KERALA STATE TR ANSPORT PROJ ECT - IIkeralapwd.gov.in/keralapwd/eknowledge/Upload/documents/...KS DE...
Transcript of KERALA STATE TR ANSPORT PROJ ECT - IIkeralapwd.gov.in/keralapwd/eknowledge/Upload/documents/...KS DE...
KER
ProjecKerala StT.C.11/33Keston RKawdiar Thiruvan
P
RALA (UN
MO
ct Manatate Transp39, Sree Ba
Road, Nanth P.O. anthapuram
PUBLICGO
STATNDER WOR
ONTH
agemenort Project la Building
hancode,
m - 695003
C WORVERNM
TE TRRLD BANK
LY PRAUG
t Team
RKS DMENT O
RANSP ASSISTAN
ROGRGUST 2
DEPARTF KERA
PORT NCE – Loan
RESS016
TMENTALA
PROJn No. 825
S BRIE
T
JECT4)
EF
- II
ProjecKerala StT.C.11/33Keston RKawdiar
KERA(UN
ct Manatate Transp39, Sree Ba
Road, Nanth P.O., Thiruv
PUBLIGOV
ALA STADER WOR
MONT
agemenort Project la Building
hancode, vananthapu
IC WORVERNM
ATE TRRLD BANK
THLY PAUG
t Team
uram - 6950
RKS DEMENT O
RANSPO ASSISTAN
PROGREGUST 2
003
EPARTMOF KERA
ORT PRNCE – Loa
ESS BR2016
MENT ALA
ROJECTn No. 825
RIEF
T - II 54)
Monthly Progress Brief – August 2016 Page 3
TABLE OF CONTENTS Kerala State Transport Project-II ............................................................................................................................... 5 Project location map ...................................................................................................................................... 5 Introduction ................................................................................................................................................................ 6 1.1 Project Development Objectives ............................................................................................... 6 1.2 Outline Project Data: ................................................................................................................ 6 1.3 Overall Implementation: ........................................................................................................... 8 1.4 Project Components ................................................................................................................. 9 2.1 Project Description .................................................................................................................... 9 2.2 Sub Component A1 (US$322 mn) ............................................................................................. 10 2.3 Supervision Consultancy ......................................................................................................... 10 2.4 Sub Component A2 (US$ 91 mn) ............................................................................................. 11 2.5 Component B – Road Safety Management (US$ 22 mn) .......................................................... 11 2.6 Component C – Institutional Strengthening (US$ 10 mn) ........................................................... 11 2.7 Project Cost and Disbursement ............................................................................................... 12 3.0 Executive Summary .................................................................................................................. 14 3.1 Upgradation Works ................................................................................................................. 14 3.2 Summary of Progress (works) ................................................................................................... 15 3.3 General Issues:........................................................................................................................ 16 4.1 Current Status of Works ........................................................................................................... 17 4.2 Contract Package I ................................................................................................................ 17 4.3 Contract Details ..................................................................................................................... 17 4.4 Progress of Works up to month (July 2016) ................................................................................ 18 4.5 Schedule of Culverts and Drainage works ................................................................................ 19 4.6 Progress Considering the Contract price up to this Month (August) ........................................... 19 4.7 Physical progress Bar Chart ..................................................................................................... 20 4.8 S-Curve .................................................................................................................................. 20 4.9 Strip map ................................................................................................................................ 21 4.10 Utilities .................................................................................................................................... 21 4.11 Potential Issues ....................................................................................................................... 22 4.12 Payments to the Contractor .................................................................................................... 22 4.13 Implementation of EMP ........................................................................................................... 22 4.14 Photograph ............................................................................................................................ 25 15.1 Contract Package - 2 ..................................................................................................................................... 26 15.2 Contract Details ..................................................................................................................... 26 15.3 Progress of Works .................................................................................................................... 27 The status of CD works are stated below: ........................................................................................... 28 15.4 Work progress considering the contract price August 2016 ....................................................... 28 15.5 Physical Progress ..................................................................................................................... 29 15.6 S-Curve .............................................................................................................................................................. 29 15.7 Strip Chart.......................................................................................................................................................... 30 15.8 Utilities .................................................................................................................................... 31 15.9 Potential Issues ....................................................................................................................... 31 15.10 Payments to the Contractor .................................................................................................... 31 15.11 Implementation of EMP ........................................................................................................... 32 15.12 Photographs ........................................................................................................................... 33 16.1 KSTP/PMT/UG – III A .......................................................................................................................................... 33 16.2 Executive Summary ................................................................................................................ 34 16.3 Pre-Construction Activities ....................................................................................................... 34 16.4 Moblisation of Resources ......................................................................................................... 35 16.5 Human resources .................................................................................................................... 35 16.6 Work Progress in detail for this month ....................................................................................... 35 16.7 Work Programme .................................................................................................................... 35 16.8 Quality Control ....................................................................................................................... 35 16.9 Source and Material Approval ................................................................................................ 35 16.10 Mix Design .............................................................................................................................. 35 16.11 Implementation of EMP - Contract Package - IIIA ........................................................................ 36 17.1 KSTP/PMT/UG – III- B .......................................................................................................................................... 37 17.2 Executive Summary ................................................................................................................ 37 17.3 Pre-Construction Activities ....................................................................................................... 38 17.4 Human Resources ................................................................................................................... 38 17.5 Quality Control/ Quality Assurance .......................................................................................... 38 17.6 Source and Material Approvals ............................................................................................... 38 18.1 Contract Package IVA .................................................................................................................................... 39 18.2 Contract Details ..................................................................................................................... 39 18.3 Work Progress ......................................................................................................................... 40
Monthly Progress Brief – August 2016 Page 4
18.4 Physical Progress ..................................................................................................................... 41 18.5 S-Curve .................................................................................................................................. 41 18.6 Potential Issues ....................................................................................................................... 42 18.7 Schedule of culverts and drainage works ................................................................................ 42 18.8 Payment ................................................................................................................................ 42 18.9 Implementation of EMP ........................................................................................................... 42 18.10 Photographs ........................................................................................................................... 43 19.1 Contract Package IV .............................................................................................................. 44 19.2 Contract details: ..................................................................................................................... 44 19.3 Pre-Construction Activities: ...................................................................................................... 45 19.3.1 Utilities .................................................................................................................................... 45 19.4 Physical Progress ..................................................................................................................... 47 19.5 S-Curve .................................................................................................................................. 47 19.6 Schedule of culverts and drainage works ................................................................................ 48 19.7 Payments ............................................................................................................................... 48 19.8 Implementation of EMP ........................................................................................................... 48 19.9 Photographs ........................................................................................................................... 49 20.1 Contract Package V ....................................................................................................................................... 50 20.2 Contract details: ..................................................................................................................... 50 20.3 Work Progress ......................................................................................................................... 51 20.4 Bar chart ................................................................................................................................ 52 20.5 S-Curve .................................................................................................................................. 52 20.6 Strip Map ................................................................................................................................ 53 20.7 Schedule of culverts and drainage works ................................................................................ 54 20.8 Utilities .................................................................................................................................... 54 20.9 Key issues: .............................................................................................................................. 54 20.10 Payment to the contractor ..................................................................................................... 54 20.11 Implementation of EMP ........................................................................................................... 55 20.12 Photographs ........................................................................................................................... 56 21.1 Contract Package VI .............................................................................................................. 57 21.2 Contract details: ..................................................................................................................... 57 21.3 Physical Progress: .................................................................................................................... 58 21.4 Work Progress ......................................................................................................................... 58 21.5 Bar Chart of Physical Progress: ................................................................................................. 60 21.6 S-Curve .................................................................................................................................. 60 21.7 Schedule of Cross Drainage Works .......................................................................................... 61 21.8 Implementation of EMP ........................................................................................................... 61 21.9 Payment to contractor ........................................................................................................... 63 21.10 Photographs ........................................................................................................................... 64 22.1 Contract Package VIII ..................................................................................................................................... 65 23.1 Contract Package VII ............................................................................................................. 65 24.1 Proactive actions taken by employer: .......................................................................................................... 65 25.1 Road Safety Component – Current Status ................................................................................................... 66 26.1 Institutional Strengthening Components – Current Status .......................................................................... 67 27.1 Payment to the consultants as on end August 2016: ................................................................. 68 28.1 Restructuring of KSTP II ............................................................................................................. 68 29.1 Meetings, Site visits & Inspection .................................................................................................................... 68 30.1 Land Acquisition Status ................................................................................................................................... 69 32.1 Status on Critical Actions identified by World Bank ................................................................... 70
KeraProject lo
la Statocation map
te Trannsport Projecct-II
Monthly Progress Brief – August 2016 Page 6
Introduction Government of Kerala has decided to take up Phase-II upgradation component of KSTP
as a standalone project, the KSTP-II. The project envisages the upgradation of 363 km of
SH and MDR, Road Safety Management and Institutional Strengthening of PWD. The total
Project cost is 445 million USD out of which 216 million USD is loan assistance from World
Bank. The project loan agreement was signed on June 19, 2013 at the DEA Office, New
Delhi. The loan effectiveness date is September 6, 2013. The project implementation
period is five years, up to 30 December 2018 and the expected loan closing date is
April 30, 2019.
1.1 Project Development Objectives The Project Development objective is to improve condition, traffic flow and road safety
with a focus on vulnerable road user on Kerala State Core road networks comprising of
363 Km of state highways. The main beneficiaries of the Project will be the users living
along the Project corridors mainly the travelling public, agricultural and industrial
producers, consumers and local community. The main benefit is in the form of reduced
transport bottlenecks, lower passenger freight transport costs, reduced travel time and
improved road safety in terms of reducing severe crashes and injury. The roads identified
for improvement passes through about 87 villages covering eight districts.
1.2 Outline Project Data: The upgrading works for six roads are included in the KSTP-II. The major items of works
included are improvement to gradient, widening and strengthening the roads including
minor realignments wherever essential, reconstruction of narrow bridges and culverts and
improvements to drainage system. A Bypass also is proposed at Thiruvalla. The
carriageway proposed are generally 2 lane with 1.50 mt. slow lanes on either side with
hard shoulders and drains for a total width of 12 meters. The ROW is generally 15 Meters.
The specification for civil works are as per MORTH & IRC standards.
The land acquisition for the project roads are almost completed except in the
Perimbilavu- Pattambi- Perinthalmanna Road.
1.2.0.1 Kasargod Kanhangad Road – SH 57 Length - 27.76 km.Covers Kasargod, Pallikkara, manikoth and Kanhad areas and Tourist
destinations at Bakel Fort and Ezhimala come under this stretch.
1.2.0.2 Pilathara Pappinissery Road Length - 20.90 km. Covers Pilathara, Cheruthayam, Kunnupuram and Pappinissery.
Monthly Progress Brief – August 2016 Page 7
1.2.0.3 Thalassery - Valavupara Road – SH 30 Length 53.12 km. It is a part of SH 30, Thalasserry – Coorg Road and passes through
Koothuparambu, Mattannor, and Irutty.
1.2.0.4 Chengannur - Ettumanoor – Muvattupuzha – SH1 Chengannur Ettumanoor Muvattupuzha stretch of SH-1, MC (Main Central) Road, one of
the most important and oldest roads in Kerala, passing through Thiruvalla,
Changanasserry, Kottayam, Ettumannor, Kuravilangad, Kuttathukulam.
Total length covered is 88 kms.
Road portion from Thiruvananthapuram (Venjaramoodu) to Chengannur was taken up
under Phase I. Bypass at Thiruvalla also forms part of this stretch. The road passes through
the plantation areas and provides access to the tourist centres Kumarakom and
Thekkady.13 bridges will be constructed in this stretch.
The improvement for this road portion is proposed in three construction packages,
Chengannor- Ettumannor(41 km), Ettumanoor-Muvattupuzha (47km) and Thiruvalla
Bypass (2.4km). Reconstruction of three Major Bridges and Nine Minor Bridges are
included in this stretch.
1.2.0.5 Punaloor - Ponkunnam – Thodupuzha – SH 8 Punaloor Ponkunnam Thodupuzha stretch of SH 8 is included in this package.
Total road length is 132 kms.
Major areas covered are Punaloor, Pathanapuram, Manimala, Pala and Thodupuzha.
Five Bridges will be constructed in this stretch. The road passes through Kollam-
Pathanamthitta, Kottayam and Idukki districts. The portion from Punalur-Ponkunnam is
proposed under PPP (modified annuity) arrangement. The bidding documents are
prepared through the Transaction Advisor and for pre-qualification of bidders is in
progress.
1.2.0.6 Perumbilavu - Pattambi – Perinthalmanna – SH 39 Perumbilavu- Pattambi-Perinthalmanna Road Link of SH 39 is included in the package
(Starts at Kuttinad Jn). The growth centre connected is Pattambi town
Length: 41 kms. The road passes through Thrissur, Palakkad and Malappuram Districts.
