SDP 3G SR Teluk Ewa

40
3G SITE DESIGN PACK A GE LANGKAWI NORTHERN NWXXXX TELUK EWA KEDAH

Transcript of SDP 3G SR Teluk Ewa

Page 1: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 1/40

3G SITE DESIGN PACKAGE

LANGKAWI

NORTHERN

NWXXXX

TELUK EWA

KEDAH

Page 2: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 2/40

SITE ID : NWXXXX

SITE NAME :

SITE CONFIGURATION : 1+1+1

FREQ. BAND : 3G

CELCOM (M) BHD

NORTHERN REGION

SITE DESIGN PACKAGE

Prepared by ;

TELUK EWA

Page 3: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 3/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

CELCOM (M) BHD

NORTHERN REGION

Site Information

Page 4: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 4/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

CELCOM (M) BHD

NORTHERN REGION

RF Design

Page 5: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 5/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

CELCOM (M) BHD

NORTHERN REGION

Existing 2G Information

Page 6: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 6/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

CELCOM (M) BHD

NORTHERN REGION

New 3G Information

Page 7: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 7/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

CELCOM (M) BHD

NORTHERN REGION

Site Picture

Page 8: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 8/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

CELCOM (M) BHD

NORTHERN REGION

Installation Plan

Page 9: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 9/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

NORTHERN REGION

Mobile Checklist / BOQ

CELCOM (M) BHD

Page 10: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 10/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

CELCOM (M) BHD

NORTHERN REGION

CME BOQ

Page 11: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 11/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

NORTHERN REGION

Transmission Checklist

CELCOM (M) BHD

Page 12: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 12/40

SITE ID : NWXXXX

SITE NAME : TELUK EWA

SITE CONFIGURATION : 1+1+1

Site Management Unit

CELCOM (M) BHD

NORTHERN REGION

Page 13: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 13/40

CELCOM (M) BHD 1 Site Information

NORTHERN REGION

KEDAH 2 RF Design

3 Existing 2G Information

4 New 3G Information

5 Site Picture

6 Mobile Checklist / BOQ

7 Installation Plan

NWXXXX 8 Transmission Check List

TELUK EWA 9 CME BOQ

1+1+1 10 Site Management Unit

Page 14: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 14/40

Site Approval

Survey Date : 14 June 2007

Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

Site: NWXXXX TELUK EWA

Prepared by

Name Mohd Nizam Mohd Noor (019-3160900)Company I-Convergence Sdn Bhd

Verified by

Name

Approved by

NameDepartment

Approved by

NameDepartment

Approved by

NameDepartment

SDP APPROVAL

Mobile Access Planning, Group Network Date

Date

Date

CME, Group Network Date

Transmission, Group Network Date

Page 15: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 15/40

Site Informations

Survey Date : 14 June 2007

Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

Site: NWXXXX TELUK EWA

1.0

1.1 Site Location and Access

GPS Positi on

Latitude: 06 - 25 - 2.8

Longitude : 99 - 45 - 29.7

Altitude : 74m

1.2 Address : Vacant Land

Kampung Teluk Ewa

Pulau Langkawi

Kedah Darul Aman.

SITE INFORMATIONS

Page 16: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 16/40

Site Informations

Survey Date : 14 June 2007

Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

Site: NWXXXX TELUK EWA

1.3 Site Details (Existing)

Type of Site : Land Cabin

Height of Building : N/A

Equipment Location : Cabin

Cabin Dimension : 7340 X 3680

Air Conditioning : 2 unit

Cable Ladder : YesLightning Protection : Yes

Type of Structure : 3 Legged Tubular

Boom Height : 3

Type of terrain : Hill

Access road : Earth / gravel / tar

Distance to main road : 1.5 km

Crane needed : No

Site Access Information : From Kuah Jetty, go towards Padang Lalang. After junction to

Padang Lalang, follow signboard to "Malayan Cement". Turn right

to quarters area and then turn left to tower area.

