MB-L2-C08-4769/02 ---------------------------------------------------------------------------------------------------------------------------------------------- 1 PROJEKT BUDOWLANY PIERWSZEGO ETAPU REALIZACJI ODCINKA ZACHODNIEGO II LINII METRA W WARSZAWIE STACJA C08 PROJEKT ARCHITEKTONICZNO – BUDOWLANY TOM II /3 KONSTRUKCJA OBLICZENIA STATYCZNO – WYTRZYMALOŚCIOWE (WYCIĄG Z OBLICZEŃ ) STRON – 121 MGR INś. FRANCISZEK R. MISIUREK MGR INś. EWA ZAWADA MGR INś. URSZULA GAWLEWICZ

Transcript of OBLICZENIA STATYCZNO – WYTRZYMAŁO ŚCIOWEjjb.waw.pl/04_konstrukcja/MB-L2-C08-4769-02.pdfTOM II /3...

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    1

    PROJEKT BUDOWLANY PIERWSZEGO ETAPU REALIZACJI ODCINKA

    ZACHODNIEGO II LINII METRA W WARSZAWIE

    STACJA C08

    PROJEKT ARCHITEKTONICZNO – BUDOWLANY

    TOM II /3

    KONSTRUKCJA

    OBLICZENIA STATYCZNO – WYTRZYMAŁO ŚCIOWE (WYCIĄG Z OBLICZEŃ )

    STRON – 121

    MGR INś. FRANCISZEK R. MISIUREK

    MGR INś. EWA ZAWADA

    MGR INś. URSZULA GAWLEWICZ

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    2

    SPIS TREŚCI

    1. ZAŁOśENIA DO OBLICZEŃ ...........................................................................................................3

    2. OBLICZENIE ŚCIAN SZCZELINOWYCH W FAZACH REALIZACJI............. .................................4

    2.1 Obliczenie pali ścianki berli ńskiej zabezpieczaj ącej wykop powy Ŝej spodu wie ńca stropu zewn ętrznego stacji ......................................................................................................................4

    2.2 Obliczenia ściany szczelinowej stacji - w przekroju HALI PERONO WEJ ( Hm 91,00) ........... ………………………………………………………………..………………………………5

    2.3 Obliczenia ściany szczelinowej stacji - w przekroju ANTRESOLOWY M ( Hm 90.38 )............14

    3. STATECZNOŚĆ NA WYPÓR KONSTRUKCJI STACJI....................... .........................................22

    4. OBLICZENIA STATYCZNE I WYMIAROWANIE KONSTRUKCJI STA CJI W FAZIE EKSPLOATACJI ....................................... ....................................................................................22

    4.1 Zebranie obci ąŜeń na stropy stacji ......................................................................................................24 4.1.1 Zebranie obciąŜeń na strop górny stacji…………………………………………………. 24 4.1.2 Zebranie obciąŜeń na strop pośredni stacji (technologiczny) w części peronowej…. 25 4.1.3 Zebranie obciąŜeń na strop pośredni stacji (technologiczny) w częściach

    głowicowych…………………………………………………………………………………… 28 4.1.4 Zebranie obciąŜeń na strop dla komunikacji - pośredniego stacji w częściach

    głowicowych……………………………………………………………………………………. 28 4.1.5 Zebranie obciąŜeń na strop peronowy stacji…………………………………………… 29 4.1.6 Zebranie obciąŜeń na płytę denną stacji………………………………………………… 30 4.1.7 Obliczenie parć i odporów………………………………………………………………… 30

    4.2 Hala peronowa – Obliczenia statyczne i wymiarowanie ................................................................31 4.2.1 Hala peronowa – Obliczenia statyczne………………………………………………….. 31 4.2.2 Hala peronowa – Wymiarowanie elementów konstrukcji……………………………… 56

    4.3 Hale głowicowe – Obliczenia statyczne i wymiarowani e...............................................................82 4.3.1 Hala głowicowa – Obliczenia statyczne…………………………………………………. 82 4.3.2 Hala głowicowa – Wymiarowanie elementów konstrukcji……………………………… 109

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    3

    1. ZAŁOśENIA DO OBLICZEŃ Normy:

    1 . PN-EN 1990 :2004 Eurokod: Podstawy projektowania konstrukcji.

    2 . PN-EN 1990 :2004/A1(:2008) Eurokod: Podstawy projektowania konstrukcji.

    3 . PN-EN 1991-2:2007 Eurokod 1: Oddziaływania na konstrukcję. ObciąŜenia ruchome

    mostów.

    4 . PN-EN 1991-1-1:2004 Eurokod 1: Oddziaływania na konstrukcje. Część 1-1: Oddziaływania

    ogólne. CięŜar objętościowy, cięŜar własny, obciąŜenia uŜytkowe w

    budynkach.

    5 . PN-EN 1992-1-1:2008 Eurokod 2: Projektowanie konstrukcji z betonu. Część 1-1: Reguły

    ogólne i reguły dla budynków.

    6. PN-91/S-10042 Obiekty mostowe. Konstrukcje betonowe, Ŝelbetowe i spręŜone.

    Projektowanie.

    7. PN-B-03264:2002 Konstrukcje betonowe, Ŝelbetowe i spręŜone -- Obliczenia statyczne i

    projektowanie

    8 . PN-EN 1997-1:2008 Eurokod 7: Projektowanie geotechniczne

    9 . PN-EN 1991-1-2:2006 Eurokod 1: Oddziaływania na konstrukcje. Część 1-2: Oddziaływania

    ogólne. Oddziaływania na konstrukcje w warunkach poŜaru.

    10 . PN-EN 1991-1-2:2008 Eurokod 2: Projektowanie konstrukcji z betonu. Część 1-2: Reguły

    ogólne. Projektowanie z uwagi na warunki poŜarowe.

    11 . PN-EN 1991-1-2:2008/AC Dotyczy PN-EN 1991-1-2:2008. Eurokod 2: Projektowanie

    konstrukcji z betonu. Część 1-2: Reguły ogólne. Projektowanie z uwagi

    na warunki poŜarowe.

    Inne

    1. Rozporządzenie Ministra Transportu i Gospodarki Morskiej z dnia 30 maja 2000r w

    sprawie warunków technicznych, jakim powinny odpowiadać obiekty inŜynierskie i ich

    usytuowanie. (Dz.U. Nr 63, z dnia 3 sierpnia 2000r. , poz.735).

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    4

    2. OBLICZENIE ŚCIAN SZCZELINOWYCH W FAZACH REALIZACJI

    2.1 OBLICZENIE PALI ŚCIANKI BERLI ŃSKIEJ ZABEZPIECZAJ ĄCEJ WYKOP POWYśEJ

    SPODU WIEŃCA STROPU ZEWNĘTRZNEGO STACJI

    Poziom wierzchu pali ścianki berlińskiej ( poz. wykopu wstępnego )–30.60 m

    Poziom utwierdzenia pali ścianki w ścianach szczelinowych (poz. Spodu wieńca ) – 27.50 m

    Wysokość wspornika pali -30.60-27.50 = 3.10m

    Grunt na wysokości pala :

    - nasyp do głębokości 2.50 m od p.t. – φ=23o , γ = 19 kN/m3 , Ka= 0.438

    - pyły + namuły do głębokości 4.50m - φ=30o , γ = 18 kN/m3 , c=18, Ka= 0.333

    Pale ścianki berlińskiej zamocowane ( zabetonowane) w ścianach szczelinowych.

    Reakcje od pala na ścianę szczelinową: Mα = 107 kNm/m , Tα = 80 kN/m

    ObciąŜenie pala przy rozstawie 1.50m -------Mmax = 1.5 x 107 =160.50 x 1.3 = 208 kNm/ pal

    ------Tmax = 1.5 x 80 = 120 kN x 1.3 = 156 kN / pal

    Sprawdzenie przekroju pala:

    σ = M / W ≤ R → W = M / R → gdzie W- niezbędny wskaźnik wytrz. dla pala

    W= 208 / 215 (stal-St3Sx) = 0.967 = 967 cm3 - I 400 PE =W=1163 cm3

    ObciąŜenie przy rozstawie pali 2.0 m : Mmax = 2.0 x 107 = 214 x 1.3 = 278 kNm/ pal

    Tmax = 2.0 x 80 = 160 kN x 1.3 = 208 kN / pal

    W= 278 / 215 (stal-St3Sx) = 1.293 = 1293 cm3 - I 400 =W=1460 cm3

    Przyjąć pale min. I 400 w rozstawie co ok. 2.0 m

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    5

    2.2 OBLICZENIA ŚCIANY SZCZELINOWEJ STACJI - W PRZEKROJU HALI PERO NOWEJ

    ( HM 91,00 )

    ZałoŜenia do obliczeń :

    - warunki geotechniczne – wg opracowania geotechnicznego – przekrój Hm-91.00

    - zagłębienie stacji wg profilu stacji

    - rzędna terenu - 31.60m

    - wierzch stropu – 29.30 m

    - PGS na rzędnej 17.00 m

    - poziom wody gruntowej – wg geotechniki – 27.00m

    - załoŜono wykop wstępny głębokości 1.00m – to poziom realizacji murków

    prowadzących

    - najbliŜsza zabudowa to budynek Płocka 13 ,

    poziom posadowienia budynku -3.10 p.p.t.

    obciąŜenie w poziomie posadowienia budynku przyjęto –130 kN/m2

    - geometria przekroju wg rysunku – przyjęto ściany szczelinowe grubości 1.0 m.

    - przyjęto stropową metodę realizacji stacji .

    - przyjęto zagłębienie ścian szczelinowych do poziomu ok.2.0 m poniŜej stropu utworów

    plioceńskich , tak by zagwarantować szczelność oraz stateczność dna wykopu w kaŜdej

    fazie realizacji .

    - realizacja kaŜdego poziomu głębienia będzie poprzedzona obniŜeniem poziomu wody w

    obrysie ścian szczelinowych do poziomu 2m poniŜej poziomu projektowanego w tej fazie

    wykopu.

    - w poziomie osi tuneli tarczowych zaprojektowano dodatkową rozporę czasową z rur

    stalowych Φ 711/12.5 mm , rozstaw rozpór ok. 3.0 m .

    - strop zewnętrzny jest monolitycznie związany ze ścianami za pośrednictwem wieńca .

    - pozostałe rozpory ścian szczelinowych to rozparcia przegubowe.

    Geometria rozpór :

    1. strop zewnętrzny EF = 1.1 x 1.0 x 31x106 = 3.41 x 107 kN/m

    EJ = (1.0 x 1.1 3/ 12) x 31x 106 = 3.44 x 106 kNm2/m.

    2. strop pośredni EF = 0.5 x 1.0 x 31 x 106 =1.55 x 107 kN/m

    EJ = (1.0 x 0.5 3/ 12) x 31x 106 = 3.23 x 105 kNm2/m.

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    6

    3. rozpora stalowa EF = 0.0274 x 2x108 =5.48x 106 /3.0m = 1.83x106 kNm/m

    EJ = 0.00167 x 2 x108 = 3.35 x 105 /3.0m = 1.12 x 105 kNm2/m.

    4. płyta denna EF = 1.2 x 1.0 x 31x106 = 3.72 x 107 kN/m

    EJ = (1.0 x 1.2 3/ 12) x 31x 106 = 4.46 x 106 kNm2/m.

    W fazach realizacji górę ścianę obciąŜono siłami reakcji od oddziaływania ścianki berlińskiej

    utrzymującej wykop powyŜej stropu zewnętrznego stacji .

    W fazie docelowej w miejscu zamocowania ściany w stropie zewnętrznym wprowadzono

    moment i siły wewnętrzne w ścianie wyliczone z ramy poprzecznej .