Monthly Progress Brief – August 2016 Page 8
The details of approval are as under: Project appraisal - April 2013
Loan agreement signed - 19 June 2013
Loan Effectiveness date - Sept 6, 2013
Project cost approved by World Bank - US$445 ml
World Bank (IBRD) Loan Assistance - US$216 ml
Project implementation period - 30th Oct 2013 to Dec 31, 2018
Expected closing date (Loan) - April 30, 2019
Fiscal Year FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019
Allocation Annual 22 43 45 54 32 20 Cumulative 22 65 110 164 196 216
1.2.0.7 The Finance plus agenda of KSTP – II 1. Upgrading Punalur – Ponkunnam Road under PPP (Annuity)
2. Development of Model Safe Corridor Kazhakuttam – Adoor Section (80 km)
3. Development of Oxbow land (left out lands)
1.3 Overall Implementation:
Project Staffing: KSTP is managed by a Project Director, in the Rank of a senior level Chief
Engineer assisted by one Chief Engineer, a Superintending Engineer and other engineers
and officers. The Technical Wing headed by the Chief Engineer is responsible for activities
related to engineering, environment, social and contract management. Further, the legal
contract management cell is headed by a legal professional. KSTP has qualified and
experienced Social and Environmental Experts and a Project Management Advisor. The
Finance Wing headed by a Finance Controller (deputed from the Secretariat) has a
qualified Finance Manager with support staff. On the field, the KSTP has Two
Superintending Engineers, Five Divisions located at Kottarakkara, Muvattupuzha,
Kuttippuram, Kannur, Ponkunnam each headed by an Executive Engineer to monitor
project progress.
Project co-ordination: Govt. of Kerala has established two committees to monitor,
coordinate, and expedite project activities. The Project Steering Committee chaired by
the Chief Secretary, has its main functions to review and approval of recommendations
regarding acceptance of tenders and taking the final decisions on all matters concerning
procurement and monitoring of project activities. The members of the committee are
Additional Chief Secretary (Finance), Secretaries to Government, PWD, Law Department,
Monthly Progress Brief – August 2016 Page 9
Revenue, Chief Engineer, R&B, Project Director, KSTP, Chief Engineer (Projects) KSTP. There
is an Evaluation Committee headed by the PWD Secretary and comprising the Project
Director, KSTP and Chief Engineer (Projects), to make recommendations on any issues on
procurement as may require approval of the Steering Committee.
1.4 Project Components
1.4.0.1 Road Upgrading Works:
This component will include upgrading 363 kms of strategically important State Highways
to complete network connectivity in the state with the objective of reducing travel time
between key socio-economic centers.
1.4.0.2 Road Safety Management:
This component will support the strengthening of the road safety management systems in
Kerala with the objective of arresting the increase of crash fatalities in the state. This
component will finance various initiatives building on the work already undertaken during
the first project including a safe corridor demonstration project, implementation of local
level programs utilizing the challenge fund and advisory support for road safety activities.
The road section improved under KSTP-I from Kazhakuttom - Venjaramoodu-Adoor is
proposed to be developed as Safe Corridor Demonstration Project (80 km)
1.4.0.3 Institutional Strengthening The objective of this component is to improve the sustainability of Kerala’s state road
network with respect to its functional adequacy, financial viability and capacity of key
state road sector institutions to deliver road infrastructure and services that are responsive
to road user needs. The major initiatives include Modernization of Road Sector. The
development and Management of a Strategic Road Network is proposed under the
Road Sector Modernization Program.
2.1 Project Description 2.1.0.1 Road Upgradation Under Item Rate Contract
This component will include upgrading of 240 km of State Highways through FIDIC based
input contracts and conventional item rate contracts as noted below.
1. Pilathara - Pappinissery Road – 20.90 km
2. Kasaragod – Kanhangad Road – 27.76 km
3. Thalassery – Valavupara Road
Monthly Progress Brief – August 2016 Page 10
(Rearranged as 3A & 3B – 53.10 km
4. Ponkunnam – Thodupuzha Road – 50.30 km
5. Chenganur – Ettumanoor Road – 41.00 km
6. Ettumanoor – Muvattupuzha Road – 47.00 km
7. Perimbilavu – Pattambi- Perinthalmanna Road - 41.00 km
2.1.0.2 Road upgradation under PPP (Modified Annuity) mode Punalur - Ponkunnam stretch (82 km) of Punalur – Thodupuzha Road
2.2 Sub Component A1 (US$322 mn)
Consists of the following civil contracts:
SI. No.
CONTRACT PACKAGE NAME OF WORK LENGTH (KM)
1. KSTP-II/UG-1 Kasargod – Kanhangad 27.78
2. KSTP-II/UG-2 Pilathara – Pappinisery 20.90
3. KSTP-II/UG-3A Thalassery – Kalarode 28.80
4. KSTP-II/UG-3B Kalarode - Valavupara 25.20
5. KSTP-II/UG-4 Chengannoor - Ettumannoor 45.40
6. KSTP-II/UG-5 Ettumannoor- Muvattupuzha 40.96
7. KSTP-II/UG-4A Thiruvalla Bypass along Chengannoor - Ettumannoor
2.3
8. KSTP-II/UG-6 Ponkunnam - Thodupuzha 50
9. KSTP-II/UG-7 Perumbilavu - Perinthalmanna 41
2.3 Supervision Consultancy
Under this component, 2 supervision consultancies CSC1 and CSC 2, Independent
engineering services, and Transaction Advisory Service for PPP are included. Contract
Agreement for Consultancy for CSC 1 for 190 Km of upgradation road has been executed
with M/s Egis International in JV with Egis India Consulting Engineers Pvt. Ltd on 28.02.2013
and mobilized and in place. Egis has established rented office for Team Leader at
Thiruvananthapuram near to Client’s Office and started functioning from April 2013. Also
RE offices at Kanhangad in Kasargod District for Package - 1, Pazhyangadi in Kannur
District for package – II and at Uliyil near Mattannur in Kannur District for package – III,
Pallam in Kottayam for Package IV, for Package V at Koothattukulam.
M/s MSV International USA is the selected consultant for Construction Supervision for the
Ponkunnam – Thodupuzha stretch (50 km) CSC-2. They have established their Resident
Monthly Progress Brief – August 2016 Page 11
Engineer cum Team Leader’s office at Ponkunnam. The length of road covered is 50 km
and the assignment commenced on 15 May 2014.
2.4 Sub Component A2 (US$ 91 mn) DPR for this sub component (Punalur – Ponkunnam – 82 Km under PPP) completed and
schedule prepared by the consultants. M/s L&T Ramboll, Chennai in association with
M/s Fortress has been selected for the Transaction Advisory Services and activities in
progress. The Investor Meet was held on March 2015 at Kochi. The bidding process for
pre-qualifying bidders is in progress. There was only one qualified bidder and hence re-
bid has been invited after obtaining no objection from Bank.
2.5 Component B – Road Safety Management (US$ 22 mn) The baseline survey for the proposed safe demonstration corridor has been completed by
‘NATPAC’ and report shared with Bank. M/s VicRoads, Australia has been selected as
consultant for Road Safety Capacity Building and program management and activities in
progress. The design activities on the Safe Corridor Demonstration Project (SCDP) are
completed and works tendered and awarded.
2.6 Component C – Institutional Strengthening (US$ 10 mn) 2.6.0.1 Consultancy Services
Procurement for the following Consultancy services was initiated. Some are completed
and others are at different stages of progress
1. Consultancy for Road User Perception Survey has been completed for 363 Km of
Project Roads through M/s Sherwood Consultants and report shared with Bank.
2. Consultancy for Prioritization and DPR Preparation for 1000 Km of Improvement of
State roads was entrusted with M/s Egis India Consulting Engineers Pvt. Ltd and final
report submitted. DPR for 439 km roads has been completed. The preliminary
project report for 1106 km was submitted to Government for posing for External
Financial Assistance.
3. Consultancy for Strategic Option Study (SOS) for 8570 Km newly declared MDR was
completed by M/s CDM Smith Associates Pvt. Ltd. Study report has been handed
over to PWD and further action to improve these roads will be taken by them using
their own funds.
4. Consultancy service for Developing Multi Model Integrated Transport Hub at 3
cities, Trivandrum, Kozhikode and Kochi was completed and report forwarded to
Monthly Progress Brief – August 2016 Page 12
Government. This report was also shared with NATPAC for consideration while
preparing Comprehensive City Development Projects.
5. The EoIs for the Packages II, III and IV in SRN have been evaluated and shortlisted.
The RFP has been sent to the consultants and pre-bid conference was held on
28.03.2016. The technical bids were received. One bid was received for Package
II and one bid was qualified for Package IV. The Steering Committee rejected
these proposals and decided to rebid. For Package III, the Technical Proposal of
the three consultants were approved for Financial proposal opening.
6. The assignment for Integrated Information Management System Development is
being entrusted to NIC.
7. The Project Management Software has been installed and training given to CSC
and KSTP Engineers. The PMS is operationalized.
8. The assignment for “Community Participatory Road Safety and Asset Management
was proposed for re-bidding and held up due to court order. The Bank has issued
no objection for rebidding. The Hon’ble High Court of Kerala has up held the
decision of the Steering Committee and the Steering Committee now decided to
re-bid for the assignment. The ToR has been revised by including the TO and SO.
The final clearance for publishing the EoI in UNDB is awaited.
2.7 Project Cost and Disbursement
Sl No Claim Date
EXPENDITURE in Lakh
AMOUNT CLAIMED in Lakh
DISBURSED BALANCE FUNDS AVAILABLE FOR CLAIM (MUSD) USD in
millions
TOTAL TOTAL TOTAL TOTAL
216.00
Front end fee 0.54 215.46
1 Retroactive 15.06.12 to 15.06.13
1,863.95 1,043.00
1.69 213.77
2 1st Quarter 213.77
3 2nd Quarter 01.07.13 to 30.9.13
1,355.79 764.00
1.23 212.54
4 3rd quarter 01.10.13 to 31.12.13
1,906.01 1,071.00
1.71 210.82
5 4th quarter
01.01.14 to 20.03.14
2,696.00 1,510.00
2.50 208.32
21.03.14 to 31.03.14
53.79 30.00
0.05 208.27
6 1st Quarter 2014-15
01.04.14 to 18.06.14
1,826.41 1,023.00
1.70 206.57
19.06.14 to 30.06.14
14.69 8.23
0.01 206.56
7 2nd Quarter 01.07.14 to 30.09.14
1,405.61 787.00
1.27 205.29
8 3rd Quarter 30.09. 14 to 31.12.14 3,790.21 2,124.00
3.44 201.85
9. 4th Quarter 01.01.2015 to 3,706.35 2,076.00 3.32 201.85
Monthly Progress Brief – August 2016 Page 13
28.02.2015
10. 4th Quarter 01.03.2015 to 31.03.2015
11. 1st Quarter 2015-16
01.04.2015 to 06.06.2015 and 30.06.2015
3,704.89 2,075.00 3.32 195.21
3534.13 1991.00 3.13 192.08 154.40 86.00 0.14
12 2nd Quarter 2015-16 30.09.2015 3527.06 1977.00 3.04 180.38
13. 3rd Quarter 01.10.2015 to 31.12.2015 10338.17 5790.00 8.51 180.90
14. 4th Quarter 01.01.2016 to 13.03.2016 6413.18 3591.00 5.38 125.00
15. 4th Quarter 14.03.2016 to 31.03.2016 2861.91 1603.00 2.41 172.50
16. 1st Quarter IInd Quarter
01.04.2016 to 10.06.2016 2037.40 1141.00 - 172.50
17. -do- 11.06.2016 to 22.06.2016 2957 1656.00 2.40 170.90
Total 47.55 168.45
Progressive Expenditure and amount Reimbursed – Status as on August 2016
Year Cumulative Expenditure (INR Crores)
Progressive Amount Reimbursed (INR Crores)
2013-14 78.75 44.42 2014-15 223.24 125.40 2015-16 491.53 275.51 2016-17 589.34 303.25 2017-18 2018-19
Estimated Actual loan allocation and disbursement received (Bank’s Financial Year (January to December) (US$ million)
0
100
200
300
400
500
600
700
1 2 3 4
INR
CRO
R
E
YEAR
Cumulative Expenditure (INR Crores)
Progressive Amount Reimbursed (INR Crores)
Monthly Progress Brief – August 2016 Page 14
Fiscal Year FY 2014
(Jan-Dec) FY 2015
(Jan-Dec) FY 2016
(Jan-Dec) FY 2017
(Jan-Dec) FY 2018
(Jan-Dec) FY 2019
(Jan-Dec) Allocation Annual 22 43 45 54 32 20 Cumulative 22 65 110 164 196 216 Disbursement Received so far 14.15 21.46 11.93 Cumulative
14.15 35.61 47.55
3.0 Executive Summary 3.1 Upgradation Works The work for Packages 1, 2, 3A & 3B, 4, 4A, 5 and 6 are in progress. The work in original
Package 3 was terminated due to poor performance of the contractor, and arranged as
3A and 3B. The work for Package 8 is under PPP (Hybrid Annuity) and bidding is to
prequalify contractors is in progress. The due date of receipt of application is 24.10.2016.
The work for Package 8 is not taken up as upgradation, due to non availability of land.
This is being taken up as Heavy Maintenance within the available land (surface
strengthening).
363 Km of upgradation civil works are divided into 9 Contract packages:
SI. No.