1.4 Contact Information

Celcom : Mizazuddin Bin Muhiyuddin

Telephone No. : 04-3973030 ext 1009

Fax No. : 04-3974040

Mobile No. : 019-5713060

Contractor Name : Mohd Nizam Mohd Noor

Telephone No. :Fax No. :Mobile No. : 019-3160900

Page 17: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 17/40

a

b

c

d

a

a

b √

c

a

b

c

d

e

f

Tripod 6mtr

GI Pipe 2 mtr

Aesthetic Pole

Maximum Load (A)

Maximum Module

CPS Source

Rectifier -48V Data

Equipment Power Source

AC Power Supply Data

Land Cabin

Land Outdoor

Rooftop Cabin

Tower

TNB

3 Phase AC

SBC

Genset

Single Phase AC

Rectifier +24V

Swichtec Model

√ Rectifier -48V

Free DC Breaker (32A)

6

9

14.2

3

√ NoYes

Merlin Gerin

NoYesFree DB Space For Additional Breaker

Free DC Breaker (60A)Free DC Breaker (32A)

Current Module

Free DC Breaker (60A)

Current Load (A)

Free DB Space for Additional Breaker

DC Breaker Type

Specify

Site ID

Site NameNWXXXX

TELUK EWA

√ H-Boom

X-Pol Bracket Antenna Mounting

Antenna Type Model & PartCode

Feeder Clamp

7/8”

2 in 1

Feeder Type

Type Of BTS

2308

Horizon OD Horizon Micro

3

E1 Type

E1 Owner

2206 2102

2302

E1 Status

Celcom

Available

Alcatel√4

2G Vendor

Yes √

√ Yes

Plinth

Structure

Fiber Optic

TX INFORMATION

Structure Height 45

Lease Line

Room Reno

No

No

√ YesMGB Space Available

Horizon ID

Utilise Free

Motorola

MBO3

2202

MOBILE INFORMATION

√ MicroWave

2106

MBI5

TM Maxis Digi

MBO1

Ericsson

a

Shelter Type

V-PoleX-Pole Kathrein 730370

NoFeeder Through Available

meters

7340X3680 Cabin Size

Room Reno Size

Plinth Size

MBI3

M4M

1 5/8”

3 in 1

GI Pipe Boom

Special Bracket

Maxis

TM

2

CME INFORMATION

Power Supply

Space Available

Type Of Structure

Room Reno Rooftop

Roof top Outdoor

Guyed Mast

GI Pipe 6mtr

Monopole

Mini Structure

1

Type Of Site

GENERAL INFORMATION

Site Owner

Celcom

Digi

Cabin

Shelter

Page 18: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 18/40

1

a

a

b

c

d

e

a

2

3

a

b

c Type

d

e

REMARKS:

1 Proposed new inlet and MGB outside cabin

2 To use 3 in 1 feeder clamp inside cabin to maximize space.

3 To rearrange existing 2G feeders inside cabin to free space for 3G feeders.

New (mtr)

New (mtr)

New (qty)

Additional Feeder Through (Qty)

Extend Existing(m)

Upgrade CPS System

Upgrade AC System

Cabin

Plinth New

Antenna Mounting New

Change Existing

Extend

Structure

TX ADDITONAL REQUIREMENTS

Refer to Tx BQ

MOBILE INSTALLATION METHODOLOGY

Swap 2G Eqpt. Rearrange EqptEquipment

Night

Specific Day

Equipment Mobilization

Lorry Crane

45 tonne

Day

Cable Gantry

No

Crane Requirements

Crane Access

Specific Times

20 tonne

Special crane

Open Roofing

Manpower

Special Tools/ Requirements

Qty

Specify

Antenna 2G

New Upgrade DB

Change to X-Pole

Add Module (Qty) Change Breaker (A) 20amp to32amp

Permit Requirements Yes

Change To Triband

Relocate Existing

MGB

Power Supply

CME ADDITONAL REQUIREMENTS

Genset

ADDITIONAL REQUIREMENTS FOR 3G IMPLEMENTATION

Change to Dual Band UMTS/1800Change to 1800 wideband

Shelter

TNB

b

Cable Ladder (Outdoor)

Page 19: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 19/40

Site Requirements

Survey Date : 14 June 2007

Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

Site: NWXXXX TELUK EWA

2.0

2.1 Exiting Equipment

Existing Equipment Type

No Of Cabinet

Configuration

Comments : 2 cells only

2.2 Exi sting A ntenna Data 2GMake

Height AGL (m)

Gain (dBi)

Antenna Band

Polarization

Comments : Existing Vpol antennas

2.3 Feeder Data 2G

Total no. of feeders (pcs)

Type of feeders

Feeder lengths (m) Tx

Rx

TOTAL

Comments : To rearrange feeders to free space for 3G fedeers inside cabin

2.4 Antenna Support Detail

Type of antenna support : H-BoomNo. of H-Boom : 3

No. of G.I. Pipe : 6 (only four boom in use)

Length of G.I. Pipes (m) : 3

Comments : V-Pol antennas

EXISTING 2G

900

N/ACell 3

45

Kathrein 730370Cell 1

Kathrein 730370Cell 2

N/A

248

124

16

45

Cell 3 TOTAL

N/A 6

900

124 124 N/A

62 62 N/A

62 62

N/A

N/A 124

7/8 "7/8 "