    Obliczenia pracy ściany w fazach realizacji i docelowej przeprowadzono programem GGu-

    Retain.

    Obliczenia dla faz realizacji przeprowadzono dla parcia czynnego działającego na ścianę , a w

    fazie docelowej dla parcia spoczynkowego.

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    7

    FAZA 1

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    8

    FAZA 2

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    9

    FAZA 3

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    10

    FAZA 4

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    11

    FAZA DOCELOWA

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    12

    WYMIAROWANIE

    1/ Mmax = 1394 x 1.3 x 1.2 = 2175 kNm/m

    Nodp = 890 x 1.3 x 1.2 = 1388 kN/m

    2 / Mmax = 975 x 1.3 x 1.2 = 1521 kNm/m

    Nodp = 473.5 x 1.3 x 1.2 = 739 kN/m

    Beton B30

    fGc,cube = 30,00 MPa fck = 25,00 MPa fctk = 1,80 MPa fctm = 2,60 MPa

    fcd = 16,70 MPa fctd = 1,20 MPa f*cd = 13,90 MPa Ecm = 31000,00 MPa

    Stal A-IIIN (RB 500) Ŝebrowana

    fyk = 500,00 MPa fyd = 420,00 MPa ftk = 550,00 MPa ξlim = 0,625

    Otulenie obliczeniowe = 0,100 m, Maksymalny wymiar kruszywa = 0,016 m

    Współczynnik skutków zniszczenia: αcc = 1,00

    Zbrojenie :

    odstępy osiowe góra = 0,100 m φg = 32

    odstępy osiowe dół = 0,100 m φd = 32

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    13

    Siły i długości obliczeniowe :

    —————————————————————————————————

    NSd [kN] MSd [kNm] NSd,lt [kN] lo [m]

    —————————————————————————————————

    1 1388,00 2175,00 890,00 1,00

    2 739,00 1521,00 473,00 1,00

    —————————————————————————————————

    Mimośród niezamierzony: eax = 0,033 m

    Współczynnik pełzania: φ∞,to = 1,800

    Wyniki :

    ———————————————————————————————————

    MRd min [kNm] MSd min [kNm] MSd max [kNm] MRd max [kNm]

    ———————————————————————————————————

    1 -3220,00 2130,00 2220,00 3220,00

    2 -2970,00 1500,00 1550,00 2970,00

    ———————————————————————————————————

    Największa siła przy ściskaniu : NRd max = 22900,00 kN

    Największa siła przy rozciąganiu : NRd min = -6690,00 kN

    Stopień zbrojenia przy ściskaniu:

    (As1+As2)/Ac = 1,608 % ρmin = 0,300 %

    SG ZARYSOWANIA:

    Maksymalna szerokość rys od obciąŜeń długotrwałych : wk = 0,33 mm

    dla : Nlt = 890,00 kNm Mlt = 2175,00 kNm

    Współczynnik pełzania : φ∞,to = 1,800

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    14

    2.3 OBLICZENIA ŚCIANY SZCZELINOWEJ STACJI - W PRZEKROJU ANTRESOLOWY M (

    HM 90.38 )

    ZałoŜenia do obliczeń :

    - warunki geotechniczne – wg opracowania geotechnicznego – przekrój Hm-90.38

    - zagłębienie stacji wg profilu stacji

    - rzędna terenu - 31.54m

    - wierzch stropu – 29.93 m

    - PGS na rzędnej 17.13 m

    - poziom wody gruntowej – wg geotechniki – 27.00m

    - załoŜono wykop wstępny głębokości 1.00m – to poziom realizacji murków

    prowadzących

    - najbliŜsza zabudowa to budynek Płocka 13 w odległości 9.0 m

    poziom posadowienia budynku -3.10 p.p.t.

    obciąŜenie w poziomie posadowienia budynku przyjęto –130 kN/m2

    - geometria przekroju wg rysunku – przyjęto ściany szczelinowe grubości 1.0 m.

    - przyjęto stropową metodę realizacji stacji .

    - przyjęto zagłębienie ścian szczelinowych do poziomu ok.2.0 m poniŜej stropu utworów

    plioceńskich , tak by zagwarantować szczelność oraz stateczność dna wykopu w kaŜdej

    fazie realizacji .

    - realizacja kaŜdego poziomu głębienia będzie poprzedzona obniŜeniem poziomu wody w

    obrysie ścian szczelinowych do poziomu 2m poniŜej poziomu projektowanego w tej fazie

    wykopu.

    - w poziomie osi tuneli tarczowych zaprojektowano dodatkową rozporę czasową z rur

    stalowych Φ 711/12.5 mm , rozstaw rozpór ok. 3.0 m .

    - strop zewnętrzny jest monolitycznie związany ze ścianami za pośrednictwem wieńca .

    - pozostałe rozpory ścian szczelinowych to rozparcia przegubowe.

    - strop w poziomie -4.10 betonowany na końcu , po płycie dennej.

    Geometria rozpór :

    3. strop zewnętrzny EF = 1.1 x 1.0 x 31x106 = 3.41 x 107 kN/m

    EJ = (1.0 x 1.1 3/ 12) x 31x 106 = 3.44 x 106 kNm2/m.

    4. strop pośredni EF = 0.4 x 1.0 x 31 x 106 =1.24 x 107 kN/m

    EJ = (1.0 x 0.4 3/ 12) x 31x 106 = 1.65 x105 kNm2/m.

    3. rozpora stalowa EF = 0.0274 x 2x108 =5.48x 106 /3.0m = 1.83x106 kNm/m

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    15

    EJ = 0.00167 x 2 x108 = 3.35 x 105 /3.0m = 1.12 x 105 kNm2/m.

    5. płyta denna EF = 1.2 x 1.0 x 31x106 = 3.72 x 107 kN/m

    EJ = (1.0 x 1.2 3/ 12) x 31x 106 = 4.46 x 106 kNm2/m.

    W fazach realizacji górę ścianę obciąŜono siłami reakcji od oddziaływania ścianki berlińskiej

    utrzymującej wykop powyŜej stropu zewnętrznego stacji .

    W fazie docelowej w miejscu zamocowania ściany w stropie zewnętrznym wprowadzono

    moment i siły wewnętrzne w ścianie wyliczone z ramy poprzecznej .

    Obliczenia pracy ściany w fazach realizacji i docelowej przeprowadzono programem GGu-

    Retain.

    Obliczenia dla faz realizacji przeprowadzono dla parcia czynnego działającego na ścianę , a w

    fazie docelowej dla parcia spoczynkowego.

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    16

    FAZA 1

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    17

    FAZA 2

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    18

    FAZA 3

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    19

    FAZA 4

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    20

    FAZA 5

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    21

    FAZA 5 DOCELOWA

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    22

    3. STATECZNOŚĆ NA WYPÓR KONSTRUKCJI STACJI( ŚCIANY SZCZELINOWE W WARSTWIE IŁÓW)

    Obliczenie dla 1mb konstrukcji na długości hali peronowej . SIŁY UTRZYMUJĄCE KONSTRUKCJĘ

    1. zasypka ----------------------------------------------2.30 x 19.0 x22.80 = 996.00 kN/mb 2. strop zewnętrzny --------------- 0.5x(1.2 +1.0) x25 =27.50 x 22.80 = 627.00 kN/ mb 3. strop pośredni -----(0.5x 18.5 + 1.0x0.9+2x1.0x0.7+0.5x0.9/6)x25 = 313.00 kN/mb 4. peron ze ści. podperonia 0.2x10,88x25 + 2.20x0.25x2x25 = 54,4+27.5 = 81,90 kN/mb 5. słupy -----------------------------------[0.8x0.8 x (5.0+6.5) ] x 25 /6.0 = 30.66 kN/mb 6. płyta denna ------------------------------1.2x2x5.35 +2x1.0x5.45 )x25 = 593.00 kN/mb 7. ściany monolityczne---------------------(2x0.3x5.0 + 2x05x5.9) x25 = 222.50 kN/mb 8. ściany szczelinowe -------------------------------------------2x46.0 x25 = 2300.00 kN/mb 9. bareta [(2,8x1,0x10,0)/6]x25=116,67 kN/mb --------------------------------------------------------------------------- SIŁY UTRZYMUJĄCE U = 5280 kN/mb Bez zasypki Ubz = 4284 kN/mb 1m zasypki Uz1m = 4717 kN/mb SIŁY WYPORU KONSTRUKCJI

    W = 22.80x12.30x10 + 2x1.0x33,5.0x10+[(2,8x1,0x10)/6]x10 =2805+670+47 = 3522 kN/mb

    Dla odkopanej stacji:

    n= 0.9 U/1.1W = 0.9 x 4284 /1.1x 3522 =0,99 1.05

    Dla stacji z zasypką :

    n =0.9x5280 / 1.1x3522 = 1,22 > 1. 05

    Dopuszczalne jest jedynie cz ęściowe odkopanie korpusu stacji

    Stateczność na wypór konstrukcji stacji(Wariant z przegroda antyfiltracyjna jet-Grouting)

    Obliczenie dla 1mb konstrukcji na długości hali peronowej . Spód ścian szczelinowych ~21,0 m poni Ŝej płyty dennej SIŁY UTRZYMUJĄCE KONSTRUKCJĘ

    1. zasypka ----------------------------------------------2.30 x 19.0 x22.80 = 996.00 kN/mb 2. strop zewnętrzny --------------- 0.5x(1.2 +1.0) x25 =27.50 x 22.80 = 627.00 kN/ mb 3. strop pośredni -----(0.5x 18.5 + 1.0x0.9+2x1.0x0.7+0.5x0.9/6)x25 = 313.00 kN/mb 4. peron ze ści. podperonia ------- 0.2x10,88x25 + 2.20x0.25x2x25 = 54,4+27.5 = 81,90

    kN/mb 5. słupy -----------------------------------[0.8x0.8 x (5.0+6.5) ] x 25 /6.0 = 30.66 kN/mb 6. płyta denna ------------------------------1.2x2x5.35 +2x1.0x5.45 )x25 = 593.00 kN/mb 7. ściany monolityczne---------------------(2x0.3x5.0 + 2x05x5.9) x25 = 222.50 kN/mb 8. ściany szczelinowe -------------------------------------------2x34,5 x25 = 1725.00 kN/mb 9. bareta [(2,8x1,0x10,0)/6]x25=116,67 kN/mb --------------------------------------------------------------------------- SIŁY UTRZYMUJĄCE U = 4705 kN/mb Bez zasypki Ubz = 3709 kN/mb

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    23

    1,5m zasypk i Uz1,5m = 4358kN/mb SIŁY WYPORU KONSTRUKCJI

    W = 22.80x12.30x10 + 2x1.0x21.0x10++[(2,8x1,0x10)/6]x10 =2805+420+47 = 3272 kN/mb

    Dla odkopanej stacji:

    n= 0.9 U/1.1W = 0.9 x 3709 /1.1x 3272=0,93 < 1.0

    Dla stacji z 1,5m zasypką

    n= 0.9 U/1.1W = 0.9 x 4358 /1.1x 3272 =1,09>1.05

    Dla stacji z zasypką :

    n =0.9x4705 / 1.1x3272 = 1,17 > 1. 05

    Dopuszczalne jest jedynie częściowe odkopanie korpusu stacji

    Obliczenia stateczno ści dna wykopu

    „Korek „- kolumn Jet zaprojektowano w obrębie wykopu okolonego ścianami szczelinowymi

    ~ 2 m pod jego dnem. Grubość warstwy wynika z normowego warunku stateczności dna :

    n = 0.9 x U / W ≥ 1 , gdzie :

    U – cięŜary (kN ) utrzymujące ( balastujące ) warstw gruntu nad przeponą i przepony;

    W = ( Hw + X ) x 10 - wypór wody ( kN ) ;

    gdzie ∆ Hw - wysokość parcia wody- róŜnica rzędnych maksymalnego poziomu wody ~ 28.0

    m n.”0” Wisły gruntowej poza obiektem i rzędnej wierzchu „ korka”.

