Ideenwettbewerb / Concours d'idées Passerelle 3LandInsa Strasbourg / Département architecture Juin 2013Agnieszka Guderska, Clothilde Lebrun, Jean-Yves Pellen, Nicolas Teyssedre
Detail 2
Detail 1
Way between the tram station and the Novartis campus.
Connection of two riverbanks and the promenades situated along them.
Link between both sides of the Rhine.
Space for various activities enriching the crossing
Representation of the di�erent rhythms by the
use of the material
Relations between: light and shadow,
open and limited space.
View framing.
Synergy between promenade and work tra�c
Dynamic and visible e�ect.
Supporting structure composed of 2 beams, each 2,5m high.
Superstructure forming the outer skin and street furniture, all based on the supporting structure.
Tra�c
Structure
Function
Scenery and Rhythm
Footbridge
New district project
Context
Tra�c generated by the work facilities
Tra�c generated by the promenade
S y n e rg yA footbridge to experiment with different rhythms A footbridge to cross, to stop, to dream, ... A footbridge to spend time together A footbridge for everybody
ANALYSIS CONCEPT
Perimeter 3
Masterplan A dynamic form that embodies the rhythmic movement.
A footbridge to spend time together...
... Providing rhythm to the crossing
Principle of structure
Structure detail
Bridge deck detail
Outer skin and furniture detail
Elevation North
West entrance (Novartis) East entrance Spaces next to the water
Section A-A
Sheltered and open spaces
Section B-B Section C-C Section D-D
Places to enjoy the view Entertaining spaces River banks
A footbridge that suits everybody’s rhythm
Promenades
Workplaces Design methodology
Pedestrian sideways and bicycle paths
Work and research facilities Mind map
Location diagram
Pulse diagram
Scale 1:1000 View with the surroundings
Atmosphere
Atmosphere
Structure diagram
Axonometry scale 1:50
Axonometry scale 1:20
Axonometry scale 1:10
Outer skin
Deck
Bracing
Beams
Piers
Scale 1:500
Scale 1:50 Scale 1:50 Scale 1:50 Scale 1:50
Scale 1:200Scale 1:200
PROJECT ATMOSPHERE STRUCTURE
Footbridge plan Scale 1:500
2.5 % Rainwater
Wooden boards width : 10 cm
Steel square tube width : 10 cm
Steel angle
Flat steel pro�le �xing the wooden boards
Removable plant potdiameter 30cm
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
2.5 % Rainwater
Welded plate girder 2500 x 800 mm
Sti�ener
Box gutter for rainwater
Pipe PVC diameter 13 cm slope : 2.5%
Concrete slab 20 cmnon-slip coating + tightness
«I» Beam 300 span : 5 m
Beams of variable inertiaspan : 10 m
+
+
+
=
N
N
NN
B
B
B
B
C
C
C
C
A
A
A
A
D
D
D
D
widok, aksonometria konstrukcji
Projekt dyplomowy inżynierski
2014
Projekt tymczasowych domów na wodzie dla
ofiar katastrof
rzut, przekroje jednostek mieszkalnych rzut, przekrój terenu opracowania
projekt kursowy, indywidualny
Projekt parametryczny “Pawilon cieni”
Pavillon des ombresAgnieszka Guderska
Projekt urbanistyczny,
grupowy.
Członkowie grupy:
Agnieszka GuderskaMarine JacquetAgathe JulienneElodie LegendreBastien Lopes
Projekt dzielnicy mieszkaniowej we wsi
Biblisheim.
typologia mieszkań - przekr. poprz.
Widok na oś spajającą od strony stawu.
przestrzeń publiczna / prywatna
makieta
niegdysiejsza linia kolejowa- dzisiejsza oś
przestrzeń ogrodów łącząca zabytki
potencjał wody stref wilgotnych wykorzystany na powierzchni
Perspective B
Projekt urbanistyczny,
grupowy.
Członkowie grupy:
Léo BaratierPhilippe Girouard
Agnieszka GuderskaJean-Baptiste Hardy
Valentin Le Pape
Projekt urbanistyczny wzdłuż terenów
kolejowych w Miluzie
zagospodarowanie terenu
promenada zielona
“zamieszkiwać kanał” - osiedle wzdłuż kanału
Projekt więźby dachowej.
detale techniczne aksonometria
rzut, przekroje więźbyrzuty, przekrój, elewacje budynku
Rysunek odręczny
Agnieszka Guderska
aga.guderska@gmail.com
+48 663 550 154