16

N/A

+-45 N/A+-45

N/A

2

Cell 1 Cell 2

2

Alcatel MBI5

1

2+2+0

Page 20: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 20/40

Site Name:

Site ID :

Existing 2G Site Name:

Existing 2G Site ID:

Co-locate Operator: Cluster No:

Version:

Lat (N-WGS 84- Decimal):

Long (E-WGS 84-Decimal):

BTS room Type: BTS Type:

BTS Configuration:

Transmission Type on site:

Cell Site RF Config uration

Cell ID

An tenn a Heigh t (mid. o f ant )

An tenn a Direc tion (d eg)Electrical Tilt

Mech. Tilt

Cable Length (m)

Cable Type (inch)

Technical Site Survey Report (Existing Antenna System Locations)TELUK EWA Survey Date: 14/06/2007

Sector 3

06 - 25 - 2.8

99 - 45 - 29.7 74

Sector 1

Others:

Sector 1 :

Phase:

Ams l(m):

Sector 2

Main road towards Datai, Kampung EwaSector 2 :

Sector 3 :N/A

La Farge Cement factory, Petronas oil tank area, main road towards Padang Lalang and jetty.Comment/ Problem:

Structure type 3 legged tubular

3 3

H-Boom

Height (m)Mount

Type H-Boom

No of Pole/ Tripod 2 2

62

3 legged tubular

0 0

7/8" 7/8"

0 0

62

45 45

40° 200°

Ant enna TypeModel Number 730370 730370

Beam width (deg) 65 65

2+2+0

Cabin Alcatel MBI5

ERICSSON

NWXXXX Area: Langkawi

N/A

2

NWXXXX Building Height(m): -

TELUK EWA Structure Height(m): 45

Page 21: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 21/40

Site Requirements

Survey Date : 14 June 2007

Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

Site: NWXXXX TELUK EWA

3.0

3.1 Feeder Data

Total no. of feeders (pcs)

Type of feeders

Feeder lengths (m)

Comments : All cells need MHA

3.2 CABLING

Cable required

Comments :

3.3 Antenna Support Detail

Type of antenna support : Special bracket

No. of H-Boom : -No. of G.I. Pipe : 3

Length of G.I. Pipes (m) : 2m

Other Special Bracket :

Comments : The antennas located below existing 2G antennas.

60

60

120 360TOTAL 120120

60

Cable Lug / 35mm

Length Needed

7m

1 5/8" 1 5/8"1 5/8"

2 62

Cell 1

2

Cell 3Cell 2 TOTAL

180

Rx 60 180

60

60

Tx

NEW SITE REQUIREMENTS

7m

DDF to DF Coax / 3C 2.5V Siemen Male 5m

Node B to MGB Grounding / 35mm

Cabl e Cabl e ty pe / s ize Con nec tor t yp e / si ze

Node B E1 to DF Coax / 3C 2.5V -

Node B to Breaker Grounding / 35mm Cable Lug / 35mm 12m

Page 22: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 22/40

Site Requirements

Survey Date : 14 June 2007

Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

Site: NWXXXX TELUK EWA

3.4 OTHERS

Comments :

3.5 POWER SUPPLY SYSTEM

Rectifier

Make Link Model Vout Iout

Battery Installed : Power Lift L400

Capacity : 6V-162Ah

Banks : 2

Type / Model : Power Lift L400

Comments :

Breaker

Used: 7

Required:

Used:

Free:

Required: 1

Free: 9

No

No

No

Yes

No

Yes below the proposed inlet

Yes Huawei inlet

Capacity

Yes

14.254.4E22

Lightning Protection

CommentExisting Required

Yes No

BTS Location Cabin Cabin

Cable Inlet

AC Ear th ing Busbar Yes

DC Earthing Busbar Yes

MGB Yes

Swichtec

Cable Ladder

Cabin Size 7340X3680

Plinth Size N/A

No

Page 23: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 23/40

Site Name:Site ID :Existing 2G Site Name:Existing 2G Site ID:Co-locate Operator: Cluster No:

Version:Lat (N-WGS 84- Decimal):Lon g (E-WGS 84-Decimal):

Node B room Type: Node B Type:Node B Configuration:

Transmission Type on site:

Cell Site RF Configuration

Ant enna Heigh t (mi d. o f ant ) Ant enna Direc tio n (deg)Electrical TiltMech. TiltCable Length (m)