    X- niezbędna miąŜszość korka ( m ) cięŜar wody γ = 10 kN/m 3 , - miąŜszość i cięŜar

    warstwy piaszcz. pod dnem (nad korkiem ) Hp= 2.0 m; γ = 19 kN/m 3

    -cięŜar iniekcyjnej warstwy Jet γ = 22 kN/m 3 - γ = 23 kN/m 3 ,

    Dane :maksymalna rzędna wody gruntowej - 28.0 m n.”0” Wisły

    rzędna wierzchu „korka” - ~12. 80 m n.”0” Wisły

    stąd ; ∆ Hw = 28.0 – 12.80 = 15,20 m

    Niezbędną miąŜszość warstwy korka określono z równania :

    ( ∆ Hw + X ) x 10 < 0.9 x ( Hp x 19 + X x 22 ) – stąd niezbędna „miąŜszość ‘ korka

    ~12.0 m (dla γ = 22 kN/m 3 ) i ~ 11 m (dla γ = 23 kN/m 3 ) .

    W tej sytuacji racjonalnym ekonomicznie i bezpieczniejszym rozwiązaniem jest rezygnacja z

    wykonania przepony i wydłuŜenie ścian szczelinowych i zagłębienie ich w zalegającą ~10 – 15

    m, poniŜej warstwę iłów.Wybór metody naleŜy do Wykonawcy–parz zapisy w p. 2

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    24

    4. OBLICZENIA STATYCZNE I WYMIAROWANIE KONSTRUKCJI STACJI W FAZIE EKSPLOATACJI

    4.1 ZEBRANIE OBCIĄśEŃ NA STROPY STACJI

    4.1.1 Zebranie obci ąŜeń na strop górny stacji

    Zebranie obci ąŜeń wg PN-EN 1991-2

    ZałoŜenia : Beton B37, Stal A-IIIN

    ObciąŜenie ObciąŜenia

    charakterystyczne

    Wsp.

    obc.

    ObciąŜenia

    obliczeniowe

    1. CięŜar własny konstrukcji

    (oblicza program ABC –

    Płyta )

    (1,2+1,0)x05x25 = 27,5 kN/m2 1,35 37,12kN/m2

    2. ObciąŜenia warstwami

    zasypkowymi, ulicznymi i

    izolacyjnymi na stropie

    a. część peronowa

    b. część głowicowa

    2,40 x 19 = 45,6 kN/m2

    2,00 x 19 = 38,0 kN/m2

    1,35

    1,35

    61,56 kN/m2

    51,30 kN/m2

    3. ObciąŜenia pod stropem

    -strop podwieszony

    -instalacje podwieszone

    Razem

    0,50 kN/m2

    0,11 kN/m2

    0,61 kN/m2

    1,35

    1,35

    1,35

    0,67 kN/m2

    0,15 kN/m2

    0,82 kN/m2

    4.ObciąŜenie równomierne

    samochodami:

    1-wszy pas

    2-gi pas

    9,0 kN/m2

    2,50 kN/m2

    1,35

    1,35

    12,15 kN/m2

    2,70 kN/m2

    5. ObciąŜenie układem

    tandemowym

    1-wszy pas

    2-gi pas

    300/2=150 kN

    200/2=100 kN

    1,35

    1,35

    202,5 kN

    135 kN

    6. ObciąŜenie terenu 15,0 kN/m2 1,50 22,50 kN/m2

    7. ObciąŜenie temperaturą -przyrost

    -obniŜenie

    +20°C -20°C

    1,10

    1,10

    +22.0°C -22,0°C

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    25

    8. ObciąŜenie wyjątkowe

    pojazdem NATO kl.150,

    b=1,0

    (Dz.U.63/2000,poz.735)

    I oś-0bc. na 1 koło

    II oś-0bc. na 1 koło

    III oś -0bc. na 1 koło

    IV oś-0bc. na 1 koło

    V oś-0bc. na 1 koło

    285x0,25=71,25 kN

    285x0,25=71,25 kN

    374x0,25=93,50 kN

    374x0,25=93,50 kN

    196x0,25=49,0 kN

    1,35

    1,35

    1,35

    1,35

    1,35

    96,19 kN

    96,19 kN

    126,225 kN

    126,225 kN

    66,15 kN

    4.1.2 Zebranie obci ąŜeń na strop po średni stacji (technologiczny) w cz ęści peronowej

    Zebranie obci ąŜeń wg PN-EN 1991-2

    ZałoŜenia : Beton B37, Stal A-IIIN

    ObciąŜenie ObciąŜenia

    charakterystyczne

    Wsp.

    obc.

    ObciąŜenia

    obliczeniowe

    1. CięŜar własny konstrukcji

    (oblicza program ABC –

    Płyta )

    0,5x25= 12,50 kN/m2

    1,35

    16,87 kN/m2

    2. ObciąŜenia warstwami

    posadzkowymi na stropie

    -szlichta

    -gres lub podłoga

    podniesiona

    Razem

    0,04 x 21 = 0,84 kN/m2

    0,03 x 21 = 0,63 kN/m2

    1,47 kN/m2

    1,35

    1,35

    1,35

    1,13 kN/m2

    0,85 kN/m2

    1,98 kN/m2

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    26

    3.ObciąŜenie ścianami

    działowymi: (stałe)

    -ściany murowane

    -tynk

    Razem

    5,00x0,12 x 14 = 8,40 kN/m

    2x0,02x5,0 x 19 = 3,80 kN/m

    12,20 kN/m

    1,35

    1,35

    1,35

    11,34 kN/m

    5,13 kN/m

    16,47 kN/m

    4.ObciąŜenie ścianami

    wokół wentylatorni: (stałe)

    -ściany murowane

    -wykładzina wygłuszająca

    -tynk

    Razem

    5,00x0,25 x 18 = 22,50 kN/m

    0,20x5,0 x 0,45 = 0,45 kN/m

    2x0,02x5,0 x 19 = 3,80 kN/m

    26,75 kN/m

    1,35

    1,35

    1,35

    30,38 kN/m

    0,61 kN/m

    5,13 kN/m

    36,12kN/m

    5. ObciąŜenia pod stropem

    -strop podwieszony

    -instalacje podwieszone

    Razem

    0,50 kN/m2

    0,11 kN/m2

    0,61 kN/m2

    1,35

    1,35

    1,35

    0,67 kN/m2

    0,15 kN/m2

    0,82 kN/m2

    6.ObciąŜenie równomierne

    technologiczne:

    10,0 kN/m2

    1,5

    15,05 kN/m2

    7.ObciąŜenie wentylatorami -wentylator -fundament

    Razem

    20/(4,60x2,50) = 1,74 kN/m2

    0,3x24= 7,20 kN/m2

    8,94 kN/m2

    1,35

    1,35

    2,35 kN/m2

    9,72 kN/m2

    12,07 kN/m2

    8.ObciąŜenie podstacji

    energetycznej

    20,0 kN/m2

    1,35

    27,0 kN/m2

    9.ObciąŜenie ścianami

    szachtu w podst. energet:

    -ściana Ŝelbet. szachtu

    -obc. od płyt prefabryk.

    -tynk

    Razem

    8,30x0,30 x 25 = 62,25 kN/m

    2,8x2x0,2x24/(2x(1,7+2,5)) = 3,20kN/m

    8,30x0,015 x19 = 2,36 kN/m

    67,81 kN/m

    1,35

    1,35

    1,35

    84,04 kN/m

    4,32 kN/m

    3,19 kN/m

    91,55kN/m

    10.ObciąŜenie liniowe

    uŜytkowe od obc. na

    górnej płycie szachtu w

    podst. energe.:

    2,8x2x0,2x15/(2x(1,7+2,5)) = 10 kN/m

    1,5

    15,0 kN/m

    11.ObciąŜenie ścianami

    kanału went. ścianka gr.

    30cm:

    -ściana Ŝelbet. szachtu

    -obc. od stropu kanału

    -posadzka na stropie

    Razem

    1,55 x 0,30 x 25 = 11,62 kN/m

    0,5 x 3,10x 0,25 x 25 = 9,69kN/m

    1,47 x 0,5x3,10 = 2,28 kN/m

    23,59 kN/m

    1,35

    1,35

    1,35

    15,69 kN/m

    13,08 kN/m

    3,08 kN/m

    31,85kN/m

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    27

    12.ObciąŜenie ścianami

    kanału went. ścianka gr.

    30cm - poszerzenie:

    -ściana Ŝelbet. szachtu

    -obc. od stropu kanału

    -posadzka na stropie

    Razem

    1,55 x 0,30 x 25 = 11,62 kN/m

    3,60x 5,55x0,25x25/(2x(2,75+3,6))=

    9,83kN/m

    1,47 x 5,55x3,60/(2x(2,75+3,6)) =

    2,32 kN/m

    23,77 kN/m

    1,35

    1,35

    1,35

    15,69 kN/m

    13,27 kN/m

    3,13 kN/m

    32,09kN/m

    13.ObciąŜenie ścianami

    kanału went. ścianka gr.

    45cm - poszerzenie:

    -ściana Ŝelbet. szachtu

    -obc. od stropu kanału

    -posadzka na stropie

    Razem

    1,55 x 0,45 x 25 = 17,44 kN/m

    3,60x 5,55x0,25x25/(2x(2,75+3,6))=

    9,83kN/m

    1,47 x 5,55x3,60/(2x(2,75+3,6)) =

    2,32 kN/m

    29,59 kN/m

    1,35

    1,35

    1,35

    23,54 kN/m

    13,27 kN/m

    3,13 kN/m

    39,94kN/m

    14.ObciąŜenie ścianami

    koszulki: (stałe)

    -ściana Ŝelbet. gr. 30cm

    -wykładzina

    -obc. ze stropu zewn. stałe

    Razem

    5,00x0,30 x 25 = 37,50 kN/m

    0,03x5,0 x 23 = 3,45 kN/m

    0,8x141,6 = 113,30 kN/m

    154,25 kN/m

    1,35

    1,35

    1,35

    50,625 kN/m

    4,65 kN/m

    152,95 kN/m

    208,22kN/m

    15.ObciąŜenie zmienne od

    ścianek koszulki:

    -obc. ze stropu zewn.

    0,2x141,6 = 28,32 kN/m

    1,50

    42,48 kN/m

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    28

    4.1.3 Zebranie obci ąŜeń na strop po średni stacji (technologiczny) w cz ęściach

    głowicowych

    Zebranie obci ąŜeń wg PN-EN 1991-2

    ZałoŜenia : Beton B37, Stal A-IIIN

    ObciąŜenie ObciąŜenia

    charakterystyczne

    Wsp.

    obc.