CONTRACT PACKAGE NAME OF WORK CONTRACTOR
1. KSTP-II/UG-1 Kasargod – Kanhangad M/s RDS Projects, Kochi
2. KSTP-II/UG-2 Pilathara – Pappinisery M/s RDS Projects, Kochi
3. KSTP-II/UG-3A Thalassery – Kalarode M/s Dinesh Chandra R. Agrwal
4. KSTP-II/UG-3B Kalarode – Valavupara M/s EKK Infrastructure Pvt. Ltd.,
4. KSTP-II/UG-4 Chengannoor - Ettumannoor M/s Delma - Sreedhanya JV
5. KSTP-II/UG-5 Ettumannoor- Muvattupuzha M/s NAPC Ltd, Chennai
6. KSTP-II/UG-4A Thiruvalla Bypass along (Chengannoor – Ettumannoor) M/s EKK & Co, Kochi.
7. KSTP-II/UG-6 Ponkunnam - Thodupuzha M/s GHV – EKK JV
8. KSTP-II/UG-7 Perumbilavu – Perinthalmanna (EPC) LA initiated and proposed as strengthening of existing road surface
9 KSTP-II/UG-8 Punalur – Ponkunnam (PPP) Bidding to quality bidders is in progress.
The works are being executed under FIDIC (5th edition) Conditions of Contract. The work
involves improvement of State Highways including geometrical improvements and
realignments to standard 2 lane of 7 m carriageway and 1.5 m paved shoulders. The
Construction Works include:
Monthly Progress Brief – August 2016 Page 15
Widening the existing pavement where it is less than design width;
Scarification, clearance, earthworks,
Granular sub-base, wet mix macadam base course, bituminous mix surfacing,
Construction of overlays to the existing pavement, inclusive of regarding to a designed vertical profile;
Geometrical realignments at specific locations;
Construction of paved shoulders;
Construction and maintenance of diversion roads
Construction of lined and unlined longitudinal drains, covered drains and footpaths in urban areas;
New culverts, new bridges and rehabilitation of existing bridges/culverts and protective works
Provision of road signs and markings;
Provision of traffic safety features - road furniture and other road safety appurtenances,
Routine maintenance and maintenance during Defects Rectification Period.
Environmental protection measures and Social enhancement works/ landscaping works etc.
3.2 Summary of Progress (works) The following tables present the summary of progress in each contract package during the month under report (August 2016).
Contract packages Contract value (Rs. Crore)
Achieved cumulative percentage upto end
August 2016
Balance period (months)
KSTP/PMT/UG-I 1,33,05 55.80% -
KSTP/PMT/UG-II 118.20 50.78% -
KSTP/PMT/UG-IIIA 156.59 - 22
KSTP/PMT/UG-IIIB 209.58 - 22
KSTP/PMT/UG-V 171.49 42% 5
KSTP/PMT/
UG-IVA 31.80 52% 1
KSTP/PMT/UG-VI 227.13 101.05% 5
KSTP/PMT/UG-IV 293.58 43.90% 15
Monthly Progress Brief – August 2016 Page 16
3.2.0.1 Details of Supervision Consultancy Assignments:
Name of consultant
Contract signed
Contract Period
Commencement Date
Contract Amount (Rs.) Work Package
CSC-1 – M/s Egis International in JV with M/s Egis India Pvt. Ltd.
28.02.2013 42 months 04.04.2013 18,36,04,600
I, II, III, IV, IVA & V
(190 km)
CSC-2 – M/s MSV International USA 14.05.2014 30 months 14.05.2014 4,41,88200
VI (50 km)
3.3 General Issues: The progress is not as per programme. The major factors that hindered the progress of
works were:
1. Delay in obtaining statutory clearances for erection of plants and crushers from the
State Pollution Control Board, Mining and Geology Department and local bodies.
2. Unprecedented unseasonal rains affected adversely works in all the contract
Packages in the initial stages
3. Resistance in identifying, erecting and operating crushers and quarry from the
local people.
4. Poor cash flow problems with the contractors at the initial stages
5. Shortage of machinery, labour force in most of the contracts.
6. Frequent changes made in key personnel in some of the contracts by the
contractor
7. Migrant labours working in all packages and labourers not available during festival
season for long duration.
8. Lack of planning and managerial issues in contracts I, II & V
9. Work Contract-III terminated. Balance works procured under two contract
(3A & 3B)
10. Delay in getting Environmental Clearance from Government Agency for
excavation and conveyance of earth from borrow area.
All these issues are now sorted out and the works are in progress now. The contractors
were instructed to speed up the works to show better results. Contract Package-III
terminated due to poor performance of the contractor and rearranged as IIIA and IIIB
and work in progress.
Monthly Progress Brief – August 2016 Page 17
Scope of Works Viaduct – 1
Major Bridge – 2
Minor Bridge _ 2
Widening Bridge – 2
New culverts _ 16
Widening Slab culverts – 16
Reconstruction _ 9
Foot path _ 6.7 Km
Drain – 22.20 Km
Solar Lights
THE FOLLOWING SECTIONS DESCRIBE CIVIL WORKS CONTRACT PACKAGES IN DETAIL:
4.1 Current Status of Works 4.2 Contract Package I
Upgradation of Road from Kasargod to Kanhangad of SH 57
4.3 Contract Details Letter of Acceptance Date
:: 06.03.2013
Agreement Date :: 01.04.2013
Name of Contractor :: M/s RDS Projects Ltd, Kochi
Contract Price :: Rs.133,05,79,485/-
Notice to Commence :: 24.04.2013
Total Length :: 27.78 Km
Contract Period :: 24 months
Completion Date :: 23-04-2015 extended to 30.06.2016
Defect Liability Period :: 365 days
1st Milestone :: Km. 0+000 – Km. 10+000
2nd Milestone :: Km. 0+000 – Km. 20+000 - 23 Oct 2014 revised to 23 Feb 2016
3rd Milestone Km. 0+000 – Km. 27+780 - 26th April 2015 and revised to 31.03.2017
The contractor has been given a final chance to complete the works by end March 2017
Monthly Progress Brief – August 2016 Page 18
4.4 Progress of Works up to month (July 2016)
4.4.0.1 Structure - progress during the current month Viaduct at Km.3+392 –All major Structure works and bituminous wearing coat over deck
slab completed. The Miscellaneous works including slip road, crash barrier on
approaches are yet to be completed and opened to traffic.
Chithari Bridge at Km.18+400 – Deck Slab Completed. Protection works & safety
installations works are in progress and opened to traffic.
MS- I Box Culverts – All culverts are completed out of 16nos – Box Culvert at Km.1+076,
Km.1+750, Km.1+974, Km. 2+215, Km. 2+454, Km. 2+704, Km. 4+970, Km. 5+500, Km. 5+737,
Km. 6+630, Km. 8+894, Km. 11+620 and Km.11+820 have been substantially completed.
Pipe Culvert 01 no. – Km.4+320 is completed.
Slab Culverts 05 nos. – Km. 7+015, Km. 7+463, Km. 8+093, Km. 8+679 and 9+921 are
completed.
MS- II Box Culverts – Km. 13+830, Km.15+490, Km.16+427, km.17+816, km.18+011,
km.19+364 and km.20+365 Completed. km.21+065 crash barrier wok balance.
MS- III Box Culverts – 03 no’s culverts are in progress (km 27+085 & km 27+675 Deck Slab
completed), 5 no’s yet to be started.
Box cell Minor Bridges
Km. 2+600 – Slab completed at BHS.
Km. 6+510 – Slab completed at LHS and RHS retained.
On 04th march 2016, the Engineer has issued notice to correct under clause 15.1 of GCC
to the Contractor to make good the delays by 15th March 2016. Further Engineer letter
dated 10th March 2016, the date of notice to correct and make good the failure is revised
to 31st March 2016
A summary of progress for major items is as follows:
Milestone
I (Km. 1+000 to Km.
2+800 and Km. 3+800 to Km.
12+000)
II (Km. 12+000 to Km.
22+000)
III (Km. 0+000 to Km.
1+000, Km. 2+800 to Km. 3+800 and Km. 22+000
to Km. 27+780)
Length in km 10 20 27.78
Length handed over to contractor in km 10 20 27.78
Unencumbered land available to the contractor in km
10 20 27.78
FW HW FW HW FW HW
Monthly Progress Brief – August 2016 Page 19
Milestone
I (Km. 1+000 to Km.
2+800 and Km. 3+800 to Km.
12+000)
II (Km. 12+000 to Km.
22+000)
III (Km. 0+000 to Km.
1+000, Km. 2+800 to Km. 3+800 and Km. 22+000
to Km. 27+780)
GSB completed in km 10.000 - 5.583 1.646 2.490 0.690
WMM completed in km 10.000 - 5.187 2.048 2.470 0.620
DBM completed in km 10.000 - 5.187 2.048 2.000 1.080
BC completed in km 10.000 - 4.710 0.430 2.000 -
CD completed in Nos. 22 07
4.5 Schedule of Culverts and Drainage works
4.6 Progress Considering the Contract price up to this Month (August)
Up to previous Month This Month Cumulative to end of this Month
Target Achieved Target Achieved Target Achieved 55.57% 54.63% 2.44% 1.170% 58.620% 55.80%
Nature of work
Total num
ber
No. dwgs app
roved
Num
ber completed
Num
ber in progress
Num
ber remaining
Total N
umbe
r
No. dwgs app
roved
Num
ber completed
Num
ber in progress
Num
ber remaining
Total num
ber
No. dwgs app
roved
Num
ber completed
Num
ber in progress
Num
ber remaining
Culverts
Widening Slab/Box Culverts 9 9 9 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 1 ‐ 1 ‐
Reconstruction Slab/Box 7 7 7 ‐ ‐ 7 7 6 1 ‐ 3 2 ‐ 2 1
New Box Culvert/Pipe culvert
6 6 6 ‐ ‐ 1 1 1 3 ‐ ‐ ‐ 3
Total culverts 22 22 22 ‐ ‐ 8 8 7 1 ‐ 7 3 ‐ 3 4
Bridges/ROB Retained** 2 ‐ ‐ ‐ ‐ 2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bridges Widening *** 2 2 2 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
New Bridges/Viaduct* ‐ ‐ ‐ ‐ ‐ 1 1 1 ‐ ‐ 1 1 1 ‐ ‐
Milestone ‐ I (1 to 2.8Km and 3.80 to 12.0Km )
Milestone ‐ II (12 to 22Km.)Milestone ‐ III
(0 to 1.0Km, 2.80 to 3.80Km and 22 to 27.78Km.)
Monthly Progress Brief – August 2016 Page 20
4.7 Physical progress Bar Chart
4.8 S-Curve
104992.95
33785
22457
51841.2
47972.99
9607
7417
10783.014
103450.60
33785
22457.00
51533.00
47362.00
9607.00
7417.00
10723.06
334052
52246.87
94397
63492
79468
26990
14823
14334
0 50000 100000 150000 200000 250000 300000 350000 400000
Excavation (cum)
Embankment (cum)
Subgrade (cum)
GSB (cum)
WMM (cum)
DBM (cum)
BC (cum)
Concreting (cum)
Estimated BOQ Quantity
Cumulative target to end of this Month
Cumulative Achieved to end of this Month
Monthly Progress Brief – August 2016 Page 21
4.9 Strip map
4.10 Utilities
Shifting of utilities such as water lines, telephone cables and associated accessories are in
progress. Relocation of electric lines/poles and cutting of trees are in progress during this
month. Electrical Poles shifted in Mile Stone I are 344 nos, 366 nos in Mile Stone II & 105 nos
0 100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
Bituminous Concrete ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Dense Bituminous Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Wet Mix Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Granular Sub base ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Subgrade ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
EW - Embankment ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pothole repair & patching
Pothole repair & patchingEW - Embankment ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Subgrade ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Granular Sub base ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Wet Mix Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Dense Bituminous Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Bituminous Concrete ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
RIG
HT
SID
EL
EFT
SID
EChainage (Km)
Culverts & Bridges
5300
5500
5600
5700
5800
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
9900
1000
010
100
1020
010
300
1040
010
500
1060
010
700
Bituminous Concrete ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Dense Bituminous Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Wet Mix Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Granular Sub base ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Subgrade ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
EW - Embankment ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pothole repair & patching
Pothole repair & patchingEW - Embankment ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Subgrade ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Granular Sub base ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Wet Mix Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Dense Bituminous Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Bituminous Concrete ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
RIG
HT
SID
E
Culverts & Bridges
Chainage (Km)
LEFT
SID
E
1080
010
900
1100
011
100
1120
011
300
1140
011
500
1160
011
700
1180
010
700
1100
011
300
1150
011
700
1190
012
000
1210
012
200
1230
012
400
1250
012
600
1270
012
800
1290
013
000
1310
013
200
1330
013
400
1350
013
600
1370
013
800
1390
014
000
1410
014
200
1430
014
400
1450
014
600
1470
014
800
1490
015
000
1510
015
200
1530
015
400
1550
015
600
1570
015
800
1590
016
000
1610
0
Bituminous Concrete ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Dense Bituminous Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Wet Mix Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Granular Sub base ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Subgrade ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
EW - Embankment ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Pothole repair & patching
Pothole repair & patchingEW - Embankment ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Subgrade ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Granular Sub base ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Wet Mix Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Dense Bituminous Macadam ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Bituminous Concrete ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
RIG
HT
SID
E
Culverts & Bridges
Chainage (Km)
LEFT
SID
E
Monthly Progress Brief – August 2016 Page 22
in Mile Stone III. Shifted up to date and 815 poles and some of the accessories are
received by the Contractor. Total 413 numbers of the trees have been cut till date 70 Nos
are balance. Contractor shifted 815 nos. of electric poles and 42 no. of transformer till
date.
4.11 Potential Issues The very poor cash flow of Contractor has seriously hampered the progress of works. No
improvement is observed in the progress of activities during the month also despite the
assurance given by the Contractor to Employer and CSC.
Lack of resources at site which reflected frequent change in planning of works at site,
There were delays in shifting of utilities. However Employer and the Contractors are
coordinating with various Service Providers like KSEB, KWA, BSNL and other service
providers for shifting of utilities and tree cutting along the project.