Cable Type (inch)

MHA (Y/N)

06 - 25 - 2.899 - 45 - 29.7

Others:

Sector 2 : To cover main road to Padang Lalang, Lafarge Factory area, Lafarge Perumahan B,Kraftangan, kampung area

Sector 3 :To cover main road to Datai, Kampung Tlk Ewa, kampung area

Comment/ Problem:

Sector 1 :To cover main road to Padang Lalang, Lafarge Factory area, Lafarge Perumahan A, PetronasPoint, Jetty Tlk Ewa

1Y Y Y

BOOMHeight (m) 2 2 2Mount

Type BOOM BOOM

No of Pole/ Tripod 1 1

Structure type 3 legged tubular 3 legged tubular 3 legged tubular

60 60 60

1 5/8" 1 5/8" 1 5/8"

2 2 20 0 0

42.5 42.5 42.550° 120° 210°

APXV18-206516Beam width (deg) 65 65 65

Ant enna Type Model Number APXV18-206516 APXV18-206516

Sector 1 Sector 2 Sector 3

1+1+1

ERICSSON

Ams l(m): 74

Cabin HUAWEI Indoor

Phase: 2

NWXXXX Area: LangkawiN/A

NWXXXX Building Height(m): -TELUK EWA Structure Height(m): 45

Technical Site Survey Report (Proposed Antenna Location)

TELUK EWA Survey Date: 14/06/2007

Page 24: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 24/40

SECTORIAL RF VIEW

Sector 1 50° degree

Sector 2 120° degree

Sector 3 210° degree

NEW SITE RF PHOTO

La Farge Cement Factory

Petronas Oil Tankers

Housing

Housing area

Kampung Ewa Main road to Datai

Page 25: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 25/40

PANORAMIC VIEW

View at 0°

View at 40°

View at 80°

NEW SITE RF PHOTO

Page 26: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 26/40

PANORAMIC VIEW

View at 120°

View at 160°

View at 200°

NEW SITE RF PHOTO

Page 27: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 27/40

PANORAMIC VIEW

View at 240°

View at 280°

View at 320°

NEW SITE RF PHOTO

Page 28: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 28/40

Existing Site Pictures Survey Date : 14 June 2007

Si te: NWXXXX TELUK EWA

Photo 1 : Site View

SITE PICTURES

Page 29: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 29/40

Existing Site Pictures Survey Date : 14 June 2007

Si te: NWXXXX TELUK EWA

SITE PICTURES

Photo 2: Antenna Location.

.

Photo 3: BTS Location

Page 30: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 30/40

Existing CME Survey Date : 14 June 2007

Si te: NWXXXX TELUK EWA

Photo 1 : Existing DB

Photo 2: Rectifier

SITE PICTURES

Page 31: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 31/40

Existing CME Survey Date : 14 June 2007

Si te: NWXXXX TELUK EWA

SITE PICTURES

Photo 3: Battery

Photo 4: Existing MGB.

at top of tower

at bottom of tower

Page 32: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 32/40

Existing CME Survey Date : 14 June 2007

Si te: NWXXXX TELUK EWA

SITE PICTURES

Photo 5:MGB inside Cabin

Photo 6 : Breaker

Page 33: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 33/40

Existing Tx Survey Date : 14 June 2007

Si te: NWXXXXTELUK EWA

Photo 1 : Microwave.