    ObciąŜenia

    obliczeniowe

    1. CięŜar własny konstrukcji

    (oblicza program ABC –

    Płyta )

    0,4x25= 10,00 kN/m2

    1,35

    13,50 kN/m2

    2. ObciąŜenia warstwami

    posadzkowymi na stropie

    -szlichta

    -gres lub podłoga

    podniesiona

    Razem

    0,04 x 21 = 0,84 kN/m2

    0,03 x 21 = 0,63 kN/m2

    1,47 kN/m2

    1,35

    1,35

    1,35

    1,13 kN/m2

    0,85 kN/m2

    1,98 kN/m2

    3.ObciąŜenie ścianami

    działowymi: (stałe)

    -ściany murowane

    -tynk

    Razem

    2,10x0,12 x 14 = 3,53 kN/m

    2x0,02x2,10 x 19 = 1,60 kN/m

    5,13 kN/m

    1,35

    1,35

    1,35

    4,76 kN/m

    2,16 kN/m

    6,92 kN/m

    2. ObciąŜenia pod stropem

    -strop podwieszony

    -instalacje podwieszone

    Razem

    0,50 kN/m2

    0,11 kN/m2

    0,61 kN/m2

    1,35

    1,35

    1,35

    0,67 kN/m2

    0,15 kN/m2

    0,82 kN/m2

    4.ObciąŜenie równomierne

    technologiczne:

    10,0 kN/m2

    1,5

    15,0 kN/m2

    4.1.4 Zebranie obci ąŜeń na strop dla komunikacji - po średniego stacji w cz ęściach

    głowicowych

    Zebranie obci ąŜeń wg PN-EN 1991-2

    ZałoŜenia : Beton B37, Stal A-IIIN

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    29

    ObciąŜenie ObciąŜenia

    charakterystyczne

    Wsp.

    obc.

    ObciąŜenia

    obliczeniowe

    1. CięŜar własny konstrukcji

    (oblicza program ABC–

    Płyta )

    0,4x25= 10,00 kN/m2

    1,35

    13,50 kN/m2

    2. ObciąŜenia warstwami

    posadzkowymi na stropie

    -szlichta

    -gres lub inne warstwy

    Razem

    0,04 x 21 = 0,84 kN/m2

    0,03 x 21 = 0,63 kN/m2

    1,47 kN/m2

    1,35

    1,35

    1,35

    1,13 kN/m2

    0,85 kN/m2

    1,98 kN/m2

    3.ObciąŜenie ścianami

    działowymi: (stałe)

    -ściany murowane

    -zaprawa

    -wykładzina ścian

    Razem

    3,60x0,12 x 14 = 6,05 kN/m

    2x0,015x3,60 x 19 = 2,05 kN/m

    3,60x2x0,03 x 21 = 4,54 kN/m

    12,64 kN/m

    1,35

    1,35

    1,35

    1,35

    8,17 kN/m

    2,78 kN/m

    6,13 kN/m

    17,08 kN/m

    2. ObciąŜenia pod stropem

    -strop podwieszony

    -instalacje podwieszone

    Razem

    0,50 kN/m2

    0,11 kN/m2

    0,61 kN/m2

    1,35

    1,35

    1,35

    0,67 kN/m2

    0,15 kN/m2

    0,82 kN/m2

    4.ObciąŜenie równomierne

    tłumem:

    9,0 kN/m2

    1,5

    13,5 kN/m2

    5.ObciąŜenie równomierne

    zmienne w

    pomieszczeniach:

    9,0 kN/m2

    1,5

    13,5 kN/m2

    4.1.5 Zebranie obci ąŜeń na strop peronowy stacji

    Zebranie obci ąŜeń wg PN-EN 1991-2

    ZałoŜenia : Beton B37, Stal A-IIIN

    ObciąŜenie ObciąŜenia

    charakterystyczne

    Wsp.

    obc.

    ObciąŜenia

    obliczeniowe

    1. CięŜar własny konstrukcji

    (oblicza program ABC–

    Płyta )

    0,2x25= 5,00 kN/m2

    1,35

    6,75 kN/m2

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    30

    2. ObciąŜenia warstwami

    posadzkowymi na stropie

    -szlichta

    -gres lub inne warstwy

    Razem

    0,04 x 21 = 0,84 kN/m2

    0,03 x 21 = 0,63 kN/m2

    1,47 kN/m2

    1,35

    1,35

    1,35

    1,13 kN/m2

    0,85 kN/m2

    1,98 kN/m2

    3.ObciąŜenie równomierne

    tłumem:

    9,0 kN/m2

    1,5

    13,5 kN/m2

    4.1.6 Zebranie obci ąŜeń na płyt ę denną stacji

    Zebranie obci ąŜeń wg PN-EN 1991-2

    ZałoŜenia : Beton B37, Stal A-IIIN

    Podatność gruntu pod płytą denną: 30MPa/m

    Podatność gruntu pod baretami: 60MPa/m

    ObciąŜenie ObciąŜenia

    charakterystyczne

    Wsp.

    obc.

    ObciąŜenia

    obliczeniowe

    1. CięŜar własny konstrukcji

    (oblicza program ABC –

    Płyta )

    -część środkowa

    - części boczne

    1,50x25= 37,50 kN/m2

    (1,50+1,20)x0,5x25= 33,75 kN/m2

    1,35

    1,35

    50,62 kN/m2

    45,56 kN/m2

    2.ObciąŜenie przesuwem

    tarczy na długości 11m

    4000/(2x11.0mx1,2)=151,52 kN

    1,15

    174,25 kN

    3.Wypór wody

    15m słupa wody

    15x10=150 kN/m2 1,35 202,50 kN/m2

    4.1.7 Obliczenie par ć i odporów

    Zebranie obci ąŜeń wg . PN-EN 1997-1:2008 Eurokod 7: Projektowanie geotechn iczne

    -wg schematów w programach GEO-5, GGU

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    31

    4.2 HALA PERONOWA – OBLICZENIA STATYCZNE I WYMIAROW ANIE

    4.2.1 Hala peronowa – Obliczenia statyczne

    WĘZŁY:

    1 2 3 4 5

    6

    7

    8

    9

    10

    11

    12 131415 16

    171819 20 21

    22

    23 24

    2526 272829 30

    31 32

    33343536 37

    38 3940 414243444546

    47484950

    5152535455

    56575859

    60

    6162636465

    666768 69

    707172

    7374757677

    7879 80 81 82838485 86 8788 89

    0,6500,1150,2000,532

    1,0751,075

    1,0750,738

    0,3380,527

    1,1440,051

    1,0931,143

    0,6940,4500,450

    0,6941,144

    1,0920,052

    1,1430,5270,338

    0,7371,075

    1,0751,075

    0,5330,2000,1150,650

    H=21,800

    18,630

    0,1310,1300,1300,1300,089

    1,0301,243

    0, 022

    1,2211,2431,243

    0,4930,750

    1,0001,0000,9500,9500,9501,000

    V=32,335

    WĘZŁY: --------------------------------------------------- --------------- Nr: X [m]: Y [m]: Nr: X [m]: Y [m]: --------------------------------------------------- --------------- 1 0,000 32,335 46 0,000 27,485 2 0,650 32,335 47 0,650 30,385 3 10,900 32,335 48 0,650 29,435 4 21,150 32,335 49 0,650 28,485 5 21,800 32,335 50 0,650 27,485 6 21,800 26,485 51 21,150 31,335 7 21,800 19,240 52 21,150 30,385 8 21,800 0,000 53 21,150 29,435 9 0,000 26,485 54 21,150 28,485 10 0,000 19,240 55 21,150 27,485 11 0,000 0,000 56 21,800 30,385 12 0,650 26,485 57 21,800 29,435 13 21,150 26,485 58 21,800 28,485 14 10,900 26,485 59 21,800 27,485 15 0,765 26,485 60 0,000 20,270

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    32

    16 21,035 26,485 61 0,000 25,242 17 21,035 19,240 62 0,000 23,999 18 0,765 19,240 63 0,000 22,756 19 5,798 18,630 64 0,000 21,513 20 10,900 18,630 65 0,765 21,513 21 16,002 18,630 66 0,765 22,756 22 10,900 21,535 67 0,765 23,999 23 6,325 18,630 68 0,765 25,242 24 15,475 18,630 69 21,035 25,242 25 15,475 21,535 70 21,035 23,999 26 6,325 21,535 71 21,035 22,756 27 16,340 21,535 72 21,035 21,513 28 5,460 21,535 73 21,800 25,242 29 0,765 20,270 74 21,800 23,999 30 21,035 20,270 75 21,800 22,756 31 1,497 19,151 76 21,800 21,513 32 20,302 19,151 77 21,800 20,270 33 10,900 25,735 78 8,613 18,630 34 11,350 26,485 79 7,469 18,630 35 10,450 26,485 80 9,756 18,630 36 0,965 26,485 81 13,188 18,630 37 20,835 26,485 82 14,332 18,630 38 7,520 32,335 83 12,044 18,630 39 14,280 32,335 84 3,647 18,891 40 0,000 31,335 85 2,572 19,021 41 21,800 31,335 86 4,722 18,761 42 0,650 31,335 87 18,152 18,891 43 0,000 30,385 88 17,077 18,761 44 0,000 29,435 89 19,227 19,021 45 0,000 28,485 --------------------------------------------------- --------------- PODPORY: P o d a t n o ś c i --------------------------------------------------- --------------- Węzeł: Rodzaj: K ąt: Dx(Do*): Dy: DFi: [ m / k N ] [rad/kNm] --------------------------------------------------- --------------- 8 stała 0,0 0,000E+00 0,000E +00 11 stała 0,0 0,000E+00 0,000E +00 17 przesuwna 0,0 4,440E-05* 18 przesuwna 0,0 4,440E-05* 19 przesuwna 0,0 4,150E-05* 20 stała 0,0 0,000E+00 1,456E -05 21 przesuwna 0,0 4,150E-05* 23 przesuwna 0,0 3,990E-05* 24 przesuwna 0,0 3,990E-05* 31 przesuwna 0,0 3,670E-05* 32 przesuwna 0,0 3,670E-05* 78 stała 0,0 0,000E+00 2,910E -05 79 przesuwna 0,0 2,910E-05* 80 przesuwna 0,0 2,910E-05* 81 przesuwna 0,0 2,910E-05* 82 przesuwna 0,0 2,910E-05* 83 przesuwna 0,0 2,910E-05* 84 przesuwna 0,0 3,090E-05* 85 przesuwna 0,0 3,090E-05*

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    33

    86 przesuwna 0,0 3,090E-05* 87 przesuwna 0,0 3,090E-05* 88 przesuwna 0,0 3,090E-05* 89 przesuwna 0,0 3,090E-05* --------------------------------------------------- --------------- PRĘTY:

    1 2 3 4 5 6789

    101112131415161718

    19

    202122232425262728293031

    32

    3334353637

    3839404142

    4344 45 46

    47

    48 49 505152 53545556575859

    60 61626364656667

    68697071727374 75 76 77 78 79 80 81828384858687

    88

    89

    90

    919293 94 95

    96

    97 98

    99

    100 101

    102

    0,6500,1150,2000,532

    1,0751,075

    1,0750,738

    0,3380,527

    1,1440,051

    1,0931,143

    0,6940,4500,450

    0,6941,144

    1,0920,052

    1,1430,5270,338

    0,7371,075

    1,0751,075

    0,5330,2000,1150,650

    H=21,800

    18,630

    0,1310,1300,1300,1300,089

    1,0301,243

    0, 022

    1,2211,2431,243

    0,4930,750

    1,0001,0000,9500,9500,9501,000

    V=32,335

    PRĘTY UKŁADU: Typy pr ętów: 00 - sztyw.-sztyw.; 01 - sztyw.-przegub; 10 - przegub-sztyw.; 11 - prz egub-przegub 22 - ci ęgno --------------------------------------------------- --------------- Pr ęt: Typ: A: B: Lx[m]: Ly[m]: L[m]: Red.EJ: Przekrój: --------------------------------------------------- --------------- 1 00 1 2 0,650 0,000 0,650 1,000 5 B 150,0x100,0 2 00 2 38 6,870 0,000 6,870 1,000 6 B 108,0x100,0 3 00 38 3 3,380 0,000 3,380 1,000 4 B 117,0x100,0 4 00 3 39 3,380 0,000 3,380 1,000 4 B 117,0x100,0 5 00 39 4 6,870 0,000 6,870 1,000 6 B 108,0x100,0 6 00 4 5 0,650 0,000 0,650 1,000 5 B 150,0x100,0 7 00 5 41 0,000 -1,000 1,000 1,000 1 B 100,0x100,0 8 00 41 56 0,000 -0,950 0,950 1,000 1 B 100,0x100,0 9 00 56 57 0,000 -0,950 0,950 1,000 1 B 100,0x100,0 10 00 57 58 0,000 -0,950 0,950 1,000 1 B 100,0x100,0