The Additional Chief Secretary, PWD has instructed complete the Project by 31.03.2017
Instructions are issued to the Contractor for taking stringent measures to enhance the
progress of works. Clause 15.1 Notice to Correct issued on 4.03.2016.
4.12 Payments to the Contractor Mobilization advance, Equipment advance and Interim payment Certificate for works
was paid to the Contractor amounting to Rs. 70.46 crores. Timely payments are released
to the contractor. The Steering Committee held on 28.06.2014 lowered the threshold limit
of minimum IPC amount for Rs. 1.5 crores from Rs. 3.00 crores to facilitate the cash flow of
contractor. There is no pending payment to contractor.
4.13 Implementation of EMP
4.13.0.1 Environment Management at work sites The progress of the work at site is unsatisfactory during the month. Contractor completed
19 km DBM and14km BC so far. Contractor has started another work front from CH 25 to
27km and culvert works and some road works completed, but drain works is pending.
Since the contractor was kept opened the construction fronts for long time without work,
the safety provisions at sites was also deteriorated. The environmental expert visited the
site on 26thth August and observations were communicated to the contractor for taking
Monthly Progress Brief – August 2016 Page 23
action. The safety of construction site is a primary concern and requires further
improvement.
The drain connection and culvert connection remaining are to be completed. The
overlay works at Chandragiri bridge completed but the unsafe railing height is not
increased. The crash barriers are to be provided on the approaches and side road
connection to be improved. This was pending for a long time.
The junction improvement works at Kasergod town not completed. The culvert
construction at this junction is not started. Foot path and bus bays are also pending.
The drain work under the viaduct portion now completed but cover slab is to be provided
at hill bottom to avoid silting. Land scape and tree planting at this location has to be
started urgently.
The debris and cofferdam from the viaduct and Chithari bridge site is partially removed.
Though the contractor has been directed to take action to remove complete materials
before monsoon, contractor informed that revenue dept is not permitting transport of
materials.. Contractor has started planting trees and so far 240 Nos have been planted. It
is also noticed that the pit was backfilled and no tree guard placed. Direction issued to
the contractor to rectify the same. The protection works in the hill cutting area not fully
completed. Some sliding was occurred during last month and the traffic through the road
was stopped by Dist Collector. The protection works are still continuing .The slow pace of
the work at this location of high cutting side also contributed for the land slide.
The enhancement works in front of the Thrikanad temple in progress, Two light poles
installed at this location are to be shifted backwards to construct the bus bay.
All workers shall wear the required protection as per the job requirements. Safety shoes,
helmets, glosses shall be used where ever required. The statutory clearance obtained for
plants due to expire by January 2017. Contractor has to obtain extension of validity from
PCB before expiry of the above said date.
It is also noticed that no action taken report on the site visit observation of the
environmental expert was submitted by the contractor .The employer directed the
consultants to get the report from the contractors urgently. Action has been taken by the
consultant.
After improvement of the road lot of accidents reported most of the case the reason
pointed out is over speed. The local police have put some barricades to reduce the
speed but it is not in a scientific way. There for speed reduction by providing rumble strips
and warning sign boards, raised pedestrian crossings are urgently to be constructed.
Further the spacing of studs provided now is 18 m at center, this has to be reduced as 5m
Monthly Progress Brief – August 2016 Page 24
as provided in the contract drawing. Information sign boards of all rivers, tourist places are
to be placed in the completed road stretches.
4.13.0.1 Traffic Management and Road Safety Measure The Contractor has not provided the required safety precautions such as flags, safety
signboards, traffic cones, blinkers and safety tapes at the work site as require Since the
construction works are very slow it also affected the traffic management measures.
Resident engineer has issued warning to improve the safety at sites and if not comply
penalty will be imposed.
Monthly Progress Brief – August 2016 Page 25
4.14 Photograph
11+810 to 11+822.5 Temple Stepping work (RHS) +392 Viaduct P1-P2 Surface preparation for
Painting in progress
WMM top layer at km 27+160 to 27+625 (RHS) DD checking at km 26+480 to 26+800 (RHS)
Monthly Progress Brief – August 2016 Page 26
15.1 Contract Package - 2
Upgradation of Road from Pilathara to Pappinissery of SH 67
15.2 Contract Details Letter of Acceptance Date :: 05.03.2013
Agreement Date :: 01.04.2013
Name of Contractor :: M/s RDS Projects Ltd, Kochi
Contract Price :: Rs.118,29,77,833/-
Notice to Commence :: 23.04.2013
Total Length :: 20.90 Km
Contract Period :: 24 months
Completion Date :: 22nd April 2015 extended to 20 June 2016
Defect Liability Period :: 365 days
1st Milestone :: Km. 0+000 – Km. 08+000 - 22nd February 2014 Revised to 30 September 2015
2nd Milestone :: Km. 0+000 – Km. 14+000 - 13 February 2016
3rd Milestone :: Km. 0+000 – Km. 20+900 - 22 April 2015 revised to 31.03.2017
Scope of Works New ROB – 2 Repair of Bridge – 2 New Box culverts _ 9 Widening Slab culverts – 20 Reconstruction _ 8 Drain – 26.04 Km Foot path _ 12.6 Km Solar Lights -
Monthly Progress Brief – August 2016 Page 27
15.3 Progress of Works 15.3.0.1 Structure – Overall Progress
ROB @KM 7+420 (Thavam):
Railway Department has approved GAD in July-2014.
Test pile casting has been done for ROB @KM7+420 and initial load test on pile is
completed. Routine Pile load test for A2/B and P1/D completed and results are yet
to be submitted.
ROB at Km. 7+420 Piling Work started on 18/12/14, Piling Work 24 No’s out of 24 No’s
completed. Pile cap and abutment / pier up to abutment cap / pier cap bottom
level for A1 (new P3), P1 (new P4), and P4 (new P7) & A2 (new P8) completed.
KSTP has directed CSC to provide design and details of additional three spans
each on A1 and A2 sides of ROB at km7+420. The Confirmatory boring pier
locations of these span have been started by the agency M/s Geo Foundations &
Structures Pvt. Ltd on 29th Feb. 2016 and completed on 13th march 2016. The
reports has been submitted by Geo Foundations & Structures Pvt. Ltd on 08th April
2016.
GFC drawings for additional spans issued to the Contractor on 05thMay 2016.
Contractor mobilized the machineries for piling works during the first week of June
2016 and pile boring works for additional spans. 16 nos of pile (out of total 36 Nos)
casting completed for additional spans and boring for 2 Nos are in progress. The
reinforcement work for P7 & P8 (Old P4 & A2) are in progress
Railway gate shifting works completed during March 2016. The Piling works
complted commenced by railway department (railway span) and pier cap work
for Pappimissery side is in progress. Pile load testing loading is in progress.
ROB @KM 19+950 (Pappinissery):
Test pile casting has been done for ROB @KM19+950 and initial load test on pile
completed.
Piling and Pile Cap works completed.
Abutment / pier cap completed.
Girder and deck slab for A1-P1, P1 to P10 and P13-P22 and P22-A2 completed.
Girder & slab for 20 span completed out of 22 Nos. Girder concrete for P13-P14
completed.
Retaining wall works at A1 & A2 approaches are in progress.
Monthly Progress Brief – August 2016 Page 28
Ramapuram Bridge @ Km.4+260:
Test piling work started for Ramapuram Bridge @ Km.4+260 on 24th June -2015 and
initial load testing completed on 23.01.2016. Dynamic load test for A1/B completed
on 17.03.2016.
Piling Work 16 No’s out of 16 completed. Pile cap work completed (Out of total 4
Nos, 4 completed). Pier cap / Abutment cap completed. The ground preparation
for superstructure work is in progress.
The status of CD works are stated below:
There are 38 Nos culverts in the project for widening / reconstruction. 22 Nos
completed except apron works. 3 Nos are in progress and 8 Nos are yet to be started.
Due to non- availability of outlet for disposing the water from culvert, the culvert at
km 08+560, 14+070, 15+110, 17+780 and 18+970 are deleted.
Drain cover slab 268 Nos. casting completed during this month.
Overall progress up to August 2016
For previous Month This Month Cumulative to end of this Month
Target Achieved Target Achieved Target Achieved 50.06% 47.93% 1.97% 2.85% 52.03% 50.78%
15.4 Work progress considering the contract price August 2016 A summary of progress for major items is as follows.
Length in km
20.9
Length handed over to contractor in km 20.9
Unencumbered land available to the contractor in km 20.9
Stretch completed in all respects in km -
FW HW
GSB completed in km 12.355 1.690
WMM completed in km 12.280 1.640
DBM completed in km 10.550 3.100
BC completed in km 9.100 0.100
CD completed in Nos. 22 Nos
Monthly Progress Brief – August 2016 Page 29
15.5 Physical Progress
15.6 S-Curve
59781
12116
16402
30104
37375
6912
4189
8117
5274
58077
10780
10311
29120
31883
5747
3905
5741
5359
158361
42903
93145
42722
57501
12801
10442
21139
4839
180833
13583
93145
42722
57501
19202
10442
21139
5656
0 50000 100000 150000 200000
Excavation (cum)
Embankment (cum)
Subgrade (cum)
GSB (cum)
WMM (cum)
DBM (cum)
BC (cum)
Concreting (cum)
Bored Pile (Lm)
BOQ Quantity
Cumulative target to end of this Month (R5)
Cumulative target at the end of this month (Programme 07.07.2016)
Cumulative Achieved to end of this Month
Monthly Progress Brief – August 2016 Page 30
15.7 Strip Chart
0 100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
Bituminous Concrete ## 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Dense Bituminous Macadam 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Wet Mix Macadam 2nd 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Wet Mix Macadam 1st 1 1
Granular Sub base 1 1
Subgrade 1 1
EW - Embankment 1 1
EW - EmbankmentSubgradeGranular Sub base ## 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ##
Wet Mix Macadam 1st ##
Wet Mix Macadam 2nd ## 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Dense Bituminous Macadam ## 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Bituminous Concrete ## 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
RIG
HT
SID
EL
EFT
SID
E
Chainage (Km)
Culverts & Bridges
5400
5500
5600
5700
5800
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
9900
1000
010
100
1020
010
300
1040
010
500
1060
010
700
Bituminous Concrete ## ## ## ## ## ## ## ## ## ## ## ##
Dense Bituminous Macadam ## ## ## ## ## ## ## ## ## ## ## ## 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Wet Mix Macadam 2nd 1 1 1
Wet Mix Macadam 1st 1 1 1
Granular Sub base 1 1 1
Subgrade 1 1 1
EW - Embankment 1 1 1
EW - EmbankmentSubgradeGranular Sub baseWet Mix Macadam 1stWet Mix Macadam 2ndDense Bituminous Macadam ## ## ## ## ## ## ## ## ## ## ## ## ##
Bituminous Concrete ## ## ## ## ## ## ## ## ##
RIG
HT
SID
E
Culverts & Bridges
Chainage (Km)
LE
FT S
IDE
1080
010
900
1100
011
100
1120
011
300
1140
011
500
1160
011
700
1180
011
900
1200
012
100
1220
012
300
1240
012
500
1260
012
700
1280
012
900
1300
013
100
1320
013
300
1340
013
500
1360
013
700
1380
013
900
1400
014
100
1420
014
300
1440
014
500
1460
014
700
1480
014
900
1500
015
100
1520
015
300
1540
015
500
1560
015
700
1580
015
900
1600
016
100
Bituminous ConcreteDense Bituminous MacadamWet Mix Macadam 2ndWet Mix Macadam 1stGranular Sub baseSubgradeEW - Embankment
EW - EmbankmentSubgradeGranular Sub baseWet Mix Macadam 1stWet Mix Macadam 2ndDense Bituminous MacadamBituminous Concrete
LE
FT S
IDE
RIG
HT
SID
E
Culverts & Bridges
Chainage (Km)
Monthly Progress Brief – August 2016 Page 31
15.8 Utilities Utilities such as Electrical line, water lines, telephone cables and associated accessories
were remaining to be relocated/ removed / shifted. Entire trees in Milestone –I were cut
and removed from site as on date. Tree cutting work is now in progress between
Km.16+400 and Km.19+660 (Milestone-II and Milestone-III).
Total number of Electric poles and transformers to be shifted from the project corridor is
953 Nos. and 19 Nos. respectively and 616Nos. of Electric poles and 9 Nos. of Transformers
have been relocated till date in between Km.0+00 to Km.16+400 and Km.19+660 to
Km.20+000. Stringing of wire has been completed for 16.27 kilometer length between
Km.0+000 to Km.20+900. There are about 20 Nos are yet to cut within ROW which obstructs
the stringing of electrical line.
Water pipe line shifting works are in progress between km 16+100 to 17+100 and from km
18+670 to km 20+900.
Total number of telephone poles to be relocated along the project corridor is 451Nos.
However the work has not been affected so far since the shifting is being done along with
road work. Shifting of Water pipe line woks are in progress in Milestone-I, Milestone-II &
Milestone-III
15.9 Potential Issues • Lack of experienced staff at site which reflected in planning of works at site, delay in
preparing Mix designs, delay in submission of working cross sections, in preparation of
survey data etc.
• The contractor has established one quarry, crusher and HM Plant for contract I and II.
The aggregate production is not sufficient to meet the requirement of both packages.
• A Court case is prevailing at High court of Kerala for providing smooth access road to
the adjacent land owners Shri. Padamanabhan Nadakkal, Shri. Bhaskaran Nadakkal
and Smt. Vineetha claimed that their access road has been disturbed due the grade
improvement (High Embankment) of the Road between Km.3+280 to Km.3+460 of the
Project road and the case is still pending in the High court of Kerala.
