BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

21
BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill Building area = 495 sqm

Transcript of BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Page 1: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

BEVERIDGE STREET OFFICE

134 Beveridge Street, Swan Hill

Building area = 495 sqm

Page 2: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Swan Hill Region

2 McCrae Street, Swan HillN

Ground Floor

FE

FIRE BLANKET

EXIT

First Floor

Information Centre & EDU

gcutajar
Typewritten Text
gcutajar
Typewritten Text
Building Area Ground = 485 sqm Upstairs = 250 sqm
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
Page 3: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Lake Boga Community Centre

29 Lalbert Road, Lake Boga

N

Area marked in pink is Maternal Child & Health

Section 1 Blue

Section 2 Yellow

Section 3 Green

Section 4 Orange

Building Area = 1355.79 sqm

Page 4: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Area marked in pink to be cleaned

N29 Lalbert Road, Lake Boga

Lake Boga Maternal & Child Health (Lake Boga Community Centre)

Page 5: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Manangatang Community Centre

1 Wattle St, Manangatang

N

FIRE BLANKET

Areas marked in pink are not to be cleaned

Page 6: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Nyah Community CentreRiver Street, Nyah

N

STAIRS

STAIRS

STAIRS

STAIRS

STAIRS

STAIRSSTAIRSSTAIRSSTAIRSSTAIRSSTAIRSSTAIRSSTAIRSSTAIRSSTAIRS

Page 7: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Nyah West Maternal Child & Health

51B Monash Avenue, Nyah WestN

TO MONASH AVENUE

Page 8: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill
admin
Section 1 Purple 321 sqm Section 2 Yellow 96 sqm Section 3 Blue 803 sqm Section 4 Orange 257 sqm Section 5 Brown 406 sqm Red Not to be Cleaned
admin
3
admin
1
admin
2
admin
4
admin
5
gcutajar
Typewritten Text
gcutajar
Typewritten Text
Dance floor = 185.64 sqm Carpet area = 475.82 (around dance floor including foyer area)
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
Page 9: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill
admin
Areas marked in red do not need to be cleaned
admin
Robinvale Depot
Page 10: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill
Page 11: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Robinvale Senior Citizen Centre

37 Robin Street, Robinvale

FIRE BLANKET

N

Building area = 328 sqm

Page 12: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill
admin
Areas marked in red are not to be cleaned
Page 13: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

SPLATT STREET OFFICE45 Splatt Street, Swan Hill

TO SPLATT STREET

N

Zone 3

TO BEVERIDGE

STREET

Alarm Zone 2

MAINS FAIL

AUTOMATIC

START POWER

GENERATOR

Zone 1

A

A

A

A

Basement

Archives

Date Issued Validation Date Signature Date Version

FIRE BLANKET

19/11/12 19/11/12 02

19/05/13

19/11/13

19/05/14

19/11/14

19/05/15

PLOT DATE 7/02/1997

D

D

D

D

D

D

B

B

B

B

B

EXISTING SINK UNITTO REMAIN

EXISTINGSINK UNITTO REMAIN

EXISTINGSKYLIGHT

C EXISTINGCOUNTERTO REMAIN

B

B

C/SP

C/SP

C

D D D

DBB B

D

D

D

D

D

D

B B

B B C C

C

C

C

B

B B B B B B

D DD D D

D

D

DBD BBD

C

B

B

B

D

B

C

D

D

C2

C C3

D

C C

C3

D

D

C2C2

C2 C2

D

D

ROLLERDOOR

NEW PLASTERBOARDLINING & SKIRTINGTO MATCH EXISTING

RELOCATED SINKUNIT (REMOVE EXISTINGRANGE HOOD, MAKE GOOD)