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    34

    11 00 58 59 0,000 -1,000 1,000 1,000 1 B 100,0x100,0 12 00 59 6 0,000 -1,000 1,000 1,000 1 B 100,0x100,0 13 00 6 73 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 14 00 73 74 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 15 00 74 75 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 16 00 75 76 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 17 00 76 77 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 18 00 77 7 0,000 -1,030 1,030 1,000 1 B 100,0x100,0 19 00 7 8 0,000 -19,240 19,240 1,000 1 B 100,0x100,0 20 00 1 40 0,000 -1,000 1,000 1,000 1 B 100,0x100,0 21 00 40 43 0,000 -0,950 0,950 1,000 1 B 100,0x100,0 22 00 43 44 0,000 -0,950 0,950 1,000 1 B 100,0x100,0 23 00 44 45 0,000 -0,950 0,950 1,000 1 B 100,0x100,0 24 00 45 46 0,000 -1,000 1,000 1,000 1 B 100,0x100,0 25 00 46 9 0,000 -1,000 1,000 1,000 1 B 100,0x100,0 26 00 9 61 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 27 00 61 62 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 28 00 62 63 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 29 00 63 64 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 30 00 64 60 0,000 -1,243 1,243 1,000 1 B 100,0x100,0 31 00 60 10 0,000 -1,030 1,030 1,000 1 B 100,0x100,0 32 00 10 11 0,000 -19,240 19,240 1,000 1 B 100,0x100,0 33 00 42 47 0,000 -0,950 0,950 1,000 16 B 30,0x100,0 34 00 47 48 0,000 -0,950 0,950 1,000 16 B 30,0x100,0 35 00 48 49 0,000 -0,950 0,950 1,000 16 B 30,0x100,0 36 00 49 50 0,000 -1,000 1,000 1,000 16 B 30,0x100,0 37 00 50 12 0,000 -1,000 1,000 1,000 16 B 30,0x100,0 38 00 51 52 0,000 -0,950 0,950 1,000 16 B 30,0x100,0 39 00 52 53 0,000 -0,950 0,950 1,000 16 B 30,0x100,0 40 00 53 54 0,000 -0,950 0,950 1,000 16 B 30,0x100,0 41 00 54 55 0,000 -1,000 1,000 1,000 16 B 30,0x100,0 42 00 55 13 0,000 -1,000 1,000 1,000 16 B 30,0x100,0 43 00 12 15 0,115 0,000 0,115 1,000 19 B 100,0x100,0 44 00 15 36 0,200 0,000 0,200 1,000 19 B 100,0x100,0 45 00 36 35 9,485 0,000 9,485 1,000 7 B 76,5x100,0 46 00 35 14 0,450 0,000 0,450 1,000 19 B 100,0x100,0 47 00 3 14 0,000 -5,850 5,850 1,000 8 B 40,9x100,0 48 00 14 34 0,450 0,000 0,450 1,000 19 B 100,0x100,0 49 00 34 37 9,485 0,000 9,485 1,000 7 B 76,5x100,0 50 00 37 16 0,200 0,000 0,200 1,000 19 B 100,0x100,0 51 00 16 13 0,115 0,000 0,115 1,000 19 B 100,0x100,0 52 10 9 12 0,650 0,000 0,650 1,000 19 B 100,0x100,0 53 01 13 6 0,650 0,000 0,650 1,000 19 B 100,0x100,0 54 00 16 69 0,000 -1,243 1,243 1,000 17 B 50,0x100,0 55 00 69 70 0,000 -1,243 1,243 1,000 17 B 50,0x100,0 56 00 70 71 0,000 -1,243 1,243 1,000 17 B 50,0x100,0 57 00 71 72 0,000 -1,243 1,243 1,000 17 B 50,0x100,0 58 00 72 30 0,000 -1,243 1,243 1,000 17 B 50,0x100,0 59 00 30 17 0,000 -1,030 1,030 1,000 12 B 70,0x100,0 60 11 10 18 0,765 0,000 0,765 1,000 10 B 5,0x100,0 61 11 17 7 0,765 0,000 0,765 1,000 10 B 5,0x100,0 62 00 18 29 0,000 1,030 1,030 1,000 12 B 70,0x100,0 63 00 29 65 0,000 1,243 1,243 1,000 17 B 50,0x100,0 64 00 65 66 0,000 1,243 1,243 1,000 17 B 50,0x100,0 65 00 66 67 0,000 1,243 1,243 1,000 17 B 50,0x100,0 66 00 67 68 0,000 1,243 1,243 1,000 17 B 50,0x100,0

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    35

    67 00 68 15 0,000 1,243 1,243 1,000 17 B 50,0x100,0 68 00 18 31 0,732 -0,089 0,737 1,000 11 B 147,0x100,0 69 00 31 85 1,075 -0,130 1,083 1,000 9 B 106,0x100,0 70 00 85 84 1,075 -0,130 1,083 1,000 9 B 106,0x100,0 71 00 84 86 1,075 -0,130 1,083 1,000 9 B 106,0x100,0 72 00 86 19 1,076 -0,131 1,084 1,000 9 B 106,0x100,0 73 00 19 23 0,527 0,000 0,527 1,000 15 B 120,0x100,0 74 00 23 79 1,144 0,000 1,144 1,000 15 B 120,0x100,0 75 00 79 78 1,144 0,000 1,144 1,000 15 B 120,0x100,0 76 00 78 80 1,143 0,000 1,143 1,000 15 B 120,0x100,0 77 00 80 20 1,144 0,000 1,144 1,000 15 B 120,0x100,0 78 00 20 83 1,144 0,000 1,144 1,000 15 B 120,0x100,0 79 00 83 81 1,144 0,000 1,144 1,000 15 B 120,0x100,0 80 00 81 82 1,144 0,000 1,144 1,000 15 B 120,0x100,0 81 00 82 24 1,143 0,000 1,143 1,000 15 B 120,0x100,0 82 00 24 21 0,527 0,000 0,527 1,000 15 B 120,0x100,0 83 00 21 88 1,075 0,131 1,083 1,000 9 B 106,0x100,0 84 00 88 87 1,075 0,130 1,083 1,000 9 B 106,0x100,0 85 00 87 89 1,075 0,130 1,083 1,000 9 B 106,0x100,0 86 00 89 32 1,075 0,130 1,083 1,000 9 B 106,0x100,0 87 00 32 17 0,733 0,089 0,738 1,000 11 B 147,0x100,0 88 00 20 22 0,000 2,905 2,905 1,000 8 B 40,9x100,0 89 00 22 33 0,000 4,200 4,200 1,000 8 B 40,9x100,0 90 00 33 14 0,000 0,750 0,750 1,000 19 B 100,0x100,0 91 00 24 25 0,000 2,905 2,905 1,000 13 B 25,0x100,0 92 00 23 26 0,000 2,905 2,905 1,000 13 B 25,0x100,0 93 00 26 22 4,575 0,000 4,575 1,000 14 B 20,0x100,0 94 00 22 25 4,575 0,000 4,575 1,000 14 B 20,0x100,0 95 00 25 27 0,865 0,000 0,865 1,000 14 B 20,0x100,0 96 00 26 28 -0,865 0,000 0,865 1,000 14 B 20,0x100,0 97 11 40 42 0,650 0,000 0,650 1,000 2 B 20,0x100,0 98 11 51 41 0,650 0,000 0,650 1,000 2 B 20,0x100,0 99 11 61 68 0,765 0,000 0,765 1,000 2 B 20,0x100,0 100 11 60 29 0,765 0,000 0,765 1,000 2 B 20,0x100,0 101 11 30 77 0,765 0,000 0,765 1,000 2 B 20,0x100,0 102 11 69 73 0,765 0,000 0,765 1,000 2 B 20,0x100,0 ------------------------------------------------------------------ WIELKOŚCI PRZEKROJOWE: --------------------------------------------------- --------------- Nr. A[cm2] Ix[cm4] Iy[cm4] Wg[cm3] Wd[cm3] h[cm] Materiał: --------------------------------------------------- --------------- 1 10000,0 8333333 8333333 166667 166667 100,0 1 7 Beton B 30 2 2000,0 1666667 66667 6667 6667 20,0 1 8 Beton B 35 4 11700,0 1,3E+07 9750000 228150 228150 117,0 1 8 Beton B 35 5 15000,0 2,8E+07 1,3E+07 375000 375000 150,0 1 8 Beton B 35 6 10800,0 1,0E+07 9000000 194400 194400 108,0 1 8 Beton B 35 7 7650,0 6375000 3730809 97538 97538 76,5 1 8 Beton B 35 8 4087,0 3405833 568896 27839 27839 40,9 1 8 Beton B 35 9 10600,0 9925133 8833333 187267 187267 106,0 1 8 Beton B 35 10 500,0 416667 1042 417 417 5,0 1 8 Beton B 35 11 14700,0 2,6E+07 1,2E+07 360150 360150 147,0 1 8 Beton B 35 12 7000,0 5833333 2858333 81667 81667 70,0 1 8 Beton B 35 13 2500,0 2083333 130208 10417 10417 25,0 1 8 Beton B 35 14 2000,0 1666667 66667 6667 6667 20,0 1 8 Beton B 35 15 12000,0 1,4E+07 1,0E+07 240000 240000 120,0 1 8 Beton B 35 16 3000,0 2500000 225000 15000 15000 30,0 1 8 Beton B 35

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    36

    17 5000,0 4166667 1041667 41667 41667 50,0 1 8 Beton B 35 19 10000,0 8333333 8333333 166667 166667 100,0 1 8 Beton B 35 ------------------------------------------------------------------ STAŁE MATERIAŁOWE: --------------------------------------------------- --------------- Materiał: Moduł E: Napr ęŜ.gr.: AlfaT: [N/mm2] [N/mm2] [1/K] --------------------------------------------------- --------------- 17 Beton B 30 32400 17,100 1,00E-05 18 Beton B 35 34400 19,800 1,00E-05 --------------------------------------------------- --------------- OBCIĄśENIA: ([kN],[kNm],[kN/m]) --------------------------------------------------- --------------- Pr ęt: Rodzaj: K ąt: P1(Tg): P2(Td): a[m]: b[m]: --------------------------------------------------- --------------- Grupa: A "zasypka1" Stałe gf= 1,35 1 Liniowe-Y 0,0 45,60 45,60 0,00 0,65 2 Liniowe-Y 0,0 45,60 45,60 0,00 6,87 3 Liniowe-Y 0,0 45,60 45,60 0,00 3,38 Grupa: B "zasypka2" Stałe gf= 1,35 4 Liniowe-Y 0,0 45,60 45,60 0,00 3,38 5 Liniowe-Y 0,0 45,60 45,60 0,00 6,87 6 Liniowe-Y 0,0 45,60 45,60 0,00 0,65 Grupa: C "posadzka" Stałe gf= 1,35 45 Liniowe 0,0 1,47 1,47 0,00 9,49 46 Liniowe 0,0 1,47 1,47 0,00 0,45 48 Liniowe 0,0 1,47 1,47 0,00 0,45 49 Liniowe 0,0 1,47 1,47 0,00 9,48 93 Liniowe-Y 0,0 1,47 1,47 0,00 4,57 94 Liniowe-Y 0,0 1,47 1,47 0,00 4,58 95 Liniowe-Y 0,0 1,47 1,47 0,00 0,86 96 Liniowe-Y 0,0 1,47 1,47 0,00 0,86 Grupa: D " ściany działowe" Stałe gf= 1,35 45 Liniowe-Y 0,0 2,36 2,36 0,00 9,49 46 Liniowe-Y 0,0 2,36 2,36 0,00 0,45 48 Liniowe-Y 0,0 2,36 2,36 0,00 0,45 49 Liniowe-Y 0,0 2,36 2,36 0,00 9,48 Grupa: E "inst. podwiesz. lub na str" Stałe gf= 1,35 2 Liniowe 0,0 0,61 0,61 0,00 6,87 3 Liniowe 0,0 0,61 0,61 0,00 3,38 4 Liniowe 0,0 0,61 0,61 0,00 3,38 5 Liniowe 0,0 0,61 0,61 0,00 6,87 45 Liniowe 0,0 0,61 0,61 0,00 9,49 46 Liniowe 0,0 0,61 0,61 0,00 0,45 48 Liniowe 0,0 0,61 0,61 0,00 0,45 49 Liniowe 0,0 0,61 0,61 0,00 9,48 Grupa: F "technologia 1" Zmienne gf= 1,50 45 Liniowe-Y 0,0 10,00 10,00 0,00 9,49 46 Liniowe-Y 0,0 10,00 10,00 0,00 0,45