15.10 Payments to the Contractor Mobilization advance and Equipment advance and IPC’s was paid to the Contractor
amounting to Rs. 55.03 crore The Steering Committee held on 28.06.2014 lowered the
threshold limit of minimum IPC amount for Rs. 1.5 crores from Rs. 3.00 crores to facilitate
the cash flow of contractor. There is no pending payment to the contractor.
Monthly Progress Brief – August 2016 Page 32
15.11 Implementation of EMP
15.11.0.1 Environment Management at Work Sites The activities during the quarter were in a slow pace. Contractor completed 14 km DBM
and 10 km BC. The environmental expert visited the site on 26th August 2016 and
observations were communicated for corrective measures taken .Complaints from public
on dust emissions as the contractor has kept the work fronts for long periods. Contractor
has started tree planting works where ever possible and so far 260 trees have been
planted. Further avenue plantation is very minimal as the ROW is fully utilized for road
construction. The balance quantities can be planted and this is continuing. The
environmental enhancement measures such as construction of parking bus bays noise
barriers oxbow land development have been taken up. The side of the deck has to be
provided safety hand rails for the free movement of workers on deck. Since the bridge
work site is in town area pedestrian safety was not sufficient and direction issued to the
contractor to provide maximum safety during construction time.
The junction improvement works at Pappinassery was not started. Some mangrove and
trees at this location are to be affecting the construction and hence to be removed.
Contractor has prepared a plan showing the affected trees and mangroves and these
are marked at site and permission has to be obtained from the forest departments.
Contractor has taken action.This matter was already addressed to the employer for
obtaining the required permissions. Direction was also given to revalidate the consents
due to expire by end January.
15.11.0.2 Traffic Management and Road Safety Measures The contractor is required to provide safety precautions such as barricading, flags, safety
signboards and traffic cones at all work zones to ensure safety for all road users. Personal
safety equipment such as jackets, safety shoes, face shields and hand gloves are to be
provided to all workers as necessary. Instructions were given to provide adequate safety
sign boards and fencing all along the active work sites. The safety at Thavam ROB site is to
be increased.
Monthly Progress Brief – August 2016 Page 33
15.12 Photographs
Kerb laying in progress at km 0+000 Junction WMM Top laying (km 16+000 to 16+140 RHS)
Pier cap work for P7 in progress at ROB 7+420 Bridge Works in progress at km 4+260 16.1 KSTP/PMT/UG – III A
(Thalassery – Kalaroad) 28.80 km
Monthly Progress Brief – August 2016 Page 34
Scope of Work
Name of Contractor :: M/s Dinesh Chandra R. Agrwal
Date of Agreement :: 20.05.2016 Length :: 28.80 km Milestone – I :: Milestone – II :: Milestone – III ::
16.2 Executive Summary Commencement Date: 27th June 2016. Maintenance work of the project road is in
progress. Already 410m2 of pothole filling was done. For constructing balance portion of
half-done culverts, forming of approaches to divert traffic is going on at km 06+140
16.3 Pre-Construction Activities
16.3.0.1 Utilities Joint inspection conducted along with KSTP, KSEB, Kerala Water Authority, BSNL and other
private cable operators and list finalized.
Monthly Progress Brief – August 2016 Page 35
16.4 Moblisation of Resources
16.4.0.1 Plant & Machinery Contractor has erected concrete Batching plant and calibration done. The plant is ready
for operation. Base Camp is situated at Valliyavellicham, which is 6km away from km
16+000 (Kuthuparamba) of the project road.160DPH WMM plant is ordered by the
Contractor and is expected by the end of September 2016.
16.5 Human resources Contractor has mobilized some supervising staff, skilled workers and unskilled workers.
16.6 Work Progress in detail for this month Maintenance work of the project road is in progress. Already 410m2 of pothole filling was
done. For constructing balance portion of half-done culverts, forming of approaches to
divert traffic is going on at km 06+140
16.7 Work Programme Contractor submitted work programme. Team Leader vide letter No: ET/1A/PJ/1858 dated
25.08.2016 has directed to submit certain additional details and the same is under
preparation by the Contractor.
16.8 Quality Control Field laboratory building construction is almost completed and Contractor procured
required equipment’s for quality control tests and the installation is in progress.
16.9 Source and Material Approval Source approval of steel given for Shyam steel industries ltd and JSW steel ltd.
Source approval of Admixture given for BASF India ltd.
Source approval of Coarse aggregates and Fine aggregates given for Geo sand crusher,KSIDC,Koothuparamba.
16.10 Mix Design Mix Design for M-25 grade concrete approved which is required for culvert works. The Mix
design for M-20, M-30, M-35, M-40 and M-45 are expected to be obtained from Govt.
Engineering College, Calicut by 15.09.2016.
Monthly Progress Brief – August 2016 Page 36
16.11 Implementation of EMP - Contract Package - IIIA
16.11.0.1 General The letter of acceptance for contract 3A issued and agreement was also signed.
Even though the agreement was signed on 24th January2016,the mobilization is in a slow
pace.Errection of batching plant completed and the construction of laboratory in
progress. The contractor identified 5acres of land in Vellivelicham near Kuthuparamba
town about 5km from project road. The environmental expertof CSC visited the site on
27thAugust2016 and directed the contractor to obtain the required consents from PCB
and local panchayat. Contractor also informed that aggregate required for the project is
proposed to be purchased from local crusher. Contractor was also directed to submit the
management plan for approval before start any work. No Environmental and Safety
Officers are yet to be appointed.
Monthly Progress Brief – August 2016 Page 37
17.1 KSTP/PMT/UG – III- B (Kalaroad – Valavupara) 25.20 km
1. Contract value in crores - Rs. 209.69 crores
2. Name of Contractor - M/s EKK Infrastructure Ltd.,
3. Date of Agreement - 29.04.2016
4. Time of Completion - 24 months
5. Length - 25.20 km
6. Milestone – I -
7. Milestone – II -
8. Milestone – III -
17.2 Executive Summary The contract of Package IIIB (Kalaroad – Valavupara) has been awarded toM/s GHV-EKK
(JV) on 29th April 2016.
Notice to Proceed has been issued to the contractor vide letter No. ET/1A/PJ/1842 dt 16th
August 2016 and thereby instructed to commence the work with effect from 18th August
2016.
A tentative construction programme up to December 2016 was submitted by Contractor
on 09th August 2016 vide letter no. GHV-EKK(JV)/KLR-VLPA/16/CL/048 considering site
handing over date as base date. CSC has reviewed the programme and asked to submit
a detailed programme with resource planning, S-Curve, monthly quantity distribution etc
vide Team Leader letter No. ET/1A/PJ/1859 dated 25th August 2016.
Summary of progress achieved during the month of August 2016 is as follows.
Monthly Progress Brief – August 2016 Page 38
Iritty Bridge @ Km.42+198:- Contractor has started piling works at Iritty Bridge at Km
42 + 195. One balance pile at A1 side was casted. The boring in A2 side is in
progress.
Maintenance Works:-Maintenance work and drainage work is being executed in
various locations of the road.
17.3 Pre-Construction Activities
17.3.0.1 Mobilization of resources Contractor has started construction of Permanent base camp, casting yard, Concrete
Batching Plant, WMM Plant, Field laboratory, Store, Staff Quarters, Labour Camp,
Workshop, etc. at Kallyad on Poovam- Kallyad Road, 10 km away from Iritty bridge on the
Project road.
17.4 Human Resources Contractor has mobilized some technical staff, non-technical staff, skilled workers &
unskilled workers at site.
17.5 Quality Control/ Quality Assurance A Temporary Site laboratory for aggregate testing and concrete mix designs has been
established at 43/340 near the staff quarters. Construction of permanent field laboratory is
under speedy progress.
17.6 Source and Material Approvals Source approval for Cement (India Cements & Ramco Cements) Reinforcement steel
(VIZAG, SAIL, Jindal & Shyam Steel), Admixture (CHRYSCO), NP4 Hume pipe (Premier spun
pipe) and GI and PVC pipes (Kamal Pipes) has been given to the Contractor.
17.6.0.1 Implementation of EMP- Contract package IIIB: The agreement for contract IIIB signed on 30thApril .
No major activities in the Quarter. Contractor identified a site for establishing the base
camp and other facilities at Padiyur in Kalliad village near Irrity town (7Km.).contractor
was directed to submit the reporting formats for approval of the camp and management
plans and this was approved The CSC environmental expert visited the site on 27th August
2016 and comments attached as annexure.
Contractor has started mobilization at camp site. Construction of offices and other
facilities are in progress. The piling works of the Irrity Bridge has been started. Contractor
has been asked to obtain the consents from PCH and local panchayats.
Monthly Progress Brief – August 2016 Page 39
18.1 Contract Package IVA Construction of Thiruvalla Bypass along Chengannoor - Ettumannoor Road (SH-1) from chainage 7+390 to 9+400
18.2 Contract Details
Letter of Acceptance Date :: 29.10.2013
Agreement Date :: 29.11.2013
Name of Contractor :: M/s EKK & Co, Kochi
Contract Price :: Rs. 31,80,45,071/-
Notice to Commence :: 19.12.2013
Total Length :: 2.3 Km
Contract Period :: 24 months
Completion Date :: 06 August 2014 revised to September 6, 2016
Defect Liability Period :: 365 days
Scope of Works Major Bridges - Nil
Minor Bridge - 1 no.
Flyovers - 1 no.
Culverts - 8 nos.
Pipe Culverts - 2 nos.
Solar lights - 1380 nos.
Monthly Progress Brief – August 2016 Page 40
18.3 Work Progress
18.3.0.1 Summary of the progress up to the month Major works executed during the month are listed below.
Gravity wall at LHS of Ch : 1+126.4 - 1+150 km completed.
Gravity wall at LHS 1+120 Jn (0+000-0+006.15) RHS completed.
3 girders at P3-P4 span casted & casting of diaphragm of P2-P3 span is completed.
Casting of diaphragm of P3-P4 span in progress.
Concreting of A2 retaining wall of flyover completed.
16 nos. of drain top slab casted.
7 nos. of crash barrier along with friction slab casted.
Stressing of 3 girders of span P2-P3 & 1 girder of span P3-P4 completed
18.3.0.2 Progress achieved 4 box culverts completed.
2 Nos. Of 1200 mm dia pipe culvert completed
All 24 piles of minor bridge completed
All 42 piles of fly over at 1+350 completed
6 nos. Pile cap at flyover completed
1 no.of pilecap at minor bridge (0+380) completed.
All 6 nos of pier at flyover completed
4 nos of pier cap at flyover completed
2 nos of abutments at flyover completed.
1 no.of abutment at minor bridge completed.
184 m of concrete drain completed
Precasting of 304 number of RE wall panels completed.
Precasting of 110 nos of RCC crash barrier cum friction slab completed.
18 no.s of girder of Flyover at 1+350 completed
3 no.s of deck slab of flyover at 1+350 completed.
Embankent construction upto 15th layer completed for ch : 0+089 to 0+350 & 0+430 to
0+520 km
Embankment construction upto 4th layer completed for ch : 2+100 – 2+300 km.
Progress up to end of August 2016 is as follows:
Up to previous month This month Cumulative to end of this month
Target Achieved Target Achieved Target Achieved 78.10% 50.64% 5.03% 1.26% 83.1% 51.90%
Monthly Progress Brief – August 2016 Page 41
18.4 Physical Progress
18.5 S-Curve
22532
123022
0
3100
0
0
0
7855
227000
9737
72701
0
3062
0
0
0
5045
227229
21960
148258
20109
8750
9275
1815
1452
6989
232000
0 50000 100000 150000 200000 250000
Excavation (cum)
Embankment (cum)
Subgrade (cum)
GSB (cum)
WMM (cum)
DBM (cum)
BC (cum)
Concreting (cum)
PVD
BOQ Quantity
Cumulative Achieved to end of this month
Cumulative target to end of this month
Monthly Progress Brief – August 2016 Page 42
18.6 Potential Issues The following issues are very critical which may have adverse impact on the timely completion of the Project.
• Handover of unencumbered land at Km 1+450 to 1+750 pending and action taken
to acquire.
• Slow Progress of work due to Court order for 9 Months initially
18.7 Schedule of culverts and drainage works
18.8 Payment
Up to IPC-15 has been paid to the contractor Rs. 15.71 crore
18.9 Implementation of EMP
18.9.0.1 Environment Management at Work Sites The construction activities for Contract IV-A is in progress. Pile cap completed for A1. The
work was stopped now due to rain. The PVD for the embankment for first stage are
completed and the second stage embankments in progress. The proposal for viaduct is
under review. The safety provision at flyover is satisfactory .Form work for the third span of
the flyover is in progress and casting girder in progress.
Contractor was also directed to take measures to divert rain water from the campsite
and excavation trench for RE wall approach. The health checkup for the workers
arranged, but report awaited. Contractor was asked to submit the action taken report on
the site visit observation of the environmental expert. Contractor has submitted
application for renewing the consents from PCB.