C

FE

FE

FE

SCREEN

SCREEN

D

D

TO FIT SINK UNIT

D

OFFICE ALTERATIONS & ADDITIONS

D

D

NEW OUTDOORDECKINGPERGOLA

FH

STAGE A

NEW BUILDING

EXIST. BUILDING

STAGE B

EXIST. BUILDING

NEW BUILDING

STAGE A

STAGE B

21 3 5 7 9

D

C

B

A

21 3 5 7 9

UP

FH

M/W

Brenda BOWEN

Ken FULFORD

Judy HARGREAVES

Gra

ham JARVIE

Roger LAMBERT

Han

s PR

OEBSTI

NG

Guy ROMEO

John WEEKLEY

Kerry Y

OUNG

Bryan DONHARDT

Anthony DUFFIN

Tony HEFFER

Belinda HOWARD

David LENTON

Carol LEVERETT

Mully PEARSE

Lyn VALLANCE

Jenny CURTHOYS

Michael BEASY

Rachael BLANDTHORN

Ash FREE

Margie FORD

Jan FREE

Joe MURPHY

Ken SYMONS

Geoff GRAY

Lauchlan WOODWARD

Mary MOORE

David LEAHY

Warren SNYDER

Kristy STEWART

Matthew THOMPSON

Nicole DUNSTONE

Dennis HOVENDEN

Sharon BARNES

Sue MAHON

Grant SMETHURST

Lisa FARACI

Tim LEWIS

Sam UEBERGANG

Jodi HALL

Leiyh MCPHEE

Amber Wilson

Leah FARROW

Excutive Meeting Room

Eleanar SMITH

Jo VAN

Ronice GRAHAM

Was

antha OPA

NAY

AKA

Andrew BRUGGY

Bruce MYERS

Frans Tursi

Interview Room

Fax Room

Records Storage

Plan Storage

Jan McEWAN

Warren TAYLOR

Kirsty S

MIT

H

Tracy Burrell

Photo Copy Room

Grant JONES

Dione

THOMPSO

NJess

e NIE

TVELD

T/Erin

RAG

GAT

Car

ol F

ITZP

ATRIC

K

Mazen ALDAGHSTANI

Libb

y BR

ECEVIC

Matt A

HEAR

N

James CUNNING

Risk ManagementT

Officer

UP

Katie MATHIESON

Sandra JACOBSEN

Tele Conference Room

PLOT DATE 7/02/1997

DEMOLISH & REMOVEALL EXISTING PLANTER BOXES AND MAKE GOODFLOOR TO TAKE CARPET

REMOVE EXISTING LIGHTFITTINGS AND MAKE GOOD WALL.

REMOVE EXISTING MECHANICALA/C OUTLETS IN WALL ANDMAKE GOOD WALL

RELOCATE FIREHYDRANT & HOSEREEL TO NEWLOCATION. REFERARCH. DRG A2

RELOCATE SHS COLUMNS.REFER TO STRUCTURALDRAWINGS FOR DETAILS

DEMOLISH & REMOVE EXISTING BOX GUTTER,SUMPS AND ASSOCIATED DOWNPIPES

REMOVE & RELOCATE WINDOWS W1 -W8 INCLUSIVE

W3

W4 W5

W1

W2

W6 W7 W8

RELOCATE OVERHEAD

& BENCH LEVELCUPBOARDS, SINK &BWU TO NEW LOCATION.REFER ARCH. DRG A2

W10

W9

OFFICE ALTERATIONS & ADDITIONS

REMOVE SHEET

VINYL FLOORING

W11

EXISTINGTEMPORARY WALL

3000 HIGH

D3

D4 D5 D6

D9 D10

D7

D17

D54

D14

D13

D12

D8

D11

D21

D22

D20D23

D19

D45

D42

D44

D43

D41

D52

D39

D37

D36 D35

D29

D28

D25 D24

D26 D27

D31

D30

D32 D34

D33

D40

D2

D15

D16

D18

D38

D46

D47 D48

D49

D51 D50

D53

D55D56

D1

D57

D58

NEW BUILDING

EXISTING BUILDING

STAGE A

NE

W B

UIL

DIN

G

NE

W B

UIL

DIN

G

NEW BUILDING

EXISTING BUILDING

3 3

STAGE A

C

C

A

A

1 1

B

B

STAGE B

STAGE B

NEW BUILDING

FOR REUSE OR STORAGE AS NOTEDCAREFULLY REMOVE WORKSTATIONS & JOINERY

CONSTRUCTION & SERVICE DRAWINGS.

MATCH EXISTING ADJACENT SURFACES.ALL DISTURBED SURFACES TO BE MADE GOOD TO

DEMOLITION DRAWING TO BE READ IN CONJUNCTION WITH

POINTS ARE TO BE DISCONNECTED

EXISTING PARTITIONS TO BE

AND REMOVED

EXISTING PARTITIONS TO REMAIN IN POSITION.

ALL POWER, DATA, & PHONE

DEMOLISHED.

DEMOLITION NOTES

RE-USED IN THE NEW FITOUT UPON APPROVAL

BEFORE WORKS COMMENCE.ANY QUERRIES ARE TO BE CONFIRMED WORKS AS SHOWN ON THE DRAWINGS BY SITE INSPECTION.CONTRACTOR TO CONFIRM THE EXTENT OF DEMOLITION

FURNITURE TO BE DEMOLISHED AND MAY BE NOTE: EXISTING PARTITIONS, SCREENS, DOORS & DOOR

OF THE SUPERINTENDENT.