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    37

    Grupa: G "technologia 2" Zmienne gf= 1,50 48 Liniowe-Y 0,0 10,00 10,00 0,00 0,45 49 Liniowe-Y 0,0 10,00 10,00 0,00 9,48 Grupa: H "tłum na peronie 1" Zmienne gf= 1,50 94 Liniowe-Y 0,0 9,00 9,00 0,00 4,58 96 Liniowe-Y 0,0 9,00 9,00 0,00 0,86 Grupa: I "tłum na peronie 2" Zmienne gf= 1,50 93 Liniowe-Y 0,0 9,00 9,00 0,00 4,57 95 Liniowe-Y 0,0 9,00 9,00 0,00 0,86 Grupa: J "samochody +tand1" Zmienne gf= 1,35 1 Liniowe-Y 0,0 15,00 15,00 0,00 0,65 2 Liniowe-Y 0,0 15,00 15,00 0,00 6,87 3 Liniowe-Y 0,0 2,50 2,50 0,38 3,38 3 Liniowe-Y 0,0 15,00 15,00 0,00 0,38 3 Skupione 0,0 100,00 2,88 3 Skupione 0,0 100,00 0,88 4 Liniowe-Y 0,0 9,00 9,00 0,00 3,00 4 Skupione 0,0 150,00 0,50 4 Skupione 0,0 150,00 2,50 4 Liniowe-Y 0,0 15,00 15,00 3,00 3,38 5 Liniowe-Y 0,0 15,00 15,00 0,00 6,87 6 Liniowe-Y 0,0 15,00 15,00 0,00 0,65 Grupa: K "samochody +tand2" Zmienne gf= 1,35 1 Liniowe-Y 0,0 15,00 15,00 0,00 0,65 2 Liniowe-Y 0,0 15,00 15,00 0,00 6,87 3 Liniowe-Y 0,0 9,00 9,00 0,38 3,38 3 Liniowe-Y 0,0 15,00 15,00 0,00 0,38 3 Skupione 0,0 150,00 2,88 3 Skupione 0,0 150,00 0,88 4 Liniowe-Y 0,0 2,50 2,50 0,00 3,00 4 Liniowe-Y 0,0 15,00 15,00 3,00 3,38 4 Skupione 0,0 100,00 0,50 4 Skupione 0,0 100,00 2,50 5 Liniowe-Y 0,0 15,00 15,00 0,00 6,87 6 Liniowe-Y 0,0 15,00 15,00 0,00 0,65 Grupa: M "samochody +tand3" Zmienne gf= 1,35 1 Liniowe-Y 0,0 15,00 15,00 0,00 0,65 2 Liniowe-Y 0,0 15,00 15,00 0,00 4,25 2 Liniowe-Y 0,0 9,00 9,00 4,25 6,87 2 Skupione 0,0 150,00 4,75 2 Skupione 0,0 150,00 6,75 3 Liniowe-Y 0,0 2,50 2,50 0,38 3,38 3 Skupione 0,0 100,00 2,88 3 Skupione 0,0 100,00 0,88 3 Liniowe-Y 0,0 9,00 9,00 0,00 0,38 Grupa: N "samochody +tand4" Zmienne gf= 1,35 4 Liniowe-Y 0,0 2,50 2,50 0,00 3,00 4 Liniowe-Y 0,0 9,00 9,00 3,00 3,38 4 Skupione 0,0 100,00 0,50

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    38

    4 Skupione 0,0 100,00 2,50 5 Liniowe-Y 0,0 9,00 9,00 0,00 2,62 5 Liniowe-Y 0,0 15,00 15,00 2,62 6,87 5 Skupione 0,0 150,00 0,12 5 Skupione 0,0 150,00 2,12 6 Liniowe-Y 0,0 15,00 15,00 0,00 0,65 Grupa: O "Nato 1" Wyj ątkowe gf= 1,35 3 Skupione 0,0 93,50 2,77 3 Skupione 0,0 93,50 1,66 4 Skupione 0,0 93,50 0,61 4 Skupione 0,0 93,50 1,73 Grupa: P "Nato2" Wyj ątkowe gf= 1,35 2 Skupione 0,0 93,50 4,51 2 Skupione 0,0 93,50 3,40 2 Skupione 0,0 93,50 5,74 2 Skupione 0,0 93,50 6,85 Grupa: R "wypór wody na dno" Stałe gf= 1,35 60 Liniowe-Y 0,0 -150,00 -150,00 0,00 0,77 61 Liniowe-Y 0,0 -150,00 -150,00 0,00 0,76 68 Liniowe-Y 0,0 -150,00 -150,00 0,00 0,74 69 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,08 70 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,08 71 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,08 72 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,08 73 Liniowe-Y 0,0 -150,00 -150,00 0,00 0,53 74 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,14 75 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,14 76 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,14 77 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,14 78 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,14 79 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,14 80 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,14 81 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,14 82 Liniowe-Y 0,0 -150,00 -150,00 0,00 0,53 83 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,08 84 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,08 85 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,08 86 Liniowe-Y 0,0 -150,00 -150,00 0,00 1,08 87 Liniowe-Y 0,0 -150,00 -150,00 0,00 0,74 Grupa: T "parcie gr+woda+odpór" Stałe gf= 1,50 7 Liniowe-X 90,0 -26,00 -62,50 0,00 1,00 8 Liniowe-X 90,0 -62,50 -84,40 0,00 0,60 8 Liniowe-X 90,0 -61,10 -65,69 0,60 0,95 9 Liniowe-X 90,0 -65,69 -78,13 0,00 0,95 10 Liniowe-X 90,0 -78,13 -87,30 0,00 0,70 10 Liniowe-X 90,0 -135,60 -138,88 0,70 0,95 11 Liniowe-X 90,0 -138,88 -151,99 0,00 1,00 12 Liniowe-X 90,0 -151,99 -165,10 0,00 1,00 13 Liniowe-X 90,0 -165,10 -178,80 0,00 1,24 14 Liniowe-X 90,0 -178,80 -192,50 0,00 1,24 15 Liniowe-X 90,0 -192,50 -195,80 0,00 0,30

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    39

    15 Liniowe-X 90,0 -190,50 -205,45 0,30 1,24 16 Liniowe-X 90,0 -205,45 -225,13 0,00 1,24 17 Liniowe-X 90,0 -225,13 -238,00 0,00 0,81 17 Liniowe-X 90,0 -235,00 -244,34 0,81 1,24 18 Liniowe-X 90,0 -244,34 -266,70 0,00 1,03 19 Liniowe-X 90,0 -266,70 -271,70 0,00 0,74 19 Liniowe-X 90,0 -239,50 -243,30 0,74 1,04 19 Liniowe-X 90,0 -138,60 -108,40 1,04 4,74 19 Liniowe-X 90,0 -94,90 0,00 4,74 9,54 19 Liniowe-X 90,0 0,00 187,90 9,54 19,24 20 Liniowe-X 90,0 66,00 76,75 0,00 1,00 21 Liniowe-X 90,0 76,75 83,20 0,00 0,60 21 Liniowe-X 90,0 59,90 63,93 0,60 0,95 22 Liniowe-X 90,0 63,93 74,85 0,00 0,95 23 Liniowe-X 90,0 74,85 82,90 0,00 0,70 23 Liniowe-X 90,0 131,20 134,06 0,70 0,95 24 Liniowe-X 90,0 134,06 145,48 0,00 1,00 25 Liniowe-X 90,0 145,48 156,90 0,00 1,00 26 Liniowe-X 90,0 156,90 167,52 0,00 1,24 27 Liniowe-X 90,0 167,52 178,14 0,00 1,24 28 Liniowe-X 90,0 178,14 180,70 0,00 0,30 28 Liniowe-X 90,0 186,00 198,43 0,30 1,24 29 Liniowe-X 90,0 198,43 214,80 0,00 1,24 30 Liniowe-X 90,0 214,80 225,50 0,00 0,81 30 Liniowe-X 90,0 228,50 237,13 0,81 1,24 31 Liniowe-X 90,0 237,13 257,80 0,00 1,03 32 Liniowe-X 90,0 257,80 262,90 0,00 0,44 32 Liniowe-X 90,0 230,80 236,60 0,44 0,74 32 Liniowe-X 90,0 130,50 101,40 0,74 4,74 32 Liniowe-X 90,0 88,00 0,00 4,74 9,33 32 Liniowe-X 90,0 0,00 -190,50 9,33 19,24 Grupa: U "Nato3" Wyj ątkowe gf= 1,35 5 Skupione 0,0 93,50 1,14 5 Skupione 0,0 93,50 0,02 5 Skupione 0,0 93,50 2,35 5 Skupione 0,0 93,50 3,47 Grupa: W "Nato4" Wyj ątkowe gf= 1,35 2 Skupione 0,0 93,50 0,00 2 Skupione 0,0 93,50 1,11 2 Skupione 0,0 93,50 2,33 2 Skupione 0,0 93,50 3,45 Grupa: X "Nato5" Wyj ątkowe gf= 1,35 5 Skupione 0,0 93,50 6,87 5 Skupione 0,0 93,50 5,75 5 Skupione 0,0 93,50 4,54 5 Skupione 0,0 93,50 3,42 --------------------------------------------------- ---------------