Tx Rack

SITE PICTURES

Page 34: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 34/40

New Requirement Survey Date : 14 June 2007

Si te: NWXXXX

Photo 1 : Node B Location

Photo 2 : proposed new Feeder Inlet and MGB

SITE PICTURES

Page 35: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 35/40

New Requirement Survey Date : 14 June 2007

Si te: NWXXXX

SITE PICTURES

Photo 3 : Proposed DDF Box Location beside Tx Rack

Photo 4 : To rearrange existing feeder to free up space for 3G feeders

Page 36: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 36/40

New Requirement Survey Date : 14 June 2007

Si te: NWXXXX

SITE PICTURES

Photo 5 : Proposed Antenna Location

Photo 5 : Site Top view

Celcom

Digi

Page 37: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 37/40

BILL OF QUANTITY SITE NWXXXX

NO TYPE ITEMS ART NO. PACKING REQUEST SUPPLY

IRON WORK Fill in your requested item(s)1 SPECIAL BRACKET SET

2 6m Tripod NA SET

3 6m BOOM N/A PC

4 WALL BRACKET N/A SET

POWER / RF CABLES & ACCESSORIES1 Power Cable METER

2 METER

3 AC ARMOURED CABLE, 4CORE, 16mm AC.ARM.4C.16mm METER

4 PVC/PVC AC CABLE 5 CORE, BLACK, 10mm 5C/10mm METER

5 CABLE TIE 4" (WHITE) CBL. TIE -W-IND-4" PC

6 CABLE TIE 8" (WHITE) CBL. TIE -W-IND-8" PC7 CABLE TIE 14" (WHITE) CBL. TIE -W-IND-14" PC

8 CABLE TIE 14" (BLACK) CBL. TIE -W-OUD-14" PC

9 7/8" COAXIAL CABLE EC5-50 METER

10 1/2" COAXIAL CABLE LDF4-50A METER

11 TX JUMPER CABLE (716M - 716M), 2 MTR F4A-PDMDM-2M PC

12 RX JUMPER CABLE (716M - NM), 2 MTR F4A-PNMDM-2M PC

EARTHING SYSTEM 1 COPPER BARE WIRE, 35MM, MULTI STRAND N/A METER

2 ANDREW CONNECTOR EARTHING KIT (INDOOR) 244495 PC

3 ANDREW FEEDER EARTHING KIT (OUTDOOR) SGL5-06B1 PC

CONNECTORS1 RFS ANGLE ADAPTER N-TYPE (MALE TO FEMALE) 15852401 PC

2 H+S BNC CONN. (JACK FULL), 75 OHM, FOR RG59 21BNC-75-4-4 PC

3 RFS 7/16 FEMALE CONNECTOR FOR 7/8" CABLE 15570560 PC

4 H+S N-MALE CONNECTOR FOR 7/8" CABLE 11N-50-23-10 PC5 H+S N-MALE CONNECTOR FOR 1/2" CABLE 11N-50-12-10 PC

6 H+S TNC-MALE TO BNC FEMALE ADAPTOR 33-TNC-BNC50-1 PC

7 H+S N-MALE TO N-MALE ADAPTOR 32N-50-0-2 PC

8 RFS FEEDER COUPLING (SPLICER) 155 730 60 PC

MISCELLANEOUS ITEMS1 AC TRUNKING, 2" X 2", ORANGE C/W ACCESS N/A PC

2 METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS N/A PC

3 CABLE LUG 35MM N/A PC

4 CABLE LUG 150MM N/A PC

5 C-CLAMP (C-TYPE) COMPRESSED FOR 35MM N/A PC

6 3M COOL SHRINK N/A PC

7 CABLE GLAND (FEEDER THROUGH) N/A PC

8 3M ELECTRICAL TAPE, SUPER 33+, 3/4 X 66' 6132 PC

9 3M ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60" 15140 PC

10 FEEDER CLAMP (2 IN 1) N/A PC11 FEEDER CLAMP (3 IN 1) N/A PC

12 PVC TRUNKING (GREY), 4" X 2" X 1.8M 7 LENGTH

13 SYW RAWL PLUG (M6X450MM) PC

14 SYW RAWL PLUG (M12) with rod PC

15 SYW RAWL PLUG (M12) w/o rod PC

TOTAL COST (FOR INSURANCE PURPOSES)

Requester: _________________________ Checked By: _________________________

(SIGNED & STAMPED) (SIGNED & STAMPED)

TELUK EWA

Page 38: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 38/40

A. SITE DETAILS

TELUK EWA

1 . X OWN TRANSMISSION SOLUTION

X MICROWAVE VSAT FIBER OPTIC

REMARKS

REMARKS :

2 . LEASED LINE

TM LEASED LINE POI/POP : . 2 E1

3 E1

REMARKS :

C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.

1 . CME

TRM/TOC DC POWER SUPPLY ( Pls specify : )

TRIPOD SHELTER ( Pls specify : )

PLINTH DDF

REMARKS :

Prepared by,

E1 SHARING ( MAXIS / DIGI) POI/POP : .

SITE B

TM PDG LLG

INSTALLED FREEUSED RESERVED

TLK EWA

SITE A

SITE NAMESITE IDRNC HOMENODE B TYPE

TSS TRANSMISSION CHECKLIST FOR 3G

Isriadi Ngaliman 019-3116551

B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.

REGIONSURVEY BYSURVEY DATE

NORTHERNMOHD NIZAM NWXXXX

Verify by, (Name, TX Region. HP num)

14/06/2007INDOOR

Page 39: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 39/40

Page 40: SDP 3G SR Teluk Ewa

8/19/2019 SDP 3G SR Teluk Ewa

http://slidepdf.com/reader/full/sdp-3g-sr-teluk-ewa 40/40