SCOPE OF WORKS:

1. DEMOLISH AND REMOVE ALL WALLS AND DOORS SHOWN

DOTTED.

2. REMOVE AND REUSE AS DETAILED ON OTHER DRAWINGS ALLJOINERY ITEMS SHOWN DOTTED.

3. REMOVE AND REUSE ALL WINDOWS SHOWN DOTTED(W1 - W10 INCLUSIVE).

4. DEMOLISH AND REMOVE ALL CEILING GRID MEMBERS SHOWNDOTTED.

5. DEMOLISH AND REMOVE ALL LANDING AND STAIRS SHOWN DOTTED.

6. DEMOLISH AND REMOVE ALL SANITARY PLUMBING IN JOINERYTO BE REMOVED AND SEAL SERVICES AT POINT OF CONNECTIONTO MAIN.

7. REMOVE AND RELOCATE EXISTING ELECTRICAL FITTINGS.REFER ELECTRICAL DRAWINGS FOR DETAILS.

8. REMOVE AND RELOCATE EXISTING MECHANICAL AIR CONDITIONINGOUTLETS. REFER MECHANICAL DRAWINGS FOR DETAILS.

9. DEMOLISH AND REMOVE EXISTING BOX GUTTERS SHOWN DOTTED.

TEMPORARY WALLAS NOTED ON DRAWING

10. CONSTRUCTION OF TEMPORARY STEEL STUD PLASTERBOARD LINEDWALL COMPLETE WITH EXISTING POWER, DATA AND VOICE SERVICESRELOCATED FROM EXISTING (TO BE DEMOLISHED) NORTH WALL OFBUILDING.TEMPORARY WALL TO BE REMOVED AND SERVICES DISCONNECTEDUPON PRACTICAL COMPLETION OF STAGE A.