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    40

    =================================================== =============== W Y N I K I

    Teoria I-go rz ędu Kombinatoryka obci ąŜeń

    ================================================================== OBCIĄśENIOWE WSPÓŁ. BEZPIECZ.: ------------------------------------------------------------------ Grupa: Znaczenie: gd: gf: --------------------------------------------------- --------------- Ci ęŜar wł. 1,35 A -"zasypka1" Stałe 1,35 B -"zasypka2" Stałe 1,35 C -"posadzka" Stałe 1,35 D -" ściany działowe" Stałe 1,35 E -"inst. podwiesz. lub na str" Stałe 1,35 F -"technologia 1" Zmienne 1 0 ,80 1,50 G -"technologia 2" Zmienne 1 0 ,80 1,50 H -"tłum na peronie 1" Zmienne 1 0 ,80 1,50 I -"tłum na peronie 2" Zmienne 1 0 ,80 1,50 J -"samochody +tand1" Zmienne 1 0 ,75 1,35 K -"samochody +tand2" Zmienne 1 0 ,75 1,35 M -"samochody +tand3" Zmienne 1 0 ,75 1,35 N -"samochody +tand4" Zmienne 1 0 ,75 1,35 O -"Nato 1" Wyj ątkowe 1,35 P -"Nato2" Wyj ątkowe 1,35 R -"wypór wody na dno" Stałe 1,35 T -"parcie gr+woda+odpór" Stałe 1,50 U -"Nato3" Wyj ątkowe 1,35 W -"Nato4" Wyj ątkowe 1,35 X -"Nato5" Wyj ątkowe 1,35 --------------------------------------------------- --------------- SIŁY PRZEKROJOWE - WARTO ŚCI EKSTREMALNE: T.I rzędu ObciąŜenia obl.: CięŜar wł.+"Kombinacja obciąŜeń" --------------------------------------------------- --------------- Pr ęt: x[m]: M[kNm]: Q[kN]: N[kN]: Kombinacja obci ąŜeń: --------------------------------------------------- --------------- 1 0,650 -501,1* 459,7 -387,6 ABCDER T 0,000 -1448,2* 863,9 -506,7 ABCDEF GHIMRT 0,000 -1193,3 950,6* -456,8 ABCDEF GHIRTW 0,000 -823,2 531,3 -387,6* ABCDER T 0,650 -501,1 459,7 -387,6* ABCDER T 0,000 -1448,2 863,9 -506,7* ABCDEF GHIMRT 0,650 -914,2 779,1 -506,7* ABCDEF GHIMRT 2 4,935 1462,9* 1,7 -506,7 ABCDEF GHIMRT 0,000 -914,2* 779,1 -506,7 ABCDEF GHIMRT 0,000 -914,2 779,1* -506,7 ABCDEF GHIMRT 0,000 -501,1 459,7 -387,6* ABCDER T 4,721 584,2 0,1 -387,6* ABCDER T 0,000 -914,2 779,1 -506,7* ABCDEF GHIMRT 4,935 1462,9 1,7 -506,7* ABCDEF GHIMRT 3 0,000 1236,8* -412,7 -506,7 ABCDEF GHIMRT 3,380 -1284,9* -1055,2 -481,4 ABCDEM RT 3,380 -1284,9 -1055,2* -481,4 ABCDEM RT

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    41

    3,380 -920,6 -548,2 -387,6* ABCDER T 0,000 359,4 -209,2 -387,6* ABCDER T 3,380 -1166,1 -1036,5 -506,7* ABCDEF GHIMRT 0,000 1236,8 -412,7 -506,7* ABCDEF GHIMRT 4 3,380 1216,7* 402,4 -501,9 ABCDEF GHINRT 0,000 -1270,1* 1044,8 -476,6 ABCDEN RT 0,000 -1270,1 1044,8* -476,6 ABCDEN RT 0,000 -905,9 537,9 -382,8* ABCDER T 3,380 339,3 198,9 -382,8* ABCDER T 0,000 -1151,3 1026,1 -501,9* ABCDEF GHINRT 3,380 1216,7 402,4 -501,9* ABCDEF GHINRT 5 1,812 1423,4* 1,4 -501,9 ABCDEF GHINRT 6,870 -1005,3* -789,5 -501,9 ABCDEF GHINRT 6,870 -1005,3 -789,5* -501,9 ABCDEF GHINRT 6,870 -592,2 -470,1 -382,8* ABCDER T 2,058 542,4 -1,5 -382,8* ABCDER T 6,870 -1005,3 -789,5 -501,9* ABCDEF GHINRT 1,812 1423,4 1,4 -501,9* ABCDEF GHINRT 6 0,000 -592,2* -470,1 -382,8 ABCDER T 0,650 -1546,0* -874,2 -501,9 ABCDEF GHINRT 0,650 -1291,1 -960,9* -451,9 ABCDEF GHIRTX 0,650 -921,0 -541,7 -382,8* ABCDER T 0,000 -592,2 -470,1 -382,8* ABCDER T 0,650 -1546,0 -874,2 -501,9* ABCDEF GHINRT 0,000 -1005,3 -789,5 -501,9* ABCDEF GHINRT 7 1,000 -566,8* 316,4 -574,1 ABCDER T 0,000 -1546,0* 501,9 -874,2 ABCDEF GHINRT 0,000 -1546,0 501,9* -874,2 ABCDEF GHINRT 0,000 -1039,0 427,1 -529,2* ABCDEP RT 1,000 -867,8 385,5 -993,3* ABCDEF GHIRTX 8 0,950 -308,9* 230,2 -611,8 ABCDEG RT 0,000 -1072,7* 436,4 -908,7 ABCDEF GHINRT 0,000 -1072,7 436,4* -908,7 ABCDEF GHINRT 0,000 -640,5 360,9 -563,7* ABCDEP RT 0,950 -547,7 287,8 -1026,2* ABCDEF GHIRTX 9 0,950 -130,5* 157,4 -635,8 ABCDEG RTW 0,000 -709,2* 325,7 -934,7 ABCDEF HINRT 0,000 -705,9 337,0* -939,5 ABCDEF GHINRT 0,000 -345,4 261,5 -594,4* ABCDEP RT 0,950 -321,6 185,3 -1057,0* ABCDEF GHIRTX 10 0,950 -26,0* 51,1 -667,0 ABCDEG MRT 0,000 -447,0* 223,3 -965,5 ABCDEF HINRT 0,000 -433,0 234,6* -970,3 ABCDEF GHINRT 0,000 -144,3 159,0 -625,2* ABCDEP RT 0,950 -203,6 47,0 -1087,8* ABCDEF GHIRTX 11 0,250 -19,8* -1,6 -675,1 ABCDEG MRT 1,000 -315,4* -136,0 -1025,5 ABCDEF HNRT 1,000 -228,3 -240,1* -700,9 ABCDER T

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    42

    0,000 -51,2 20,7 -656,0* ABCDEP RT 1,000 -264,1 -171,2 -1120,2* ABCDEF GHIRTX 12 0,000 -82,2* -164,3 -702,6 ABCDEG IMRT 1,000 -596,5* -427,9 -1137,6 ABCDER TX 1,000 -585,6 -477,9* -733,3 ABCDER T 0,000 -137,9 -197,5 -688,4* ABCDEP RT 1,000 -552,5 -409,0 -1152,6* ABCDEF GHIRTX 13 1,243 195,7* 380,5 -196,2 ABCDEF RTW 0,000 -596,5* 757,9 -519,4 ABCDER TX 0,000 -594,2 762,1* -523,5 ABCDEF RTX 0,000 -585,6 746,1 -150,4* ABCDER T 1,243 107,4 368,5 -621,0* ABCDEF GHIRTX 14 1,243 693,7* 230,5 -253,1 ABCDEF MRT 0,000 64,2* 590,9 -553,7 ABCDEG HINRT 0,000 92,7 597,3* -432,0 ABCDEF GHIKRT 0,000 145,3 569,2 -193,2* ABCDER T 1,243 612,1 230,8 -663,7* ABCDEF GHIRTX 15 0,830 788,2* -7,0 -295,4 ABCDEF HIMRT 0,000 586,2* 244,8 -594,0 ABCDEG HINRT 0,000 622,6 251,1* -472,3 ABCDEF GHIKRT 0,000 640,2 223,0 -233,4* ABCDER T 1,243 673,1 -136,6 -704,0* ABCDEF GHIRTX 16 0,000 759,6* -132,3 -308,8 ABCDEF HIMRT 1,243 238,5* -542,5 -727,8 ABCDEG RTX 1,243 290,0 -551,0* -315,4 ABCDER TW 0,000 691,6 -144,4 -273,7* ABCDER T 1,243 257,7 -538,0 -744,3* ABCDEF GHIRTX 17 0,000 349,6* -533,7 -349,0 ABCDEF HIMRT 1,243 -704,0* -979,5 -768,1 ABCDEG RTX 1,243 -663,1 -988,0* -355,6 ABCDER TW 0,000 266,5 -545,8 -314,0* ABCDER T 1,243 -679,3 -975,0 -784,6* ABCDEF GHIRTX 18 0,064 -581,4* -2,8 -393,9 ABCDEF HIMRT 1,030 -768,6* -316,3 -694,5 ABCDEH INRT 1,030 -760,8 -373,9* -425,1 ABCDEF HIMRT 0,000 -680,1 119,5 -356,7* ABCDER T 1,030 -756,6 -275,3 -820,4* ABCDEF GHIRTX 19 4,278 1056,1* 3,9 -513,2 ABCDEF GRT 14,996 -1878,8* 19,1 -1103,6 ABCDEH INRT 0,000 -768,6 1021,1* -617,7 ABCDEH INRT 0,000 -757,4 1020,5 -313,3* ABCDER T 19,240 0,0 952,9 -1366,9* ABCDEF GHIRTX 20 0,000 1448,2* -506,7 -863,9 ABCDEF GHIMRT 1,000 487,7* -280,6 -563,7 ABCDER T 0,000 1448,2 -506,7* -863,9 ABCDEF GHIMRT 0,000 941,2 -432,0 -518,8* ABCDER TU 1,000 788,7 -349,7 -983,0* ABCDEF GHIRTW

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    43

    21 0,000 993,6* -401,3 -898,4 ABCDEF GHIMRT 0,950 267,6* -190,0 -601,4 ABCDEF RT 0,000 993,6 -401,3* -898,4 ABCDEF GHIMRT 0,000 561,4 -325,8 -553,3* ABCDER TU 0,950 506,3 -247,6 -1015,9* ABCDEF GHIRTW 22 0,000 667,8* -285,6 -924,4 ABCDEG HIMRT 0,950 125,7* -120,8 -625,5 ABCDEF RTX 0,000 664,5 -296,9* -929,2 ABCDEF GHIMRT 0,000 304,0 -221,3 -584,1* ABCDER TU 0,950 316,9 -148,7 -1046,6* ABCDEF GHIRTW 23 0,000 442,2* -186,7 -955,2 ABCDEG HIMRT 0,950 53,4* -20,3 -656,7 ABCDEF NRT 0,000 428,2 -198,0* -960,0 ABCDEF GHIMRT 0,000 139,5 -122,4 -614,9* ABCDER TU 0,950 231,0 -16,2 -1077,4* ABCDEF GHIRTW 24 1,000 369,7* 158,3 -1015,2 ABCDEG IMRT 0,125 52,5* 5,0 -660,8 ABCDEF NRT 1,000 282,4 262,4* -690,6 ABCDER T 0,000 78,6 10,1 -645,7* ABCDER TU 1,000 318,2 193,5 -1109,8* ABCDEF GHIRTW 25 1,000 667,7* 439,2 -1127,3 ABCDER TW 0,000 136,4* 186,6 -692,3 ABCDEF HNRT 1,000 656,8 489,1* -723,0 ABCDER T 0,000 192,1 219,8 -678,1* ABCDER TU 1,000 623,7 420,3 -1142,2* ABCDEF GHIRTW 26 0,000 667,7* -767,7 -511,0 ABCDER TW 1,243 -147,3* -408,4 -187,8 ABCDEG RTX 0,000 665,4 -771,8* -515,1 ABCDEG RTW 0,000 656,8 -755,9 -142,0* ABCDER T 1,243 -59,0 -396,4 -612,6* ABCDEF GHIRTW 27 0,000 -15,8* -594,3 -545,3 ABCDEF HIMRT 1,243 -663,7* -257,8 -244,7 ABCDEG NRT 0,000 -44,3 -600,7* -423,7 ABCDEF GHIJRT 0,000 -96,9 -572,5 -184,8* ABCDER T 1,243 -582,1 -258,1 -655,3* ABCDEF GHIRTW 28 0,000 -556,3* -272,0 -585,6 ABCDEF HIMRT 0,948 -788,1* 3,3 -290,8 ABCDEG HINRT 0,000 -592,7 -278,4* -463,9 ABCDEF GHIJRT 0,000 -610,3 -250,3 -225,1* ABCDER T 1,243 -687,9 94,6 -695,6* ABCDEF GHIRTW 29 1,243 -314,9* 484,3 -719,5 ABCDEF RTW 0,000 -774,4* 90,2 -300,4 ABCDEG HINRT 1,243 -366,4 492,8* -307,0 ABCDER TX 0,000 -706,4 102,4 -265,3* ABCDER T 1,243 -334,1 479,8 -735,9* ABCDEF GHIRTW 30 1,243 542,8* 902,9 -759,7 ABCDEF RTW