Nature of work
Ori
gina
l num
ber
No.
dw
gs a
ppro
ved
Num
ber
com
plet
ed
Num
ber
in p
rogr
ess
Num
ber
rem
aini
ng
Rem
arks
Culverts
Pipe culvert 4 4 2 2
New Box Culvert 8 4 4 4
Total culverts 12 8 6 6
Fly over and Minor bridge 2 2 2Partly
Monthly Progress Brief – August 2016 Page 43
18.10 Photographs
P2P35th girder concreting (ch:1+301 – 1+340 km)
P1P2 deckslab after concreting (ch:1+262 – 1+301 km)
P2P3 2nd girder concreting (ch:1+301 – 1+340 km) Staging Work for P2P3 Span (1+3011+340km)
Monthly Progress Brief – August 2016 Page 44
19.1 Contract Package IV Upgradation of Road from Chengannoor to Ettumannoor of SH-1
19.2 Contract details: Letter of Acceptance :: 21.08.2014
Agreement date :: 15.09.2014
Name of contractor :: M/s Delma-Sreedhanya JV
Contract amount :: Rs. 293,58,17987
Notice to commence :: November 25, 2014
Total length :: 45-80
Contract period :: 36 months
Completion date :: 24.11.2017
Defect liability period :: 365 days
I milestone
:: 10 km upto BC level 18 months from commencement date
II milestone
:: 25 km upto BC level 25 months from commencement date
III milestone
:: 47.80 km upto BC level 36 months from commencement date
Scope of Works (45.40 Km): Construction of Major Bridges – 3
Construction of Minor Bridge – 5
New Box culverts - 9
Widening Slab culverts – 8
Reconstruction of Culverts - 59
Monthly Progress Brief – August 2016 Page 45
19.3 Pre-Construction Activities:
19.3.1 Utilities Utilities such as water lines, telephone cables and associated accessories, electrical lines
and associated accessories and trees are being removed / shifted.
Removal of stumps of trees cut by agencies engaged by KSTP is also the responsibility of
the Contractor.
Relocation of Electrical lines and Waterlines are included in the Contract.
3279 lm of 700mm, 5202 lm of 200mm & 10294 lm of 300mm DI pipe laid. 38758 lm of
160mm PVC pipe laid. Work in progress.
Electrical Utility shifted for approximately 25 km. Work in progress.
19.3.1.1 Progress Achieved - Bridges
Construction of bridges at km 0+750 and Km 11+235 have been completed and
opened to traffic
All the spans of bridge at km 39+709 have been cast. Crash barrier also completed.
Piling of Kallissey bridge completed @ 1+558. A1 and A2 abutment and bracket wall
completed. A1P1 1st & 2nd Girder casting and stressing completed. 3rd girder has
been cast. P1P2 1st & IInd Girders casting & stressing completed. 3rd girder casting is in
progress.
Excavation & PCC Completed at RHS side widening Bridge Ch. 2+500
Piling of Varattar bridge completed @ 4+008. A1-P1, P1-P2 & P2-A2 deck slab
Completed.
37 nos. of piles out of 37 nos completed of Thondara bridge 5+213. A2 abutment wall
completed. P4 Pier cap completed
RHS Side slab and crash barrier completed at widening bridge 24+965
GSB 27060 m (LHS) & 26710 m (RHS) completed
WMM 26330 m (LHS) & 26520 m (RHS) completed.
Drain cast – 32578 m
Drain placed – 31565 m
Slabcast – 13004 m
7462 m RR masonry retaining wall & 482 m Sound barrier completed
19.3.1.2 Retaining Walls Retaining wall completed in the following locations
10+960 to 10+970 (RHS), 11+070 to 11+125 (LHS), 12+650 to 12+660 (LHS),12+728 to
12+735 (LHS) , 12+780 to 12+810 (LHS),12+950 to 12+983 (LHS), 13+010 to 13+060
(RHS),13+950 to 13+990 (LHS),13+020 to 13+960 (RHS,14+260 to 14+270 (LHS),14+000 to
Monthly Progress Brief – August 2016 Page 46
14+010 (RHS), 14+170 to 14+180 (LHS), 14+340 to 14+430 (LHS), 14+460 to 14+4740 (LHS),
14+470 to 14+490 (LHS), 14+510 to 14+570 ( LHS), 2+400 (LHS), 3+930 to 3+950 (LHS),
30+975 to 31+000 (LHS), 36+800 to 36+810 (LHS), 12+780 to 12+800 (RHS), 13+010 to
13+040 (RHS), 13+060 to 13+090 ( RHS) 13+515 to 13+585 (RHS), 13+740 to 13+770 (RHS),
14+010 to 14+030 (RHS), 14+470 to 14+430 (RHS), 24+945 (RHS), 24+960 (RHS), 44+830 to
44+850 (RHS), 44+900 to 45+000 ( RHS), 36+700, Ramp – 2+410 (LHS)
Box Culvert – 1 no. of box culvert half side completed & other culverts are work in progress 11+773 (RHS)
Progress up to August 2016 is as follows
For previous month This Month month Cumulative to end of this month
Target Achieved Target Achieved Target Achieved
51.64% 38.24% 3.12% 2.59% 54.76% 40.83%
Work progress is summarized in the S-curve in Annex 6.4, which compares programmed and actual progress.
A summary of progress for major items is as follows:
Milestone I
(Km 19+400 to 30+000 )
II (Km 30+000 to
47+700)
III (Km. 0+000 to Km. 19+400,
Excluding Thiruvalla bypass)
Length in km 10.600 17.700 17.500
Length handed over to contractor in km 10.600 17.700 17.500
Unencumbered land available to the contractor in km
10.600 17.700 17.500
LHS RHS LHS LHS RHS LHS
GSB completed in km 10.490 10.520 11.840 11.880 4.730 4.960
WMM completed in km 10.300 10.300 11.660 11.610 4.370 4.610
DBM completed in km 10.300 10.300 11.290 11.160 3.910 4.040
BC completed in km 9.530 8.910 0.800 0.500 1.560 1.830
Monthly Progress Brief – August 2016 Page 47
19.4 Physical Progress
19.5 S-Curve
26268
1445
7521
21797
20931
7402
3262
3134
6221
70960
57228
14146
14000
17802
3594
3000
10406
26500
375826
67504
71921
96000
122071
30000
21000
37055
60500
0 50000 100000 150000 200000 250000 300000 350000 400000
Excavation
Embankment
Subgrade
GSB
WMM
DBM
BC
Concrete total
Precast Drains
BOQ Quantity
Cumulative target to end of this month
Cumulative Achieved to end of this month
Monthly Progress Brief – August 2016 Page 48
19.6 Schedule of culverts and drainage works
19.7 Payments The contractor has been paid Rs. 105.58 crores
19.8 Implementation of EMP
19.8.1.1 Environment Management at Project Ancillary Facilities The scarified materials and concrete waste materials are using for developing the HM
and Batching plant site. Contractor was also directed to improve the Road safety during
construction along the road .Wearing of PPE by the workers at bridge site is also insisted to
avoid any accident.
Considering the restricted space constrains, additional safety measures are taken and
the movement of trucks inside the HM plant site is to be regulated properly.
The construction safety provisions are not sufficient as the above project road is having
high traffic. Contractor has to provide additional boards, reflectors barricades delineator
posts and flagmen for traffic control. The safety at bridge sites are also to be increased.
Contractor has provided life jackets for workers working in platform for piling as the water
depth is more. The absence of environmental engineer is also contributed for the poor
performance on implementing safety requirements. Contractor was directed to improve
safety at all bridges site urgently. Contractor was not submitted the action taken report
on the site visit observation of the environmental expert hence notice was also issued in
this regard. Post of the environmental engineer is vacant and no substitute posted so far.
Nature of work
Tota
l num
ber
No.
dw
gs a
ppro
ved
Num
ber c
ompl
eted
Num
ber i
n pr
ogre
ss
Num
ber r
emai
ning
Culverts
Pipe culvert 1 1 1
New Box Culvert 101 70 55 46
Total culverts 102 71 56 46
Major Bridge 2 2 2
Minor Bridge 4 4 3 1
Widening Bridge 3 1 1 2
Monthly Progress Brief – August 2016 Page 49
19.9 Photographs
Slab concrete work in progress Slab concrete work in progress Retaining wall completed
@ Ch. 13+050 (RHS) at Minor Bridge Ch. 04+008
Retaining wall completed @ Ch. 13+050 (RHS)
BT dismantling completed @ Ch. 03+050 (LHS)
20.1 C U
20.2 C Letter ofAccepta
Agreem
Name of
Contrac
Notice toComme
Total Len
Contrac
Complet
Defect LPeriod
1st Milest
2nd Miles
3rd Milest
Contract Upgradation o
Contract d
ance Date
ent Date
f Contracto
ct Price
o nce
ngth
ct Period
tion Date
Liability
one
tone
tone
Packageof Road from
details:
::
29.1
:: 30.1
or :: M/s
:: Rs.
:: 04.0
:: 40.6
:: 30 m
:: 03.0
:: 365
:: 10 k
:: 30 k
:: 40.9
e V Ettumannoor
11.2013
12.2013
s NAPC Ltd.
171.49
02.2014
60 km
months
08.2016
days
km – BC lev
km – 05.10.2
960 km who
to Muvattupu
.,
vel 01.05.20
2016
ole works by
Scope o Constru
Constru
New Bo
Widenin
Reconst
Foot pa
uzha of SH 1
16
y 23.03.2017
of Works (40
uction of Ma
uction of Mi
ox culverts
ng Slab culv
truction of
ath, Solar Lig
7
0.96 Km):
ajor Bridges
nor Bridge
verts
Culverts
ghts
s –
–
-
–
-
0
4
3
14
75
Monthly Progress Brief – August 2016 Page 51
20.3 Work Progress
20.3.0.1 Progress Achieved - Structures Progress achieved
• Minor Bridge at km.3+877 – Works for widening the minor bridge on LHS is in progress. This minor bridge is in MS-I.
• Minor Bridge at km. 12+524.5 – Deck slab and crash barrier completed. This minor bridge is in MS-II.
• Minor Bridge at km. 22+187 – Reconstruction of bridge completed. This structure is in MS-II.
• Minor Bridge at km. 24+506 – Widening works on both sides are not yet started This minor bridge is in MS-II.
• Minor Bridge at km. 28+362 – Reconstruction of bridge is changed to widening which is not yet started. This structure is in MS-II. The widening proposal is changed to reconstruction based on public demand and location of structure.
• MS 1: Out of 27 nos. Box Culverts 27 nos. substantially completed. All slab culverts (5nos) completed. Protection works like apron, catch pit, quadrant pitching etc of all completed culverts remain incomplete in MS-I
• In MS II out of 36 nos. Box Culverts 30 nos. (protection work balance) substantially completed, 6 nos. Box Culverts are in progress. Four pipe culverts completed and one in progress.
A summary of progress for major items is as follows:
Milestone I
Km. 0+000 to Km. 10+000
II
Km. 10+000 to Km. 30+000
III Km. 30+000 to Km.
40+960
Length in km 10 20 10.960
Length handed over to contractor in km 10 20 10.960
Unencumbered land available to the contractor in km
10 20 10.960
Stretch completed in all respects in km 0 0 0
FW HW FW HW FW HW
GSB completed in km 9.650 0.300 5.275 1.900 0.000 0.000
WMM completed in km 9.620 0.300 4.770 1.290 0.000 0.000
DBM completed in km 9.620 0.040 4.710 1.210 0.000 0.000
BC completed in km 9.320 0.010 0.000 0.000 0.000 0.000
CD completed in Nos. 27/27 30/36
Monthly Progress Brief – August 2016 Page 52
Up to previous month This month Cumulative up to end of
this month Target Achieved Target Achieved Target Achieved
58.09% 32.51% 2.80% 1.66% 60.89% 34.17%
20.4 Bar chart
20.5 S-Curve
208137
24394
21470
50850
48933
13382
4113
6551
452702
92200
81415
155981
160823
44186
10652
13277
483045
135501
64000
68921
134110
35840
19095
26691
0 50000 100000 150000 200000 250000 300000 350000 400000 450000 500000 550000
Excavation (cum)
Embankment (cum)
Subgrade (cum)
GSB (cum)
WMM (cum)
DBM (cum)
BC (cum)
Concreting (cum)
BOQ Quantity
Cumulative Target to end of this Month
Cumulative Achieved to end of this Month
Monthly Progress Brief – August 2016 Page 53
20.6 Strip Map
0 100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
Miscellaneous WorksBridges Nos Culverts Nos Drains and WallsBituminous ConcreteDense Bituminous MacadamWet Mix Macadam-IIWet Mix Macadam-IGranular Sub baseSubgradeEW - EmbankmentPothole repair & patching
Pothole repair & patchingEW - EmbankmentSubgradeGranular Sub baseWet Mix Macadam-IWet Mix Macadam-IIDense Bituminous MacadamBituminous ConcreteDrains and WallsCulverts Nos Bridges NosMiscellaneous Works
On going Work
(No./Km)
RIG
HT
SID
EL
EFT
SID
E
Chainage (Km)
Culverts & Bridges Cum. Completed Work
(No/Km)
5400
5500
5600
5700
5800
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
9900
1000
010
100
1020
010
300
1040
010
500
1060
010
700
Miscellaneous WorksBridges Nos Culverts Nos Drains and WallsBituminous ConcreteDense Bituminous MacadamWet Mix Macadam-IIWet Mix Macadam-IGranular Sub baseSubgradeEW - EmbankmentPothole repair & patching
Pothole repair & patchingEW - EmbankmentSubgradeGranular Sub baseWet Mix Macadam-IWet Mix Macadam-IIDense Bituminous MacadamBituminous ConcreteDrains and WallsCulverts Nos Bridges NosMiscellaneous Works
LE
FT S
IDE
RIG
HT
SID
E
Culverts & Bridges Cum. Completed Work
(No/Km)
On going Work
(No./Km)Chainage (Km)
1080
010
900
1100
011
100
1120
011
300
1140
011
500
1160
011
700
1180
011
900
1200
012
100
1220
012
300
1240
012
500
1260
012
700
1280
012
900
1300
013
100
1320
013
300
1340
013
500
1360
013
700
1380
013
900
1400
014
100
1420
014
300
1440
014
500
1460
014
700
1480
014
900
1500
015
100
1520
015
300
1540
015
500
1560
015
700
1580
015
900
1600
016
100
Miscellaneous WorksBridges Nos Culverts Nos Drains and WallsBituminous ConcreteDense Bituminous MacadamWet Mix Macadam-IIWet Mix Macadam-IGranular Sub baseSubgradeEW - EmbankmentPothole repair & patching
Pothole repair & patchingEW - EmbankmentSubgradeGranular Sub baseWet Mix Macadam-IWet Mix Macadam-IIDense Bituminous MacadamBituminous ConcreteDrains and WallsCulverts Nos Bridges NosMiscellaneous Works
LEFT
SID
ER
IGH
T SI
DE
Culverts & Bridges Cum. Completed Work
(No/Km)
On going Work
(No./Km)Chainage (Km)
Monthly Progress Brief – August 2016 Page 54
20.7 Schedule of culverts and drainage works
20.8 Utilities
Relocation of electrical utilities and water supply line using materials issued by KSTP is the
responsibility of Contractor. Removal of stumps of trees cut by agencies engaged by KSTP
is also the responsibility of Contractor. KSTP/PMT has made arrangements with BSNL and
other private agencies for relocation of cables, telephone posts and telephone pillars.