4

W3

W4 W5 W6 W7 W8 W9 W10

W11

2 3

1512

W2

W1

8 1

ALL DIMENSIONS TO MATCH EXISTING UNLESS NOTED OTHERWISE

OUTDOOR

DECKING

PERGOLA

XA9

D53

D58

NEW

D52

A9 A7 A8 A8

EXISTING LINE OF EXTERNAL FACE OF WALL

ASSET MANAGEMENT

COMMUNITY SERVICES

HEALTH

TECHNICAL SUPPORT

TECHNICAL SUPPORT

SPECIAL

BUILDING

BUILDINGPLANNING

PLANNING

ENVIROMENTAL

PLAN ROOM

FILES ROOM

FILES ROOM

HUMAN

PHOTOCOPYROOM

CHILD CARE

AFTERSCHOOL

ARTS

CULTURAL

RATES &

CUSTOMER

SERVICE

BACK DOOR

TEA ROOM

FINANCEFINANCE

FINANCEPRINT ROOM

STATIONARYROOM

RISKCOMMERCIAL

PURCHASING

MANAGEMENT

SPECIALEVENTS

RURALYOUTHCORPORATE

SUPPORT

MANAGERINFRASTRUCTURE

C.E.O

COMPUTER

SUPPORTSTRATEGICOFFICER

FAMILY DAY CARE

COMMUNITY

EXECUTIVE

MEETING ROOM

INTERVIEW ROOM

RECEPTION

FRONT

DOOR

RECEPTION

BUILDING/PLANNING/ENGINEERING

FACILITATION

CUSTOMER

SERVICE

COMMUNITY SERVICES

RESOURCES SERVICES

SERVICESCOMMERCIAL

& ENVIROMENT

PHOTOCOPYROOM

COMMUNITY

SERVICESSERVICES

CORPORATE

OFFICER

PROJECTSSERVICES

ENGINEERING

MANAGER

SERVICES

36.4m

43

.5m

21

.7m

19

.1m

9.3m

6.0m

4.4m

9.2

m

6.2

m

4.4m

4.8m

12

.8m

32.0m

4.5m

13

.1m

2.7

m

Building AreaGround = 1580 sqmDownstairs = 194 sqm

Title

UP

FH

M/W

Admin. Development

Engineering Admin

Asset Manager

Building Manager

Senior Revenue Officer

Info Co-Ord

Customer Service

Senior Records Officer

Dir Corp Services

Info Officer

Cleaner

Planning Officer

Director Develop

FINANCE DEPARTMENT

Director Infrastructure

IT Department

CEO

Info Officer

Planning Officer

Receptionist

HR Officer

Cleaner

HR Admin

Revenue Officer

Admin Officer

Revenue Projects

ENGINEERING SERVICES

FAMILY DAY CARE

Excutive Meeting Room

Admin Officer

IT Manager

Valuer

Interview Room

Computer Room

Fax Room

Staff Room

Senior Accountant

Family Youthand Children's

Services Manager

Commercial Services Manager

Contract Officer

Planning Officer

Dir Comm & Cultural Services

Admin Officer

Corporate Governance

Personal Assistant to CEO

Photo Copy Room

Exec Support Officer

OUT OF SCHOOL HOURS

Environment Manager

Building Surveyor

Planning Manager Manager Engineering Services

Payroll

Manager Major

CadetBuilding

Projects And Waste

Officer

Officer

Receptionist

Revenue Manager

& Planning

Surveyor

FIRE BLANKET

FIP

Areas marked in pink are not to be cleanedAreas marked in blue are a monthly clean

gcutajar
Typewritten Text
gcutajar
Typewritten Text
Building Area Ground = 1580 sqm Downstairs = 194 sqm
Page 14: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Art Gallery

Monash Drive, Swan Hill

YOU AREHERE

N

Covered

Grass area

FIP

Areas marked in pink do not need to be cleaned

gcutajar
Typewritten Text
gcutajar
Typewritten Text
Building Area
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
= 620 sqm
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
gcutajar
Typewritten Text
Page 15: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Rolling Door

KEEP CLEAR

Generator

SB

Swan Hill Depot56 Saleyards Road, Swan Hill

Workshop & Amenities BuildingBuilding area = 190 sqm(Offices, toilets and lunch room

Depot OfficeBuilding Area = 191 sqm

MECC BuildingBuilding area = 120 sqm(excluding stores area)

Areas marked in are not to be cleanedpink

Page 16: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

CO

NC

ER

TIN

A D

OO

RS

Swan Hill Maternal Child & Health154 Curlewis St, Swan HillN

TO CURLEWIS STREET

FIRE BLANKET

Page 17: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Swan Hill Library

67 Campbell Street, Swan Hill

N

EXITTO CAMPBELL ST

TO CURLEWIS STEXIT

TO CURLEWIS STEXIT

Building Area = 1520 sqm

Area marked in pink is not to be cleaned

Page 18: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

Swan Hill Senior Citizens Club

125 Curlewis Street, Swan Hill

N

Building area = 350 sqm

Page 19: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill

UP

SB

SB

UP

FWG

FHR HWS

UP

SB

HWS

BLANK

BLACK TABS

BLANK

BLANK

BLANK

BLANK

BLANK

BLANK

BLANK

BLANK

LEGS & BORDER

SPARE

LX 1

SPARE

SPARE

SPARE

SPARE

SPARE

LX 2

LX 3

LX 4

LX 5

LEGS & BORDER

LEGS & BORDER

LEGS & BORDER

LEGS & BORDER

R

Q Q

R

M

P

O

N

K

J

L

M

P

O

N

K

J

L

F

H

I

G

D

E

F

I

H

G

D

E

B

A

C

B

A

C

LEGS & BORDER

SPARE

SPARE

6

5

4

LX 1

SPARE

LEGS & BORDER

2

3

1

7LEGS & BORDER

LEGS & BORDER

LX 4

LX 3

LX 2

SPARE

SPARE

SPARE

20

19

18

17

16

15

14

13

12

11

10

9

8BLANK

BLANK

BLANK

BLANK

BLANK

BLANK

LEGS & BORDER 21

22

23

BLANK

LX 5

24

25

26

BLANK

BLACK TABS

BLANK

UP

UP

Swan Hill Town Hall

53-57 McCallum St, Swan Hill

N

TO McCALLUM STREET

TO BEVERIDGE

STREET GROUND FLOOR

2 FLOOR

1 FLOOR

GROUND FLOOR

FIRE BLANKET

FIP

MEZZANINE FLOORMEZZANINE FLOORMEZZANINE FLOORMEZZANINE FLOOR

Section 1

Section 2

Section 3

Section 4

Section 5

Section 6

Section 7

Section 8

Special requirement:

Areas marked in pink are to be cleaned fortnightly

Building area

Ground floor = 1202 sqm

First floor = 1202 sqm

Mezzanine = 324 sqm

Page 20: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill
admin
Areas marked in red are not to be cleaned
Page 21: BEVERIDGE STREET OFFICE 134 Beveridge Street, Swan Hill