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    44

    0,000 -426,0* 475,4 -340,6 ABCDEG HINRT 1,243 501,9 911,4* -347,3 ABCDER TX 0,000 -342,9 487,6 -305,6* ABCDER T 1,243 518,1 898,4 -776,2* ABCDEF GHIRTW 31 0,000 542,8* -278,5 -762,2 ABCDEF RTW 0,451 387,7* 8,7 -398,0 ABCDEG HINRT 0,000 542,8 -278,5* -762,2 ABCDEF RTW 0,000 519,0 -253,2 -348,4* ABCDER T 1,030 451,5 129,1 -812,0* ABCDEF GHIRTW 32 14,905 2027,7* -29,0 -1092,2 ABCDEH IMRT 3,990 -991,1* -0,4 -495,5 ABCDEF GRT 19,240 -0,0 -996,8* -1232,7 ABCDEH IMRT 0,000 452,3 -856,2 -304,9* ABCDER T 19,240 -0,0 -996,2 -1358,6* ABCDEF GHIRTW 33 0,950 3,6* 3,8 -11,3 ABCDEG RTW 0,950 -1,5* -1,6 -11,3 ABCDEF HINRT 0,950 3,6 3,8* -11,3 ABCDEG RTW 0,000 -0,0 3,8* -2,1 ABCDEG RTW 0,000 -0,0 1,8 -2,1* ABCDEF MRT 0,950 3,6 3,8 -11,3* ABCDEG RTW 34 0,950 7,2* 3,8 -20,6 ABCDEG RTW 0,950 -3,0* -1,6 -20,6 ABCDEF HINRT 0,950 7,2 3,8* -20,6 ABCDEG RTW 0,000 3,6 3,8* -11,3 ABCDEG RTW 0,000 3,6 3,8 -11,3* ABCDEG RTW 0,950 7,2 3,8 -20,6* ABCDEG RTW 35 0,950 10,8* 3,8 -29,8 ABCDEG RTW 0,950 -4,5* -1,6 -29,8 ABCDEF HINRT 0,950 10,8 3,8* -29,8 ABCDEG RTW 0,000 7,2 3,8* -20,6 ABCDEG RTW 0,000 7,2 3,8 -20,6* ABCDEG RTW 0,950 10,8 3,8 -29,8* ABCDEG RTW 36 1,000 14,6* 3,8 -39,5 ABCDEG RTW 1,000 -6,1* -1,6 -39,5 ABCDEF HINRT 1,000 14,6 3,8* -39,5 ABCDEG RTW 0,000 10,8 3,8* -29,8 ABCDEG RTW 0,000 10,8 3,8 -29,8* ABCDEG RTW 1,000 14,6 3,8 -39,5* ABCDEG RTW 37 1,000 18,4* 3,8 -49,2 ABCDEG RTW 1,000 -7,7* -1,6 -49,2 ABCDEF HINRT 1,000 18,4 3,8* -49,2 ABCDEG RTW 0,000 14,6 3,8* -39,5 ABCDEG RTW 0,000 14,6 3,8 -39,5* ABCDEG RTW 1,000 18,4 3,8 -49,2* ABCDEG RTW 38 0,950 2,2* 2,3 -11,3 ABCDEG HIMRT 0,950 -2,9* -3,0 -11,3 ABCDEF RTX 0,000 -0,0 -3,0* -2,1 ABCDEF RTX 0,950 -2,9 -3,0* -11,3 ABCDEF RTX

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    45

    0,000 0,0 2,2 -2,1* ABCDEG MRT 0,950 -2,9 -3,0 -11,3* ABCDEF RTX 39 0,950 4,5* 2,3 -20,6 ABCDEG HIMRT 0,950 -5,8* -3,0 -20,6 ABCDEF RTX 0,000 -2,9 -3,0* -11,3 ABCDEF RTX 0,950 -5,8 -3,0* -20,6 ABCDEF RTX 0,000 -2,9 -3,0 -11,3* ABCDEF RTX 0,950 -5,8 -3,0 -20,6* ABCDEF RTX 40 0,950 6,7* 2,3 -29,8 ABCDEG HIMRT 0,950 -8,7* -3,0 -29,8 ABCDEF RTX 0,000 -5,8 -3,0* -20,6 ABCDEF RTX 0,950 -8,7 -3,0* -29,8 ABCDEF RTX 0,000 -5,8 -3,0 -20,6* ABCDEF RTX 0,950 -8,7 -3,0 -29,8* ABCDEF RTX 41 1,000 9,0* 2,3 -39,5 ABCDEG HIMRT 1,000 -11,7* -3,0 -39,5 ABCDEF RTX 0,000 -8,7 -3,0* -29,8 ABCDEF RTX 1,000 -11,7 -3,0* -39,5 ABCDEF RTX 0,000 -8,7 -3,0 -29,8* ABCDEF RTX 1,000 -11,7 -3,0 -39,5* ABCDEF RTX 42 1,000 11,4* 2,3 -49,2 ABCDEG HIMRT 1,000 -14,7* -3,0 -49,2 ABCDEF RTX 0,000 -11,7 -3,0* -39,5 ABCDEF RTX 1,000 -14,7 -3,0* -49,2 ABCDEF RTX 0,000 -11,7 -3,0 -39,5* ABCDEF RTX 1,000 -14,7 -3,0 -49,2* ABCDEF RTX 43 0,000 -339,4* -570,2 -963,7 ABCDEF HINRT 0,115 -469,6* -692,2 -1209,3 ABCDEG RTW 0,115 -469,6 -692,2* -1209,3 ABCDEG RTW 0,115 -415,4 -594,9 -960,3* ABCDEF GHIJRT 0,000 -347,2 -591,2 -960,3* ABCDEF GHIJRT 0,115 -446,8 -655,0 -1247,7* ABCDER T 0,000 -371,7 -651,3 -1247,7* ABCDER T 44 0,200 -519,6* 194,2 -1374,1 ABCDEG RT 0,000 -774,0* 305,8 -1315,3 ABCDEF HINRT 0,000 -772,4 306,0* -1299,8 ABCDEF HIJRT 0,000 -698,3 285,2 -1282,0* ABCDEF GHMRT 0,200 -641,9 278,7 -1282,0* ABCDEF GHMRT 0,000 -567,8 207,3 -1379,8* ABCDEI RT 0,200 -527,0 200,8 -1379,8* ABCDEI RT 45 6,521 268,2* 1,0 -1299,8 ABCDEF HIJRT 0,000 -713,5* 299,3 -1315,3 ABCDEF HINRT 0,000 -711,9 299,6* -1299,8 ABCDEF HIJRT 0,000 -641,9 278,7 -1282,0* ABCDEF GHMRT 5,928 205,8 7,3 -1282,0* ABCDEF GHMRT 0,000 -527,0 200,8 -1379,8* ABCDEI RT 6,521 128,1 0,1 -1379,8* ABCDEI RT 46 0,000 138,8* -62,9 -1304,5 ABCDEH IJRT

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    46

    0,450 -212,4* -193,5 -1369,5 ABCDEF GRT 0,450 -212,4 -193,5* -1369,5 ABCDEF GRT 0,450 -133,2 -179,6 -1282,0* ABCDEF GHMRT 0,000 -57,8 -155,5 -1282,0* ABCDEF GHMRT 0,450 -51,8 -108,4 -1379,8* ABCDEI RT 0,000 -6,9 -91,1 -1379,8* ABCDEI RT 47 5,850 106,2* 40,8 -1658,1 ABCDEF HMRT 0,000 -132,3* 40,8 -1580,6 ABCDEF HMRT 5,850 106,2 40,8* -1658,1 ABCDEF HMRT 0,000 -132,3 40,8* -1580,6 ABCDEF HMRT 0,000 -14,8 4,9 -1048,7* ABCDEF GHIRT 5,850 5,9 1,4 -1860,5* ABCDEJ RT 48 0,450 156,0* 57,8 -1307,5 ABCDEH IKRT 0,000 -192,9* 188,4 -1372,5 ABCDEF GRT 0,000 -192,9 188,4* -1372,5 ABCDEF GRT 0,000 -113,6 174,4 -1285,0* ABCDEF GINRT 0,450 -40,5 150,4 -1285,0* ABCDEF GINRT 0,000 -32,3 103,3 -1382,9* ABCDEH RT 0,450 10,3 86,0 -1382,9* ABCDEH RT 49 2,964 270,2* -6,2 -1302,8 ABCDEG HIKRT 9,485 -745,1* -304,5 -1318,4 ABCDEG HIMRT 9,485 -743,5 -304,7* -1302,8 ABCDEG HIKRT 9,485 -673,5 -283,8 -1285,0* ABCDEF GINRT 3,557 204,8 -12,5 -1285,0* ABCDEF GINRT 9,485 -558,6 -206,0 -1382,9* ABCDEH RT 2,964 130,0 -5,2 -1382,9* ABCDEH RT 50 0,000 -551,2* -199,4 -1377,2 ABCDEF RT 0,200 -806,6* -310,9 -1318,4 ABCDEG HIMRT 0,200 -805,1 -311,2* -1302,8 ABCDEG HIKRT 0,200 -730,9 -290,3 -1285,0* ABCDEF GINRT 0,000 -673,5 -283,8 -1285,0* ABCDEF GINRT 0,200 -600,4 -212,4 -1382,9* ABCDEH RT 0,000 -558,6 -206,0 -1382,9* ABCDEH RT 51 0,115 -344,4* 572,1 -941,9 ABCDEG HIMRT 0,000 -474,8* 694,2 -1187,5 ABCDEF RTX 0,000 -474,8 694,2* -1187,5 ABCDEF RTX 0,000 -420,6 596,9 -938,5* ABCDEF GHIKRT 0,115 -352,2 593,1 -938,5* ABCDEF GHIKRT 0,000 -452,0 656,9 -1225,9* ABCDER T 0,115 -376,7 653,2 -1225,9* ABCDER T 52 0,000 0,0* -580,9 -1245,0 ABCDER T 0,650 -408,7* -639,2 -1205,5 ABCDEG RTW 0,650 -408,7 -639,2* -1205,5 ABCDEG RTW 0,650 -345,4 -541,9 -960,6* ABCDEF GHIJRT 0,000 0,0 -520,9 -960,6* ABCDEF GHIJRT 0,650 -384,5 -602,0 -1245,0* ABCDER T 0,000 0,0 -580,9 -1245,0* ABCDER T 53 0,650 0,0* 582,9 -1224,0 ABCDER T 0,000 -409,9* 641,2 -1184,5 ABCDEF RTX

  • MB-L2-C08-4769/02 ----------------------------------------------------------------------------------------------------------------------------------------------

    47

    0,000 -409,9 641,2* -1184,5 ABCDEF RTX 0,000 -346,7 543,9 -939,6* ABCDEF GHIKRT 0,650 0,0 522,8 -939,6* ABCDEF GHIKRT 0,000 -385,7 604,0 -1224,0* ABCDER T 0,650 0,0 582,9 -1224,0* ABCDER T 54 1,243 72,0* 3