KSTP has issued most of the items required for relocation of Electric and Water utilities and
relocation work is under progress.
20.9 Key issues: The following issues are very critical which may have adverse impact on the timely
completion of the Project.
• Insufficient teams, staging and shuttering materials are affecting protection works and CD works.
• Delay in mobilization of adequate labour and machineries to make up backlogs.
• Lack of resources at site which reflected in planning of works at site.
• The poor cash flow of Contractor has seriously hampered the progress of works.
20.10 Payment to the contractor The contractor has been paid Rs. 53.96 crores
Nature of work
Ori
gina
l num
ber
No.
dw
gs a
ppro
ved
Num
ber
com
plet
ed
Ori
gina
l num
ber
No.
dw
gs a
ppro
ved
Num
ber
com
plet
ed
Num
ber
in p
rogr
ess
Num
ber
rem
aini
ng
Ori
gina
l num
ber
No.
dw
gs a
ppro
ved
Num
ber
com
plet
ed
Num
ber
in p
rogr
ess
Num
ber
rem
aini
ng
Culverts
Widening Slab Culverts 5 5 5 7 3 2 2 3 6 6
Slab Culvert retained 2 2 2 2 2 2
Reconstruction Slab/Box 24 24 24 0 33 33 27 4 2 11 11
New Box Culvert 3 3 3 0 3 3 3 0 3 3
New Pipe Culvert 0 5 4 4 1 0 5 5
Total culverts 34 32 34 0 0 50 43 36 7 7 27 0 0 0 27
Bridges Retained 0 1 1 1 1
Widening Bridges 1 1 3 3 1 2 0 0
Reconstruction Bridges 0 1 1 0 0 0
Total Bridges 1 0 0 1 0 5 3 2 0 3 1 0 0 0 1
Num
ber
in p
rogr
ess
Num
ber
rem
aini
ng
Milestone - I Milestone - II Milestone - III
Monthly Progress Brief – August 2016 Page 55
20.11 Implementation of EMP
20.11.0.1 Environment Management at Project Ancillary Facilities Contractor has obtained consent to operate for all the plants except crusher. . The
remaining works of parking area , bus bays, noise receptors are to be taken along with
the pavement works The disposal of excavated earth is an issue, as large quantities of cut
earth is available .Disposal site has to be provided to the contractor by the employer
Contractor has identified two private temporary disposal site. The major activities are
spread in the milestone 2.Lot of places high cutting are done. Additional safety boards
are required at these locations. The labor accommodation for new labors is to be
provided with ventilation. Cooking inside of living rooms is to be immediately taken
outside of the accommodation to the kitchen location. Contractor was also directed to
establish a biogas plant at labor camp for treating waste. Contractor has to install all
signage and marking in the completed road sections. Lot of protection works are to be
taken up in the sections @CH 30 to 40km. Location of the retaining wall and gabion wall
was identified and contractor has to start these works urgently to achieve the planned
target dates. Notice was issued to the contractor for not submitting the action taken
report on the site visit observation of the environmental expert.
20.11.0.2 Traffic Management and Road Safety Measures Traffic safety management at site has to be improved in locations where high cutting.
Considering the upcoming monsoon season direction was also issued to the contractor to
keep the construction zone lit during night with reflectors and flash lights., further in the
realignments where rock blasting is anticipated, safety provisions is to be increased.
Fencing the boundary was done but sign boards are missing.
Monthly Progress Brief – August 2016 Page 56
20.12 Photographs
DBM at 19+450 RHS DBM at 14+500
Bridge at 22+079 A2 Approach Slab Bridge at 22+079 A2 Approach Slab
Monthly Progress Brief – August 2016 Page 57
21.1 Contract Package VI Upgradation of Road from Ponkunnam to Thodupuzha Scope of work (46.363 km)
Minor Bridge reconstruction - 1 no.
Culvert:
Reconstruction - 109 nos.
Widening - 44nos.
New Construction - 7 nos.
Drain - 65 km
Foot Path -
Solar Street Light -
21.2 Contract details:
Letter of Acceptance
date
:: 04.02.2014
Agreement date :: 05.05.2014
Name of Contractor :: M/s GHV-EKK (JV)
Contract price :: Rs. 227,13,73,548
Notice to Commence :: 10.06.2014
Total Length :: 46.363 km
Contract Period :: 30 months
Completion date :: 09.12.2016
Defect Liability Period :: 365 days
1st Milestone :: 10 km
2nd Milestone :: 25 km
3rd Milestone :: Completion of full stretch & Thodupuzha Bypass
Monthly Progress Brief – August 2016 Page 58
21.3 Physical Progress: Summary of progress for major items is as follows:
Milestone I (85+000 to 95+000)
II (84+000 to 85+000)
Bypass 2.57 km (106+000 to 117+430)*
III (95+000 to 106+000)* (117+430 to 131+015)
Length in km 10.000 15.000 24.585
Side LHS RHS LHS RHS LHS RHS
GSB completed in km 10.00 10.00 15.00 15.00 18.33 20.66
WMM completed in km 10.00 10.00 15.00 15.00 17.35 18.61
DBM completed in km 10.00 10.00 15.00 15.00 15.02 15.89
SMA completed in km NIL NIL 5.94 5.94 0.38 0.38
BC completed in km 10.00 10.00 8.36 8.36 10.14 9.56 CD works completed in No.’s 20/20 43/43 79/79
Work progress considering the contract price:
Up to previous month This month Cumulative (till end of this month)
Target Achieved Target Achieved Target Achieved
87.06% 99.03% 3.55% 2.27% 90.61% 101.05%
21.4 Work Progress
21.4.0.1 Utility Shifting:
1590 Electrical Poles has been shifted up to the month.
17 km KWA Water pipe line has been shifted from the location.
9.0 km Panchayat Water line has been shifted up to the month.
Tree cutting has been completed in Milestone-I & II and work is in progress in
Milestone III.
49 No’s. Transformers have been shifted till date.
Monthly Progress Brief – August 2016 Page 59
21.4.0.2 Quality Control
21.4.0.2.1 Report of Approval of Materials:
21.4.0.3 Material Test Results:
Work Status in Quality Control:
During the month total 572 Field Dry Density tests have been conducted for Earthwork
(EMB & SG) among them 522 tests has passed. Total 391 Field Dry Density tests have been
conducted for Granular Sub-base among them 376 tests has passed. Total 106 Field Dry
Density tests have been conducted for Wet Mix Macadam all of them have passed.
Item No. of Sources Located Submitted Approved RCC Hume Pipes 2 2 1 Cement 3 3 3 Steel 3 3 3 Admixture 3 3 3 Geotextile 1 1 1 Gabion 2 2 2 Elastomeric Bearing 1 1 1 Fine and Coarse aggregate (Cochin blue metals) 1 1 1
Strip Seal expansion joint 1 1 1 Stone Matrix 2 2 1 Bitumen 1 1 1 Emulsion 1 1 1 Fine & Coarse WMM Mana Crusher 1 1 1
Corrugated Pipe of 300mm dia 1 1 1 Road marking compound 1 1 1 Signalization, LED blinkers & LED standalone solar light 2 2 1
4 wire rope safety fencing 1 1 1 Flooring Tiles for bus shelter 1 1 1 Road Stud (White) 1 1 1 Interlock Tiles 1 1 1 Solar LED Blinkers 1 1 1
Monthly Progress Brief – August 2016 Page 60
21.5 Bar Chart of Physical Progress:
21.6 S-Curve
371255
78912
94327
68770
133231
117241
58857
26764
2496
10582
19118
37699
2144
2665
0
0
397929
0
41194
215400
117000
132800
255685
28616
5000
12000
24922
42045
5092
3050
102
29
397929
25000
41194
222161
124075
145542
255685
28616
8000
14874
26862
42045
5092
3050
102
29
Excavation (cum)
Excavation (cum) in hardrock
Embankment (cum)
Subgrade (cum)
GSB (cum)
WMM (cum)
Loosening and recompacting
DBM (cum)
SMA (cum)
BC (cum)
Concreting M‐15 (cum)
Concreting M‐20 (cum)
Concreting M‐25 (cum)
Concreting M‐30 (cum)
Concreting M‐35 (cum)
Concreting M‐40 (cum)
BOQ Quantity Cumulative target to end of this month Cumulative Achieved to end of this month
Monthly Progress Brief – August 2016 Page 61
21.7 Schedule of Cross Drainage Works
21.8 Implementation of EMP
21.8.0.1 General Consultant’s supervision initiatives for compliance of environment management plan and
to strengthen mitigation efforts at construction site were in progress in various areas during
month August, 2016. Planning, monitoring and supervision for environment mitigation work
was been done for compliance of EMP along with up-gradation of road from Ponkunnam
(KM 84+000) to Thodupuzha (130+000) and Thodupuzha bypass of SH-08.
During the work progress the statutory compliance under environment regulations, Air
(Prevention &control pollution) act 1981, Water (Prevention & control of pollution) Act
1974, and Waste (Management and Handling) Act 1989 was emphasized. The traffic
management and safety has been practiced throughout. PAP’s issues are addressed;
grievance has been rectified by implementing the suggested action plans by KSTP.
Monthly Progress Brief – August 2016 Page 62
21.8.0.2 EMP Monthly Progress Report A. Project Details Period of Reporting :August 2016
1. Name of project stretch and link no. Up-gradation of the Road from Ponkunnam (84+900) to Thodupuzha (131+016) and Thodupuzha Bypass of SH-08
2 Name and address of the Contractor M/s. GHV-EKK (JV), Perumbavoor
3 Contract date and duration 5th May, 2014, 30 Months (Commencement notice date 10th June 2014)
4 Status of completion of the project 9thDecember 2016 B. Physical Progress Report S. No. Enhancement/ Mitigation
Measures Physical target / (Achieved) (No’s.)
Units carried over from previous month
Units started in reporting month
Units completed in reporting month
Units carried over to next month
(a) (b) (c) (d) 1. Noise Barrier 19/ (7) 1 0 0 1 2. Hand pumps 6/(6) 0 1 1 0 3. Bus Shelter 35 1 0 0 1 4. Sign Boards 997/(726) 0 0 0 0
5.
Preserving and landscaping the cultural properties like shrines and Hyundai
7/(2) 0 0 0 0
6. Constructing new well 3/(1) 0 0 0 0 7. Providing new water taps 33 0 0 0 0
8. Parking space for auto rickshaws, cars and jeep
Quantity not estimated
9. Landscaping of type C oxbow lands 28 1 0 0 1
10. Planting trees along road side 864/(360) 0 80 80 0
11. Planting trees on inner side of sound insulating wall
440/(83) 0 0 0 0
12. Providing 1.2 m high fencing under via duct
Quantity not estimated
0 0 0 0
13. Concrete flooring with slope drains and oil interceptors
3/(1) 0 0 0 0
14 Water Sprinkling Not Estimated/ (825 hrs)
0 0 0 0
15 Air Quality Monitoring 36/(29) 0 0 0 0 16 Water Quality Monitoring 30/ (24) 0 0 0 0
Monthly Progress Brief – August 2016 Page 63
C. Details of Sites for Project Ancillary Facilities S. No. Type of Camp/Site Cumulative No
of sites opened
No of sites operational
Cumulative No of sites redeveloped
Cumulative No of sites Closed*
1. Construction Camp 2 2 0 0 2. Labour Camp 2 2 0 0 3. Quarry & Stone
crusher unit 1 1 0 0
4. Borrow Area 0 0 0 0 5. Debris Disposal Site 0 0 0 0 6. Water Sources 3 3 0 0 * A site will be considered closed after redeveloping and obtaining closure certificate from CSC. D Reporting/Monitoring Formats to be annexed with this monthly report by the CSC S. No. Reporting/Monitoring Format Yes/No 1 Reporting Format for Enhancement and Mitigation of Common Property
Resources Yes
2 Reporting Format for Work Force Management Yes 3 Reporting Format for Occupational Health and Safety Measures Yes 4 Reporting Format for Road Safety Measures during Construction Yes
21.8.0.3 Environment, Health and Safety Road markings was restarted in the month and done at certain location of Section 1 and
2.
Guard post installation has been done along culverts.
Avenue plantation under environmental enhancement plan was in progress during the
month.
Cultural properties have been protected; access way, slope protection wall, stair way
reconstruction has been done in this month.
Grass cutting around camp has been done to prevent water stagnation and insect
proliferation. Mosquito menace has been prevented by spreading fogger (smoke) in the
camps.
Safety lapses were observed due to lack of manpower, same has been instructed to the
contractor.
During the month work progress and pace was very slow because of rain, the month was
declared as monsoon vacation for the employees/laborers by Contractor. Fewer work
forces were deployed.
21.9 Payment to contractor
Payment up to May 2015 is Rs. 206.61 crore
Monthly Progress Brief – August 2016 Page 64
21.10 Photographs
Road line demarcated in section 1
Guard post Installation along the culverts has been
done
Laying of DBM at Ch. 125+640 to 126+240 RHS
FDD test conducted for GSB at Ch. 128+350 RHS
Monthly Progress Brief – August 2016 Page 65
22.1 Contract Package VIII Upgradation of Road from Punalur to Ponkunnam Work has to be arranged under PPP mode (Modified Annuity). DPR submitted by
M/s CDM Smith Associates is under review. The Transaction Advisory has been selected
and assignment commenced. The Transaction Advisory is M/s L&T Ramboll in JV with M/s
Fortress. The review of DPR and RFQ, RFP and Financial modal are completed. Bidding
documents were placed before the Steering Committee and endorsed. The Government
had expressed willingness to include the project in the Infrastructure fund being mobilized.
Government have further informed that a “line item” in the State Budget will also be
included. The pre-qualification bids were published and the pre-bid meeting is over. The
bids were submitted on 02.06.2016 and evaluated and being placed to the Steering
Committee for decision.
23.1 Contract Package VII Upgradation of Road from Perumbilavu – Pattambi - Perintalmanna
Horizontal alignment finalized and boundary stone planted for land acquisition. The
original proposal was to upgrade the project under EPC mode. But due to the delay
anticipated in acquiring the land invoking the provision of the new LA Act for which rules
are being finalized by the Government, it has been decided to provide a modest level of
improvement to the surface. It is also proposed to make use of the savings due to the
change in the improvement proposals for providing overlay to the KSTP-I roads.
Accordingly proposals have been submitted to the Government and to the Bank after
obtaining approval of the Steering Committee on 28th July 2014. The work has been
awarded and agreement executed. The work commenced.
24.1 Proactive actions taken by employer:
1. The threshold limit of minimum IPC has been lowered to Rs. 1.50 crores from
Rs. 3.00 crores to facilitate cash flow of the contractors.
2. Extension of time limit for completion of Milestone-I has been granted for Package
I, II and V to compensate the delay caused due to reasons beyond the control of
the contractors. The contractor for Package III could not speed up the work and
hence terminated for non performance and re-arranged as 3A and 3B
Monthly Progress Brief – August 2016 Page 66
25.1 Road Safety Component – Current Status
Road Safety Capacity Building and Program Management Project
The focus of Road Safety Program Comprises of the following tasks:
To strengthen the capacity of Kerala Road Safety Authority to introduce Sustainable
International Best Practice in designing, implementing and Evaluation of Road Safety.
Development of Safe Corridor Demonstration Project (SCDP) by implementing the Multi-
sectoral interventions to demonstrate the effectiveness of Road Safety Best Practices.
The Kazhakkoottam – Thaikod – Kottarakara – Adoor Corridor (80 km) improved during
KSTP-I is identified for this purpose having high density of traffic
To replicate the lessons learned from the Safe Corridor Demonstration Project to develop
another 10 safe corridors across the State through local partnerships using the challenge
fund and the matching fund from the KRSA
Road Safety Capacity Building of the institutions responsible for managing Road Safety in
the State.
The KSTP appointed M/s VicRoads, Australia, an internationally experienced consultant to
support in implementing the above programs. The consultant has conducted
stakeholders meetings and trained the Engineers and others in designing various Road
Safety interventions in the SCDP. The tender is being evaluated for placing before the
Steering Committee.
The proposal for strengthening the Kerala Road Safety Authority has been accepted by
the Executive Committee and the actions for procuring specialists, to various positions are
in progress.
Traffic counters were procured and installed at five locations, one in NH and four in
location in the project roads. These counters shall be utilized for planning of future road
geometrics requirements, capacity analysis, seasonal variations, daily variations of traffic
volume during festivals etc.,
Monthly Progress Brief – August 2016 Page 67
The KSTP has entrusted the consultant to take actions for the procurement of Market
Research firms. The market research would support Development of the publicity and
education programs, including future campaigns.
Establish benchmarks on knowledge, attitudes, perception of road safety issues and self-
reported behaviors of road users for monitoring the impact of future road safety activities
and effectively support the task of the Road Safety Capacity Building and Program
Management Consultant
Proposals were invited for eight tasks based on separate ToRs from experienced five firms
and evaluation done to select suitable firms for assigning the tasks. The survey for Road
User Behavior and helmet and seat belt nearing completed. The overtaking studies
completed.
26.1 Institutional Strengthening Components – Current Status The key element in the Institutional Strengthening Component in the KSTP II is Road Sector
Modernization, which is designed to support strengthening of the institutional and
financial capabilities of Kerala PWD and related activities to effectively develop and
maintain the physical assets. The key action in this direction is to classify the Core Roads
Network which are strategically important, with options to finance and manage the same
effectively.
In order to achieve this objective of the Strategic Road Network (SRN) Program (SRNP) the
following actions are envisaged.
Identification of the SRN with options for Asset Management Process necessary for management and maintenance of physical assets in most efficient and sustainable manner. To evolve the financing and budgetary process that have an impact on management of the SRN, and also seek opportunities for enhanced finding resources. To determine the extent to which the PWD has Road Asset Management Capacity and to determine appropriate organizational context to ensure effective management of the SRN.
The GoK appointed the former Chief Secretary of the State
Shri. Babu Jacob as ‘Client Executive Program Sponsor’ to guide in implementing the
program. The bidding process to select Internationally Experienced Consultants to
support the Client Executive Program Sponsor is now underway. The Technical proposals
received are under evaluation and is due to poor response, it was decided by the
committee to invite re-bid for the assignments. Banks comments are sought.
Monthly Progress Brief – August 2016 Page 68
A Review Group comprising senior Secretaries of Ministries Finance, Works, Planning and
Industry will be set up under the Chairmanship of the Client Executive Program Sponsor.
The developing of an Integrated Information Management System (IIMS) for PWD. It has
been decided to engage NIC for this assignment. However as they were not interested,
the ToR was limited the activities for improving the existing system in the PI Cell.
Improvement in Community Participatory Road Safety and Asset Safeguard Program.
This assignment could not be awarded due to settlement of a case in the Hon’ble High
Court of Kerala. The Hon’ble High Court has delivered the Judgment by upholding the
decision of the Steering Committee to rebid. The Bank had already expressed no
objection for re-bid. The Steering Committee also decided to invite re-bid. The KSTP has
conducted User Perception Surveys to verify the adequacy of the design and program of
implementation at the start of the project through an experienced agency. The Road
User Satisfaction survey at mid term is being arranged. The ToR has been prepared and
forwarded to Bank for review.
27.1 Payment to the consultants as on end August 2016: M/s Egis India JV - Rs. 222271283
M/s MSV International - Rs. 35927487
28.1 Restructuring of KSTP II A consolidated proposal for Re-structuring of KSTP II has been submitted to State
Government after detailed discussion with the Bank. Since savings in Bank Finance is
expected mainly due to difference in the Foreign Exchange Rate, there is need to
enhance the Bank Assistance to the Project from the present 56% to 63%, to cover up the
loan amount of US$ 216 million. The exchange rate considered in the Restructuring
proposal is INR 67 to US$ against INR 54 to US$ considered at the loan approval stage.
29.1 Meetings, Site visits & Inspection Package-I
Environmental Engineer inspected the Project site on 14th July 2016
Progress review meeting conducted by Additional Chief Secretary, PWD on 02nd
July 2016 at PMT, Thiruvananthapuram
Monthly Progress Brief – August 2016 Page 69
Package-II
Progress review meeting conducted on 02nd July 2016 at PMT,
Thiruvananthapuram.
A meeting was convened by Hon’ble Minister for PWD on 12th July 2016 at
Thiruvananthapuram.
Package-IV
Progress review meeting was held on 02/07/2016 and 25/07/2016 at KSTP,
Thiruvananthapuram.
Package-IVA
The PWD secretary accompanied by Project Director and Team Leader have
visited the Project on 24/07/2016
Progress review meeting was held on 02/07/2016 and 25/07/2016 at KSTP,
Thiruvananthapuram.
Package-V
The Project Director convened a meeting at PMT on 2nd July 2016 and in
continuation the Secretary PWD convened another meeting at Secretary’s
chamber. It was decided to prepare realistic programme to complete the work
within the extended period.
30.1 Land Acquisition Status
SI. No
Name of road & Length (km)
Land proposed
for Acquisition
(Ha)
Land Acquired (Ha)
Land Pending
Acquisition (Hectare)
Present position/ Reasons for
delay
1 Kasargode – Kanhangad (24.00) 2.9177 2.9177 0 NA
2 Pilathara – Pappinssery (21.00) 7.3057 7.3057 0 NA
3 Thalasery – Valuvapara (53.78) 25.0312 24.9367 0.0945 (0.38%) LA in progress
4 Chengannur – Ettumanoor (47.00) 11.1815 11.1815 0 NA
5 Ettumanoor – Muvattupuzha (40.90) 15.6197 14.3591 1.2606
(8.07%)
DLPC is yet to negotiate for
direct purchase and new GO
awaited.
4A Thiruvalla Bypass (1.2) 5.5105 5.0404 0.4701 (8.53%)
Direct purchase, stalled due to
non-availability of funds
6 Ponkunnam – Thodupuzha (50.10) 26.7401 26.7049 0.0352
(0.13%)
LA & DP in progress – Lack
of funds
Monthly Progress Brief – August 2016 Page 70
7 Punalur – Ponkunnam (82.12) 26.6518 26.1388 0.5130 (1.92%)
LA & DP in progress – Lack
of funds
8 Perimpilavu – Perintalmanna (41.00) 9.7013 0 9.7013
(100%)
Requisition given , LA not
yet started
32.1 Status on Critical Actions identified by World Bank Component A – Road Network Upgrading and Safety Improvement: 1. Improve site management, construction planning
and resource utilization to achieve consistent monthly progress of 5% for Contract 5
The contractor has been given time for completion up to 31.03.2017, subject to the condition to achieve 5% progress every month, failing which contract will be terminated.
2. Achieve a consistent monthly progress of 8% for
Contract 1 & 2 The contractor has been given time for completion up to 31.03.2017, subject to the condition to achieve 8% progress every month, failing which contract will be terminated.
3. Initiate construction in Tavam RoB in Contract-2 Design finalized 4. Finalize detailed design and estimation for the
Package 4A viaduct and submit to Bank Bank issued the No Objection Certificate for variation and this will be placed before the next Steering Committee.
5. Hire a group of Independent Quality Assurance
Specialists Proposal with ToR has been prepared for placing before the next Steering Committee
6. Finalize ToR for Independent Engineer for PPP
Concession ToR prepared and will be sent to Bank, subject to finalization of pre-qualification of bidders. The pre-qualification bids were re-invited
7. Complete evaluation for RFQ and Issue RFP for PPP
concession
The pre-qualification bids were re-invited. Fixing last date of receipt of RFQ on 24.10.2016
Component B – Road Safety Management: 8. Award contract for the Road Safety Demonstration
Corridor Civil Works LoA issued on 26.09.2016
9. Resume and complete the process of specialized
staff recruitment in KRSA Proposal sent to Secretary to Government PWD for discussion with the Transport Commissioner and the proposal accepted and selection in process is initiated.
10. Initiate identification of challenge fund projects in
the project influence area Actions to identify roads under progress
11. Engage Local Road Safety Advisor
Actions being taken
Monthly Progress Brief – August 2016 Page 71
Component C – Institutional Strengthening: 12. Institute Strategic Review group This is being formed 13. Evaluation of WPs and contract award Evaluation completed and due to
poor response to the bids, the Steering Committee has decided to rebid.
14. Award of IIMS ToR revised for rebidding limiting the
scope. 15. Technical advisor Actions taken and will be finalized
soon Financial Management
16. Submit claims Submitted 17. Submit IFR for period ended 15th June 2016 Submitted 18. Submit internal audit report for second half of FY 15-
16 Audit over and report forwarded to World Bank
19. Carry out physical verification of assets In progress 20. Appoint internal auditors for FY 16-17 Technical Proposal evaluation
completed. 21. Submit approved accounts of FY 15-16 to CAG Action will be taken on receiving
minutes of Steering Committee 22. Submit external audit report for FY 15-16 Will be submitted on time 23. Monitor receipt of counterpart funding Being taken up with State Government
for timely allotment General Project Administration Issues 24. Appoint dedicated Project Director Appointed
25. Submission of Project restructuring proposal to
Government of India Proposal submitted to State Government for approval and forwarding to DEA (Government of India)